Think Tram was a Victorian Government program aimed at improving Melbourne's tram network. The intended benefits were reduced travel time and better reliability, and better accessibility. The program was run by VicRoads, in partnership with Yarra Trams and Public Transport Victoria.[1] The program targets individual routes or streets with a mixture of different treatments, including the sometimes controversial superstops.

A Superstop in St Kilda

Types of treatment

edit
 
Superstop under construction in June 2006

Superstops

edit

Superstops are wheelchair-accessible platform stops, with rain shelters, seating, and real time arrival displays. Superstops, when served by low-floor trams, comply with the Disability Discrimination Act 1992. In general, introduction of superstops along a route has been accompanied by a reduction in the total number of stops and relocation of existing stops.

Traffic light priority

edit

Traffic lights are switched in favour of approaching trams before (or as soon as possible after) a tram stops at an intersection. Right turning traffic may also be given priority to clear the path of the tram.

Separation kerbing and right turn bans

edit
 
Full-time tram lane

Yellow separation strips and/or signage are introduced to prevent turning cars from blocking the progress of trams. Right-turn bans and hook turns have been introduced at certain intersections.

Targeted routes

edit

Criticism

edit

While many tram users have welcomed the new Superstops, there has also been complaints at the reduction in the number of stops and the introduction of new mid-block stops. A "funeral", coordinated by the Public Transport Users Association, was held for the tram stops being closed, featuring a procession with coffin from the former tram stops to the Transport Minister's office.[8] Despite these protests, the program continued.

 
Hook turn sign

During a trial of a number of Think Tram treatments in Clarendon Street, South Melbourne, traders complained about the reduction in parking availability. They successfully lobbied to have the departure-side stops returned to their old arrival-side configuration, although the introduced hook turns were kept.[9]

References

edit
  1. ^ Think Tram Program VicRoads
  2. ^ Swanston Street, Carlton - Proposed Tram Project Franklin Street to Grattan Street VicRoads
  3. ^ St Kilda Road - Platform Tram Stops VicRoads
  4. ^ Think Tram during Sydney Road Cyclovia Yarra Trams 26 May 2006
  5. ^ Beacon Cove superstop celebration Yarra Trams 14 October 2002
  6. ^ Think Tram: Collins Street Tram Improvements Yarra Trams 31 January 2005
  7. ^ Batchelor prompts motorists to Think Tram Yarra Trams 5 January 2005
  8. ^ "City Mourns Tram Stop, Demands a Resurrection" (Press release). Public Transport Users Association. 19 May 2005. Retrieved 5 March 2007.
  9. ^ Clarendon Street tram stop trial gets the hook The Age 7 June 2005

Further reading

edit
  • Some Information To Get You Thinking, VicRoads Publication No. 01079