Jump to content

Manchester Metrolink: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m Reverted edits by 94.2.136.22 (talk) to last version by Wiki8047
Jza84 (talk | contribs)
per talk, and per WP:LEAD/WP:CITE/WP:A/WP:GA
Line 1: Line 1:
{{good article}}
{{good article}}
{{Use British English|date=January 2013}}
{{Use British English|date=January 2013}}
{{Use dmy dates|date=November 2013}}
{{Infobox Public transit
{{Infobox Public transit
|box_width = 325px
| box_width = 325px
|name = Metrolink
| name = Metrolink
|image = Manchester Metrolink 2008 logo.png
| image = Manchester Metrolink 2008 logo.png
|imagesize = 225px
| imagesize = 225px
|image2 = Greater Manchester Metrolink - tram 3009A.jpg
| image2 = Greater Manchester Metrolink - tram 3009A.jpg
|imagesize2 = 300px
| imagesize2 = 300px
|caption2 = [[M5000]] at [[Exchange Quay Metrolink station]]<br>in August 2011
| caption2 = An [[M5000]] at [[Exchange Quay Metrolink station]] in [[Salford, Greater Manchester|Salford]]
|locale = [[Greater Manchester]]
| locale = [[Greater Manchester]]
| transit_type = [[Tram]]/[[Light rail]]<ref>{{cite web | url=http://www.lrta.org/world/worldu-z.html#GB|publisher=Light Rail Transit Association|title=World Systems List index#GB}}</ref><ref name=statsrelease/><ref name=saldel>{{cite web |url= http://www.salford.gov.uk/d/salford-idp-light-rail.pdf |publisher= Salford City Council |title=Salford Infrastructure Delivery Plan |date=February 2012 |accessdate=22 January 2013}}</ref>
|transit_type = [[Tram]]/[[Light rail]]
|lines = 6 (2 under construction)
| lines = 6
|stations = 77
| stations = 77
|annual_ridership =29.2 million (2013/14)
| annual_ridership =25 million (2012/13)<ref name=statsrelease/>
|headquarters = Metrolink House<br />Queens Road<br />[[Cheetham Hill]]<br />Manchester<br /> England
| headquarters = Metrolink House{{sfn|Holt|1992|p=79}}<br />Queens Road<br />[[Cheetham Hill]]<br />Manchester<br /> England
| began_operation = {{start date|1992|04|06|df=yes}}
|website = {{url|www.metrolink.co.uk/Pages/default.aspx|Metrolink}}
| owner = [[Transport for Greater Manchester]]
|began_operation = 6 April 1992
|owner = [[Transport for Greater Manchester]]
| operator = [[RATP Group]]<ref name=rgi20110802 />
| chief_executive = Peter Cushing <small>(Metrolink Director)</small><ref name=cush/><br/>Chris Coleman <small>(Managing Director)</small>{{sfn|Coward|Henderson|2014|p=7}}
|operator = [[RATP Group]]
| vehicles = ≤94 [[M5000]]s
|chief_executive = Peter Cushing <small>(Metrolink Director)</small><br/>Chris Coleman <small>(Managing Director)</small>
| train_length = {{convert|28.4|m|ft}}
|vehicles = 84<!--104 by 2017--> [[M5000]]s (May 2014)
| system_length = {{convert|48.5|mi|km}}<ref name=RTC/>
(104 [[M5000]]s by 2017)
|train_length = {{convert|28.4|m|ft|abbr=on}}
| track_gauge = {{RailGauge|sg|al=on}}
| el = [[Overhead line]] (750 [[Volt|V]] [[Direct current|DC]])
|system_length = {{convert|48|mi|km|abbr=on}}
| minimum_radius_of_curvature = {{convinfobox|25|m||ft}}{{sfn|Ogden|Senior|1992|p=107}}
|track_gauge = {{RailGauge|1435|allk=on}}
| top_speed = {{convert|50|mph|kph|}}{{sfn|Ogden|Senior|1992|p=107}}
|el = [[Overhead line]] (750 [[Volt|V]] [[Direct current|DC]])
| map_name = Metrolink network schematic
|minimum_radius_of_curvature = {{convinfobox|25|m||ft}}
|top_speed = {{convert|50|mph|kph|abbr=on}}
| map = {{infobox rdt|Metrolink RTD|navbar=0}}
| map_state = collapsed
|map_name = Metrolink network schematic
| website = [http://www.metrolink.co.uk/Pages/default.aspx www.metrolink.co.uk]
|map = {{infobox rdt|Metrolink RTD|navbar=0}}
}}
|map_state = collapsed }}
'''Metrolink'''{{#tag:ref|The system is branded '''Metrolink'''.{{sfn|Ogden|Senior|1992|p=4}}<ref name=leg>{{cite web |url= http://www.legislation.gov.uk/uksi/2009/2726/memorandum/contents |title= Explanatory Memorandum to the Greater Manchester (Light Rapid Transit System) (Exemptions) Order 2009 |publisher=legislation.gov.uk |quote=The Order grants exemptions from certain requirements of railways legislation currently applying to the Greater Manchester Light Rapid Transit System ("Metrolink")&nbsp;... |year=2009 |accessdate=19 January 2013 |author=Department for Transport}}</ref><ref name=case>{{cite web |url= http://casestudies.pepesec.eu/archives/79 |title=Procurement of hydro-electricity for Metrolink – the Greater Manchester light rapid transit system. |publisher= Energy Planning Knowledge Base |first=Adrian |last=Slatcher |date=17 December 2010 |accessdate=19 January 2013 |quote= GMPTE own the Greater Manchester light rapid transit system – known as Metrolink. |location =Manchester}}</ref> The [[Department for Transport]] refers to the system as '''Manchester Metrolink''',<ref name=statsrelease>{{cite web |url= https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/207006/light-rail-and-tram-statistics-2012-13.pdf|publisher= [[Department for Transport]]|date=18 June 2013 |accessdate=11 July 2013 |title=Light Rail and Tram Statistics: England 2012/13}}</ref> an alternative unofficial name.{{sfn|Ogden|Senior|1992|p=106}}<ref name=500tram/> It is defined in Acts of Parliament and Byelaws as the '''Greater Manchester Light Rapid Transit System''';<ref name=leg/><ref name=case/> and sometimes (unofficially) called '''Greater Manchester Metrolink'''.{{sfn|Ogden|Senior|1992|p=39}}|group=note}} is a [[light rail]] system in [[Greater Manchester]], England. The network consists of six lines which radiate from [[Manchester city centre]] and terminate at [[Altrincham]], [[Ashton-under-Lyne]], [[Bury]], [[Didsbury]], [[Eccles, Greater Manchester|Eccles]], and [[Rochdale]]. The system is owned by [[Transport for Greater Manchester]] (TfGM) and operated and maintained under contract by [[RATP Group]].<ref name=saldel/><ref name=rgi20110802>{{cite news |url= http://www.railwaygazette.com/nc/news/single-view/view/ratp-buys-manchester-metrolink-operator.html |title=RATP buys Manchester Metrolink operator |date=2 August 2011 |work=[[Railway Gazette International]] |location =London}}</ref> Also referred to as '''Manchester Metrolink''',<ref name=statsrelease/> 25 million passenger journeys were made on the system in 2012/13.<ref name=statsrelease/>


