The Light Rail Transit Authority[1] (LRTA) is a public transport operator that is responsible for the construction, operation, maintenance and/or lease of Manila Light Rail Transit System in the Philippines. Founded by Philippine President Ferdinand E. Marcos on July 12, 1980. It is organized as a government-owned and controlled corporation under the Department of Transportation (DOTr) as an attached agency.

Light Rail Transit Authority
Native name
Pangasiwaan ng Magaan na Riles Panlulan
Company typeGovernment-owned and Controlled Corporation
IndustryPublic transport
FoundedJuly 12, 1980; 44 years ago (1980-07-12)
HeadquartersLRTA Compound, Line 2 Santolan Depot, Pasig, Philippines
Area served
Metro Manila
Key people
Gen. Reynaldo I. Berroya (Ret.), Administrator

Atty. Jose Jobel V. Belarmino, Deputy Administrator for Administrative, Finance and Automated Fare Collection System

Mr. Paul Y. Chua, Deputy Administrator for Operations & Engineering
ServicesRail Service
Revenue1,564,306,670 (2019)
Total assets₱59,791,862,600 (2019)
OwnerGovernment of the Philippines under Department of Transportation
Number of employees
1,159 of which 342 are permanent/regular employees, 480 contractual personnel and 337 contract of services employees (2019)
Websitewww.lrta.gov.ph

Train service

Manila Light Rail Transit System Line 1 (Green Line) Manila Mass Rapid Transit System Line 2 (Blue Line) Manila Light Rail Transit System Line 6 (Proposed)
Ownership Light Rail Transit Authority** Light Rail Transit Authority TBA
Operations & Maintenance Light Rail Manila Corporation

(thru PPP Scheme)[2]

Light Rail Transit Authority TBA

**LRTA is responsible for monitoring the Line 1 concessionaire Light Rail Manila Corporation.

Board of Directors

The Board of Directors is composed of eight (8) ex-officio cabinet members namely the Secretary of the DOTr as Chairman, the respective Secretaries of the DPWH, DBM, DOF and NEDA, the Chairman of the MMDA and the LTFRB and the Administrator of the LRTA and one (1) representative from the private sector.

The Board is tasked to issue, prescribe, and adopt policies, programs, plans, standards, guidelines, procedures, rules, and regulations for implementation, enforcement, and application by the LRTA Management. The Board also convenes to resolve operations-related issues and concerns and other matters requiring immediate attention and resolution.

Ongoing projects

Line 1 O&M, Cavite Extension and Capacity Expansion Project

During the presidency of Pres. Benigno Aquino III, the Department of Transportation and Light Rail Transit Authority signed a 32- year concession agreement with Light Rail Manila Corporation, a private consortium composed of AC Infra, Metro Pacific Light Rail Corporation and Macquarie Group for the Line 1 Operations & Maintenance, construction of the Cavite Extension and Capacity Expansion.

Under the concession agreement, LRMC is responsible for the Operations & Maintenance of Line 1 and construction of the Cavite Extension while LRTA is responsible for procuring 120 new Light Rail Vehicles for the Capacity Expansion and acquisition of the Right-of-way for the Cavite Extension. As of April 30, 2021, the LRTA already acquired 88.21% equivalent to 202 lots of the total target of 229 private and public lots.

-On April 2021, LRTA acquired a total of 18/18 additional lots under ROW-P1, 58/75 lots for ROW-P2 and 27/37 under ROW-P3.

-Ongoing negotiation and/or expropriation of the remaining lots.

  • Basic ROWA: Acquired 88.0% equivalent to 183 out of 208 lots.
  • Additional ROWA: Acquired 90.5% equivalent to 19 out of 21 lots.

1-B. Identified Intermediate ROW(IIROW)

Status Acquired: 88% equivalent to 30 lots of the total target of 34 lots. Remaining lots are ongoing negotiation and/or expropriation.

Line 2 East Extension Project

The Line 2 East Extension Project is a 4-km extension project from the present Santolan station in Marikina up to Masinag station in Antipolo, Rizal which will add (2) additional stations from the present 11 stations: the Emerald & Masinag Stations. The Department of Transportation and Light Rail Transit Authority awarded the Package 1 (Construction of Viaduct) and Package 2 (Construction of the two stations) to D.M.C.I. Consunji, Inc. The project was approved by the National Economic and Development Authority in 2012 and construction began in 2015. The East Extension Project was inaugurated on July 1, 2021 and will begin operations on July 6.

Future projects

Philippine Railway Institute (Railway Development Center)

In January 2017, LRTA Administrator Gen. Reynaldo I. Berroya (Ret.) announced the plan to establish a railway school in the country to improve the technical skills of LRTA employees and serve as a training ground for them. As of August 2017, the LRTA is procuring Rolling Stock Simulators for the project.

The project involves construction of passenger walkway to and from the Line 2 Araneta Center-Cubao Terminal Station and Line 3 Araneta Center-Cubao Station to provide convenient transfer between the two railway systems.