A light rail system for Greater Manchester was born of [[Greater Manchester County Council]]'s obligations to provide "an integrated and efficient system of public transport" under its [[structure plan]] and the [[Transport Act 1968]].{{sfn|Holt|1992|pp=6–7}} Greater Manchester's public transport network suffered from poor north – south connections, exacerbated by the location of [[Manchester]]'s main railway stations, [[Manchester Piccadilly station|Piccadilly]] and [[Manchester Victoria station|Victoria]], which were unconnected and lay at opposing edges of central Manchester. Abandoning the [[monorail]] and [[Rapid transit|underground]] options conceived in the 1960s and 1970s, light rail was proposed in 1982 as the best and most economical public transport solution for Manchester city centre and the surrounding Greater Manchester [[metropolitan area]], and gathered support throughout the 1980s as an appropriate integrated [[commuting|commuter]] service. Government approval was granted in 1988 and the network began operating services between [[Bury Interchange]] and Victoria on 6 April 1992. This founded the United Kingdom's first modern [[street running]] rail system and its second operational public [[tram]] system; the 1885-built [[Blackpool tramway]] being the only [[heritage tram]] system in the UK which endured up to Metrolink's creation.<ref>{{cite web |url=http://www.railway-technology.com/projects/manchester/|publisher=Railway Technology|title=Manchester Metrolink, United Kingdom|accessdate=12 July 2013|year=2010}}</ref>
'''Metrolink'''{{#tag:ref|The system is branded '''Metrolink'''.{{sfn|Ogden|Senior|1992|p=4}}<ref name=leg>{{cite web |url= http://www.legislation.gov.uk/uksi/2009/2726/memorandum/contents |title= Explanatory Memorandum to the Greater Manchester (Light Rapid Transit System) (Exemptions) Order 2009 |publisher=legislation.gov.uk |quote=The Order grants exemptions from certain requirements of railways legislation currently applying to the Greater Manchester Light Rapid Transit System ("Metrolink")&nbsp;... |year=2009 |accessdate=19 January 2013 |author=Department for Transport}}</ref><ref name=case>{{cite web |url= http://casestudies.pepesec.eu/archives/79 |title=Procurement of hydro-electricity for Metrolink – the Greater Manchester light rapid transit system. |publisher= Energy Planning Knowledge Base |first=Adrian |last=Slatcher |date=17 December 2010 |accessdate=19 January 2013 |quote= GMPTE own the Greater Manchester light rapid transit system – known as Metrolink. |location =Manchester}}</ref> The [[Department for Transport]] refers to the system as '''Manchester Metrolink''',<ref name=statsrelease>{{cite web |url= https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/320645/light-rail-and-tram-statistics-2013-14.pdf|publisher= [[Department for Transport]]|date=17 June 2014 |accessdate=18 June 2014 |title=Light Rail and Tram Statistics: England 2013/2014}}</ref> an alternative unofficial name.{{sfn|Ogden|Senior|1992|p=106}}<ref name=500tram/> It is defined in Acts of Parliament and Byelaws as the '''Greater Manchester Light Rapid Transit System''';<ref name=leg/><ref name=case/> and sometimes (unofficially) called '''Greater Manchester Metrolink'''.{{sfn|Ogden|Senior|1992|p=39}}|group=note}} (also referred to as '''Manchester Metrolink''') is an English [[light rail]] system in [[Greater Manchester]]. The network consists of six lines radiating from [[Manchester city centre]] to [[Altrincham]], [[Ashton-under-Lyne]], [[Bury]], [[Didsbury]], [[Eccles, Greater Manchester|Eccles]], and [[Rochdale]]. The system is owned by [[Transport for Greater Manchester]] (TfGM) and operated and maintained under contract by the [[RATP Group]]. In 2013/14, 29.2 million passenger journeys were made.


Metrolink has 77 stops along {{convert|48.5|mi|km}} of [[standard gauge]] track<ref name=RTC>{{cite web|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/rochdales-first-passenger-tram-80-6897266 |work=Manchester Evening News|date=31 March 2014|accessdate=31 March 2014|title=Passenger trams start running to and from Rochdale town centre for first time in 80 years|first=John|last=Scheerhout}}</ref> which is routed through seven of the ten boroughs of Greater Manchester. The system has a mix of designated light railway (segregated from other traffic) and on-street tramway (shared with pedestrians and motor vehicles). Its fleet of passenger vehicles is composed of [[M5000|Bombardier Flexity Swift M5000s]], but also used [[T-68|Ansaldo Firema T-68/T-68As]] between 1992 and 2014. These vehicles were originally termed LRVs (light rail vehicles),{{sfn|Holt|1992|p=30}} but have become widely known as trams.<ref name="futuremetrolink">{{cite web |url=http://www.metrolink.co.uk/futuremetrolink/Pages/new-trams.aspx|publisher= Metrolink|title=New Trams |accessdate=11 July 2013|author=TfGM}}</ref> Other changes include a yellow and silver branding and [[livery]], which replaced the system's original grey and [[aquamarine (color)|aquamarine]] identity in 2008.
The implementation of a light rail network was conceived as a way to extend existing railway lines into the city centre. Government approval to build the first phase was granted in 1988 with the first line opened between [[Bury Interchange|Bury]] and [[Manchester Victoria station]] in April 1992. It was the United Kingdom's first modern light rail system. Since then a further five lines have opened, and today it is the [[Transport in the United Kingdom#Trams and light rail|most extensive light rail system]] in the United Kingdom with a network of {{convert|48|mi|km|}} and 77 stops. A sixth line to [[Manchester Airport railway station|Manchester Airport]] is under construction will be operational by the end of 2014 – 12 months ahead of schedule.<ref>{{cite web |title=Manchester Airport Metrolink tram line completed early |url=http://www.bbc.co.uk/news/uk-england-manchester-27937849 |work=BBC News |date=20 June 2014 |accessdate=2014-06-20}}</ref>


Expansion of Metrolink has been a key strategy of transport planners in Greater Manchester, who have overseen its development in successive projects, known as Phases 1, 2, 3a, 3b and 2CC, which, upon completion of Phases 3b and 2CC in 2016/17, will make Metrolink the largest light rail network in the United Kingdom, with {{convert|60|mi|km|}} of track and 93 stops, handling an estimated 45 million passenger journeys a year.<ref name=catchup/> TfGM have endorsed further expansion with proposals for new lines to [[Stockport]] and [[Port Salford]], and the addition of [[tram-train]] technology.
The initial phase involved converting two existing heavy railway lines and linking them via a new tram line through the city centre. Later extensions have been a combination of railway line conversions and purpose-built tramway paths. The system has a mix of designated light railway (segregated from other traffic) and on-street tramway (shared with pedestrians and motor vehicles) and serves seven of the ten Greater Manchester [[Metropolitan borough]]s. It is operated by a fleet of [[M5000]] trams.


==History==
==History==
Line 44: Line 44:
===Origins===
===Origins===
{{see also|Picc-Vic tunnel}}
{{see also|Picc-Vic tunnel}}
A light rail system for [[Greater Manchester]] was born of a desire by the [[Greater Manchester County Council]] to fulfil its obligations to provide "an integrated and efficient system of public transport" under its [[structure plan]] and the [[Transport Act 1968]].{{sfn|Holt|1992|pp=6–7}} Greater Manchester's public transport network suffered from poor north – south connections, exacerbated by the location of [[Manchester]]'s main railway stations, [[Manchester Piccadilly station|Piccadilly]] and [[Manchester Victoria station|Victoria]],{{sfn|Ogden|Senior|1992|p=4}}{{sfn|Williams|2003|p=273}} which were unconnected and located at opposite ends of the [[Manchester city centre|city centre]].{{sfn|Holt|1992|pp=6–7}}{{sfn|Williams|2003|p=273}} Piccadilly and Victoria were built in the 1840s by rival companies on cheaper land on the fringes of the city centre, resulting in poor integration and access to the central business zone.{{sfn|Holt|1992|p=4}}
A light rail system for Greater Manchester was born of a desire by the [[Greater Manchester County Council]] to fulfil its obligations to provide "an integrated and efficient system of public transport" under its [[structure plan]] and the [[Transport Act 1968]].{{sfn|Holt|1992|pp=6–7}} Greater Manchester's public transport network suffered from poor north – south connections, exacerbated by the location of [[Manchester]]'s main railway stations, [[Manchester Piccadilly station|Piccadilly]] and [[Manchester Victoria station|Victoria]],{{sfn|Ogden|Senior|1992|p=4}}{{sfn|Williams|2003|p=273}} which were unconnected and located at opposing edges of its city centre.{{sfn|Holt|1992|pp=6–7}}{{sfn|Williams|2003|p=273}} Piccadilly and Victoria were built in the 1840s by rival companies on cheaper land on the fringes of the city centre, resulting in poor integration and access to the central business zone.{{sfn|Holt|1992|p=4}} In as early as 1839, in anticipation of the stations being built, a connecting underground railway tunnel was proposed but abandoned on economic grounds,{{sfn|Ogden|Senior|1992|p=4}}{{sfn|Holt|1992|p=4}} as was an overground suspended-[[monorail]] in 1966.{{sfn|Ogden|Senior|1992|p=21}} [[Transport for Greater Manchester|SELNEC Passenger Transport Executive]] — the body tasked with improving public transport for Manchester and its surrounding municipalities in the 1960s – made draft proposals for a [[Picc-Vic tunnel]],{{sfn|Ogden|Senior|1992|p=22}} "a proposed rail route beneath the city centre" forming "the centrepiece of a new electrified railway network for the region".<ref name=arc>{{cite news |url= http://www.architectsjournal.co.uk/news/astragal/manchester-unearths-forgotten-1970s-tube-line/8627773.article |title= Manchester unearths forgotten 1970s tube line |date=13 March 2012 |work= The Architects' Journal |location =London}}</ref> Despite investigatory tunnelling under the [[Manchester Arndale]] shopping centre,<ref name=arc/> when the Greater Manchester County Council presented the project to the [[United Kingdom Government]] in 1974,{{sfn|Holt|1992|p=5}} it was unable to secure the necessary funding,{{sfn|Donald|Cross|Bristow|1983|p=45}} and was abandoned on economic grounds when the County Council dropped the plans in 1977.{{sfn|Ogden|Senior|1992|p=22}}{{sfn|Holt|1992|p=5}}


In 1982, the Greater Manchester Passenger Transport Executive (GMPTE; the successor to SELNEC PTE) concluded that an overground metropolitan [[light rail]] system to replace or complement the region's under-used heavy railways was the most economical solution to improving Greater Manchester's public transport network, which suffered from poor integration and outdated infrastructure;{{sfn|Williams|2003|p=273}} a Rail Study Group, composed of officials from [[British Rail]], Greater Manchester County Council and GMPTE formally endorsed the scheme in 1984.{{sfn|Holt|1992|pp=6–7}} Abstract proposals based on light rail systems in [[North America]] and [[continental Europe]],{{sfn|Ogden|Senior|1992|pp=26–27}} and a draft {{convert|62|mi|km|adj=on}} network consisting of three lines were presented by the Rail Study Group to the UK Government for funding.{{sfn|Ogden|Senior|1992|p=22}} Following route revisions in 1984 and 1987,{{sfn|Ogden|Senior|1992|p=22}}{{sfn|Ogden|Senior|1992|p=25}} and a trial on 9 February 1987 using [[Docklands Light Railway rolling stock]] on a freight-only line adjacent to [[Debdale Park]],{{sfn|Ogden|Senior|1992|p=37}} funding was granted by [[HM Treasury]] with the strict condition that the system be constructed in phases.{{sfn|Ogden|Senior|1992|p=22}} Additional funding came from the [[European Regional Development Fund]] and bank lending.{{sfn|GMPTE|2000}}
As early as 1839, in anticipation of the stations being built, a connecting underground railway tunnel was proposed but abandoned on economic grounds,{{sfn|Ogden|Senior|1992|p=4}}{{sfn|Holt|1992|p=4}} as was an overground [[monorail]] in 1966.{{sfn|Ogden|Senior|1992|p=21}} [[Transport for Greater Manchester|SELNEC Passenger Transport Executive]], the body tasked with improving public transport for Manchester and its surrounding municipalities in the 1960s, made draft proposals for a [[Picc-Vic tunnel]],{{sfn|Ogden|Senior|1992|p=22}} "a proposed rail route beneath the city centre" forming "the centrepiece of a new electrified railway network for the region".<ref name=arc>{{cite news |url= http://www.architectsjournal.co.uk/news/astragal/manchester-unearths-forgotten-1970s-tube-line/8627773.article |title= Manchester unearths forgotten 1970s tube line |date=13 March 2012 |work= The Architects' Journal |location =London}}</ref> Despite investigatory tunnelling under the [[Manchester Arndale]] shopping centre,<ref name=arc/> when the Greater Manchester County Council presented the project to the [[United Kingdom Government]] in 1974,{{sfn|Holt|1992|p=5}} it was unable to secure the necessary funding,{{sfn|Donald|Cross|Bristow|1983|p=45}} and was abandoned on economic grounds when the County Council dropped the plans in 1977.{{sfn|Ogden|Senior|1992|p=22}}{{sfn|Holt|1992|p=5}}

In 1982, the Greater Manchester Passenger Transport Executive (GMPTE; the successor to SELNEC PTE) concluded that an overground metropolitan [[light rail]] system to replace or complement the region's under-used heavy railways was the most economical solution to improving Greater Manchester's public transport network, which suffered from poor integration and outdated infrastructure;{{sfn|Williams|2003|p=273}} a Rail Study Group, composed of officials from [[British Rail]], Greater Manchester County Council and GMPTE formally endorsed the scheme in 1984.{{sfn|Holt|1992|pp=6–7}}

Abstract proposals based on light rail systems in [[North America]] and [[continental Europe]],{{sfn|Ogden|Senior|1992|pp=26–27}} and a draft {{convert|62|mi|km|adj=on}} network consisting of three lines were presented by the Rail Study Group to the UK Government for funding.{{sfn|Ogden|Senior|1992|p=22}} Following route revisions in 1984 and 1987,{{sfn|Ogden|Senior|1992|p=22}}{{sfn|Ogden|Senior|1992|p=25}} and a trial on 9 February 1987 using [[Docklands Light Railway rolling stock]] on a freight-only line adjacent to [[Debdale Park]],{{sfn|Ogden|Senior|1992|p=37}} funding was granted by [[HM Treasury]] with the strict condition that the system be constructed in phases.{{sfn|Ogden|Senior|1992|p=22}} Additional funding came from the [[European Regional Development Fund]] and bank lending.{{sfn|GMPTE|2000}}


===Phase 1===
===Phase 1===
[[File:Delta junction, Manchester - geograph.org.uk - 737228.jpg|thumb|left|Construction work at [[Piccadilly Gardens]] in 1991]]
[[File:Altrincham station - geograph.org.uk - 764413.jpg|thumb|left|[[Altrincham Metrolink station]] in July 1992. This stop opened on 15 June 1992 as part of Phase 1.]]
Conversion of the [[East Lancashire Railway 1844–1859|East Lancashire Railway]] (Bury-to-Victoria) and [[Manchester, South Junction and Altrincham Railway]] (Altrincham-to-Piccadilly) heavy rail lines, and creation of a street-level tramway{{sfn|Ogden|Senior|1992|p=74}} through Manchester city centre to unite the lines as a single {{convert|19|mi|km|adj=on}} network,{{sfn|Ogden|Senior|1991|p=17}} was chosen for Phase 1 because the two heavy rail lines were primarily used for commuting to central Manchester, and would improve north – south links and access to the city centre.{{sfn|Ogden|Senior|1991|p=17}}{{sfn|Ogden|Senior|1992|p=73}}{{sfn|Ogden|Senior|1992|p=56}}{{sfn|Ogden|Senior|1991|pp=14–15}} The required parliamentary authority to proceed with Phase 1 was obtained with two Acts of Parliament – the Greater Manchester (Light Rapid Transit System) Act 1988 and Greater Manchester (Light Rapid Transit System) (No. 2) Act 1988.{{sfn|Ogden|Senior|1992|pp=30–31}}
Conversion of the [[East Lancashire Railway 1844–1859|East Lancashire Railway]] (Bury-to-Victoria) and [[Manchester, South Junction and Altrincham Railway]] (Altrincham-to-Piccadilly) heavy rail lines, and creation of a street-level tramway{{sfn|Ogden|Senior|1992|p=74}} through Manchester city centre to unite the lines as a single {{convert|19.2|mi|km|adj=on}} network,{{sfn|Ogden|Senior|1991|p=17}} was chosen for Phase 1 because the two heavy rail lines were primarily used for commuting to central Manchester, and would improve north – south links and access to the city centre.{{sfn|Ogden|Senior|1992|p=73}}{{sfn|Ogden|Senior|1992|p=56}}{{sfn|Ogden|Senior|1991|pp=14–15}}{{sfn|Ogden|Senior|1991|p=17}} The required parliamentary authority to proceed with Phase 1 was obtained with two Acts of Parliament – the Greater Manchester (Light Rapid Transit System) Act 1988 and Greater Manchester (Light Rapid Transit System) (No. 2) Act 1988.{{sfn|Ogden|Senior|1992|pp=30–31}}


On 27 September 1989, following a two-stage tender exercise, the Greater Manchester Passenger Transport Authority awarded a contract to the GMA Group (a consortium composed of [[AMEC]], [[GM Buses]], John Mowlem and Company, and a [[General Electric Company plc|General Electric Company]] subsidiary){{sfn|Ogden|Senior|1992|p=51}} who formed [[Greater Manchester Metrolink Limited]] to design, build, operate and maintain Phase 1 of Metrolink.{{sfn|Ogden|Senior|1992|p=47}} The contract was approved by Minister for Transport [[Michael Portillo]] on behalf of the [[Department for Transport]] on 24 October 1989, and formally signed on 6 June 1990.{{sfn|Ogden|Senior|1992|p=47}}
On 27 September 1989, following a two-stage tender exercise, the Greater Manchester Passenger Transport Authority awarded a contract to the GMA Group (a consortium composed of [[AMEC]], [[GM Buses]], John Mowlem and Company, and a [[General Electric Company plc]] subsidiary){{sfn|Ogden|Senior|1992|p=51}} who formed [[Greater Manchester Metrolink Limited]] to design, build, operate and maintain Phase 1 of Metrolink.{{sfn|Ogden|Senior|1992|p=47}} The contract was approved by [[Michael Portillo]] on behalf of the [[Department for Transport]] on 24 October 1989, and formally signed on 6 June 1990.{{sfn|Ogden|Senior|1992|p=47}}


The [[East Lancashire Railway 1844–1859|Bury line]] closed in stages between 13 July 1991 and 17 August 1991, after which the 1200V DC [[third rail]] electrified line was adapted for a 750V DC [[overhead line]] operation.<ref name=evo>{{cite news |url= http://www.therailengineer.com/2011/11/30/manchester-metrolink-20-years-of-evolution/ |work=The Rail Engineer |title=Manchester Metrolink 20 Years of Evolution |first=Clive |last=Kessell |date=30 November 2011 |accessdate=2 January 2013}}</ref> In Manchester city centre, a tramway – built with network expansion in mind{{sfn|Holt|1992|p=94}} – from Victoria to Piccadilly via [[Market Street, Manchester|Market Street]] and [[Piccadilly Gardens]] connected [[Bury]] to [[Altrincham]] via the city centre. The overhead structures and wiring of the Altrincham line were adapted for light rail.<ref name=evo/> As well as upgrades to signalling and stations on the network, a combined headquarters, depot and control centre was built at [[Cheetham Hill]] on [[Queens Road Metrolink station|Queens Road]], north of Victoria station,<ref name=evo/> at a cost of £8 million (£{{formatnum:{{Inflation|UK|8000000|1991|r=-5}}|0}} as of {{CURRENTYEAR}}{{Inflation-fn|UK}}).{{sfn|Ogden|Senior|1991|p=53}}
The Bury line was closed in stages between 13 July 1991 and 17 August 1991, after which the 1200V DC [[third rail]] electrified line was adapted for a 750V DC [[overhead line]] operation.<ref name=evo>{{cite news |url= http://www.therailengineer.com/2011/11/30/manchester-metrolink-20-years-of-evolution/ |work=The Rail Engineer |title=Manchester Metrolink 20 Years of Evolution |first=Clive |last=Kessell |date=30 November 2011 |accessdate=2 January 2013}}</ref> In Manchester city centre, a tramway – built with network expansion in mind{{sfn|Holt|1992|p=94}} – from Victoria to Piccadilly via [[Market Street, Manchester|Market Street]] and [[Piccadilly Gardens]] connected Bury to Altrincham via Manchester; The overhead structures and wiring of the Altrincham line were adapted for light rail.<ref name=evo/> As well as upgrades to signalling and stations on the network, a combined headquarters, depot and control centre was built at [[Cheetham Hill]] on [[Queens Road Metrolink station|Queens Road]], north of Victoria station,<ref name=evo/> at a cost of £8 million (£{{formatnum:{{Inflation|UK|8000000|1991|r=-5}}|0}} as of {{CURRENTYEAR}}{{Inflation-fn|UK}}).{{sfn|Ogden|Senior|1991|p=53}}


Initially projected to open in September 1991,{{sfn|Holt|1992|p=87}} Metrolink began operation on 6 April 1992 with a service between Victoria and Bury.{{sfn|Ogden|Senior|1992|p=82}}{{sfn|Holt|1992|p=90}} Along with the [[Tyne and Wear Metro]] and [[Docklands Light Railway]], it helped to reintroduce light rail to the United Kingdom.<ref name="The History of Tramways and Evolution of Light Rail">{{cite web |url= http://www.lrta.org/mrthistory.html |title=The History of Tramways and Evolution of Light Rail|publisher= Light Rail Transit Association}}</ref>{{sfn|Ogden|Senior|1992|p=147}} It also became the first modern tram network in the United Kingdom; the [[Blackpool tramway]] being the UK's only traditional tramway which endured up to the Metrolink's creation.<ref name="Manchester Metrolink, United Kingdom">{{cite web |url= http://www.railway-technology.com/projects/manchester|title=Manchester Metrolink, United Kingdom|publisher= railway-technology.com}}</ref> The network was expanded beyond Victoria to [[Deansgate-Castlefield Metrolink station|G-Mex Metrolink station]] on 27 April 1992; with the line opened through to [[Altrincham Interchange|Altrincham]] on 15 June 1992,{{sfn|Holt|1992|p=90}} completing Phase 1 and enabling use of all 26 [[T-68]] tramss acquired for the operation.<ref name=evo/>{{sfn|GMPTE|2003|p=9}} On 17 July 1992 [[Elizabeth II|Queen Elizabeth II]] officially opened Metrolink at a ceremony.{{sfn|Holt|1992|p=90}}{{sfn|GMPTE|2003|p=9}}<ref name=oldest>{{cite news |url= http://www.bbc.co.uk/news/uk-england-manchester-18867824 |date=17 July 2012 |title= Manchester's oldest Metrolink trams to be replaced |accessdate=20 January 2013 |work= BBC News }}</ref> After the ceremony the Queen visited [[Manchester Town Hall]] and rode from [[St Peter's Square Metrolink station|St Peter's Square]] to [[Bury Interchange|Bury]] to visit Bury Town Hall.{{sfn|Holt|1992|p=90}}{{sfn|GMPTE|2003|p=9}}
Initially projected to open in September 1991, then promised for 21 February 1992,{{sfn|Holt|1992|p=87}} Metrolink began operation on 6 April 1992 with a service between Victoria and Bury.{{sfn|Ogden|Senior|1992|p=82}}{{sfn|Holt|1992|p=90}} Along with the [[Tyne and Wear Metro]] and [[Docklands Light Railway]], it helped to reintroduce light rail to the United Kingdom.<ref name="The History of Tramways and Evolution of Light Rail">{{cite web |url= http://www.lrta.org/mrthistory.html |title=The History of Tramways and Evolution of Light Rail|publisher= Light Rail Transit Association}}</ref>{{sfn|Ogden|Senior|1992|p=147}} The network was expanded beyond Victoria to [[Deansgate-Castlefield Metrolink station|G-Mex Metrolink station]] on 27 April 1992; a service through to Altrincham joined the network on 15 June 1992,{{sfn|Holt|1992|p=90}} completing Phase 1 and enabling use of all 26 [[T-68]] vehicles acquired for the operation.<ref name=evo/>{{sfn|GMPTE|2003|p=9}} [[Elizabeth II]] declared Metrolink open at a ceremony in Manchester on 17 July 1992, adding that Metrolink would improve communication between northern and southern Greater Manchester.{{sfn|GMPTE|2003|p=9}}{{sfn|Holt|1992|p=90}}<ref name=oldest>{{cite news |url= http://www.bbc.co.uk/news/uk-england-manchester-18867824 |date=17 July 2012 |title= Manchester's oldest Metrolink trams to be replaced |accessdate=20 January 2013 |work= BBC News }}</ref> After the ceremony the Queen visited [[Manchester Town Hall]] and rode from [[St Peter's Square Metrolink station|St Peter's Square]] to Bury to visit Bury Town Hall.{{sfn|GMPTE|2003|p=9}}{{sfn|Holt|1992|p=90}}


Then costing £145 million (£{{formatnum:{{Inflation|UK|145000000|1992|r=-5}}|0}} as of {{CURRENTYEAR}}{{Inflation-fn|UK}}){{sfn|GMPTE|2000}} Phase 1 was expected to carry 10 million passengers per year,{{sfn|Ogden|Senior|1992|p=13}} but surpassed this figure by the 1993/94 [[fiscal year]], and every year thereafter.<ref name=stats>{{cite web |url= https://www.gov.uk/government/publications/light-rail-and-tram-statistics-2013-to-2014|at=Light rail and tram statistics 2013/14 and XLS tables (Table LRT0101) |accessdate=18 June 2014 |date=18 June 2014 |title=Light rail and tram statistics: 2013/14 |publisher= Department for Transport}}</ref> In recognition of passenger demands and the decommissioning of the Arndale bus station after the [[1996 Manchester bombing]], adjustments were made to Phase 1 to the design of [[Manchester City Council]]'s city centre masterplan, by modifying [[Market Street Metrolink station]] to handle two-way traffic, demolishing [[High Street Metrolink station]] in 1998 and creating a new stop for [[Shudehill Interchange]] in 2002.{{sfn|Williams|2003|pp=276–277}}{{sfn|Williams|2003|p=290}} Sections of track in the city centre were relaid following damage to the road surface adjacent to the line.<ref>{{cite journal| title=Design, build, operate and maintain contract as applied to Manchester's Metrolink| last=Hall|first= J.R.| journal=Proceedings of the Institution of Civil Engineers: Transport| volume= 111| issue= 4| pages= 310–313|date=November 1995| issn=0965092X| publisher=Thomas Telford| doi=10.1680/itran.1995.28033}}</ref> By 2003, Phase 1 was deemed a "long-term success" by GMPTE, and, with overcrowding at peak times, carried more than 15 million passengers per year.{{sfn|GMPTE|2003|p=13}}<ref name=catchup/>
Then costing £145 million (£{{formatnum:{{Inflation|UK|145000000|1992|r=-5}}|0}} as of {{CURRENTYEAR}}{{Inflation-fn|UK}}){{sfn|GMPTE|2000}} Phase 1 was expected to carry 10 million passengers per year,{{sfn|Ogden|Senior|1992|p=13}} but surpassed this figure by the 1993/94 [[fiscal year]], and every year thereafter.<ref name=stats>{{cite web |url= https://www.gov.uk/government/publications/light-rail-and-tram-statistics-2011-12 |at=Light rail and tram statistics 2011/12 and XLS tables (Table LRT0101) |accessdate=18 January 2013 |date=19 July 2012 |title=Light rail and tram statistics: 2011/12 |publisher= Department for Transport}}</ref> In recognition of passenger demands and the decommissioning of the Arndale bus station after the [[1996 Manchester bombing]], adjustments were made to Phase 1 to the design of [[Manchester City Council]]'s city centre masterplan, by modifying [[Market Street Metrolink station]] to handle two-way traffic, demolishing [[High Street Metrolink station]] in 1998 and creating a new stop for [[Shudehill Interchange]] in 2002.{{sfn|Williams|2003|pp=276–277}}{{sfn|Williams|2003|p=290}} Sections of track in the city centre were relaid following damage to the road surface adjacent to the line.<ref>{{cite journal| title=Design, build, operate and maintain contract as applied to Manchester's Metrolink| last=Hall|first= J.R.| journal=Proceedings of the Institution of Civil Engineers: Transport| volume= 111| issue= 4| pages= 310–313|date=November 1995| issn=0965092X| publisher=Thomas Telford| doi=10.1680/itran.1995.28033}}</ref> By 2003, Phase 1 was deemed a "long-term success" by GMPTE, and, with overcrowding at peak times, carried more than 15 million passengers per year.{{sfn|GMPTE|2003|p=13}}<ref name=catchup/>


===Phase 2===
===Phase 2===
[[File:Cornbrook Metrolink station (17).JPG|thumb|left|[[Cornbrook Metrolink station]], with a [[T-68]]A vehicle specially acquired for the new Eccles Line, opened in 1999 as part of Phase 2]]
[[File:Cornbrook Metrolink station (17).JPG|thumb|left|[[Cornbrook Metrolink station]], with a [[T-68]]A vehicle specially acquired for the new Eccles Line, opened in 1999 as part of Phase 2]]
Extension of the Metrolink network was intended to be continuous with successive expansion phases delivered in strict order of priority.{{sfn|Ogden|Senior|1991|p=63}}{{sfn|Ogden|Senior|1992|p=91}} GMPTE wanted to repeat its success with Phase 1 by converting other parts of Greater Manchester's under-utilised suburban rail network.{{sfn|Williams|2003|p=275}} However, changes in circumstances and new opportunities, combined with a shift in government policy following the [[early 1990s recession]] stalled the immediate expansion of Metrolink after Phase 1.{{sfn|Ogden|Senior|1992|p=91}}{{sfn|Docherty|Shaw|2011|}} Phase 1a, a proposed east – west route from Eastlands to [[Dumplington]] via [[Salford Quays]] was muted by uncertainty surrounding the [[Manchester bid for the 2000 Summer Olympics]], the (unbuilt) [[Trafford Centre]], and regeneration of [[Manchester Docks]] respectively.{{sfn|Ogden|Senior|1991|p=63}}{{sfn|Ogden|Senior|1992|p=148}} Nevertheless, throughout the 1990s, the Greater Manchester Passenger Transport Authority continued to acquire rights to construct Metrolink lines under the [[Transport and Works Act 1992]].{{sfn|GMPTE|2000}}
Extension of the Metrolink network was intended to be continuous with successive expansion phases delivered in strict order of priority.{{sfn|Ogden|Senior|1991|p=63}}{{sfn|Ogden|Senior|1992|p=91}} GMPTE wanted to repeat its "success" with Phase 1 by converting other parts of Greater Manchester's under-utilised suburban rail network.{{sfn|Williams|2003|p=275}} However, changes in circumstances and new opportunities, combined with a shift in government policy following the [[early 1990s recession]] stalled the immediate expansion of Metrolink after Phase 1.{{sfn|Ogden|Senior|1992|p=91}}{{sfn|Docherty|Shaw|2011|}} Phase 1a, a proposed east – west route from Eastlands to [[Dumplington]] via [[Salford Quays]] was muted by uncertainty surrounding the [[Manchester bid for the 2000 Summer Olympics]], the (unbuilt) [[Trafford Centre]], and regeneration of [[Manchester Docks]] respectively.{{sfn|Ogden|Senior|1991|p=63}}{{sfn|Ogden|Senior|1992|p=148}} Nevertheless, throughout the 1990s, the Greater Manchester Passenger Transport Authority continued to acquire rights to construct Metrolink lines under the [[Transport and Works Act 1992]].{{sfn|GMPTE|2000}}


During the 1990s, Salford Quays became a business district specifically redeveloped for commerce, leisure, culture and tourism with a high density of business units and modern housing, complemented by a cinema complex, office blocks, and waterfront promenade.<ref name="Milestones">{{cite web |url= http://www.salford.gov.uk/milestones_v2.pdf
During the 1990s, Salford Quays became a business district specifically redeveloped for commerce, leisure, culture and tourism with a high density of business units and modern housing, complemented by a cinema complex, office blocks, and waterfront promenade.<ref name="Milestones">{{cite web |url= http://www.salford.gov.uk/milestones_v2.pdf
|title= Salford Quays Milestones: The Story of Salford Quays |publisher= Salford City Council |accessdate=3 January 2013 |year=2008}}</ref> As it had poor public transport integration and no rail provision, it was earmarked for a potential Metrolink line as early as 1986 and legal authority to construct the line through the Quays was acquired in 1990.{{sfn|GMPTE|2000}}{{sfn|GMPTE|2003|p=10}} The Quays received millions of pounds of investment and a public consultation and [[public inquiry]] resulted in government endorsement in 1994. In autumn 1995 a {{convert|4|mi|km|adj=on}} Metrolink line branching from [[Cornbrook Metrolink station]] to [[Eccles, Greater Manchester|Eccles]] via Salford Quays capitalising on the regenerated Quayside was confirmed as Phase 2 of Metrolink.{{sfn|GMPTE|2000}}<ref name=evo/>{{sfn|GMPTE|2003|p=10}} No funding came from central government and money was raised from the Greater Manchester Passenger Transport Authority (GMPTA), the [[European Regional Development Fund]] and private developers.{{sfn|GMPTE|2000}}{{sfn|GMPTE|2003|p=10}} In April 1997 Altram, a consortium of [[Serco Group]], [[Gio. Ansaldo & C.|Gio Ansaldo & C]] and [[John Laing]] was appointed to construct the Eccles Line; Serco, responsible for the [[Supertram (Sheffield)|Sheffield Supertram]] would operate the whole network under contract; Ansaldo provided six additional [[T-68]]A trams and signalling equipment. Construction work began on 17 July 1997.{{sfn|GMPTE|2000}}{{sfn|GMPTE|2003|p=10}}<ref name=metuk>{{cite web|url=http://www.railway-technology.com/projects/manchester/|publisher=railway-technology.com|accessdate=10 January 2013|title=Manchester Metrolink, United Kingdom}}</ref>
|title= Salford Quays Milestones: The Story of Salford Quays |publisher= Salford City Council |accessdate=3 January 2013 |year=2008}}</ref> As it had poor public transport integration and no rail provision, it was earmarked for a potential Metrolink line as early as 1986 and legal authority to construct the line through the Quays was acquired in 1990.{{sfn|GMPTE|2000}}{{sfn|GMPTE|2003|p=10}} The Quays received millions of pounds of investment and a public consultation and [[public inquiry]] resulted in government endorsement in 1994. In autumn 1995 a {{convert|4|mi|km|adj=on}} Metrolink line branching from [[Cornbrook Metrolink station]] to [[Eccles, Greater Manchester|Eccles]] via Salford Quays capitalising on the regenerated Quayside was confirmed as Phase 2 of Metrolink.{{sfn|GMPTE|2000}}<ref name=evo/>{{sfn|GMPTE|2003|p=10}} No funding came from central government and money was raised from the Greater Manchester Passenger Transport Authority (GMPTA), the European Regional Development Fund and private developers.{{sfn|GMPTE|2000}}{{sfn|GMPTE|2003|p=10}} In April 1997 Altram, a consortium of the [[Serco Group plc]], [[Gio. Ansaldo & C.]] and [[John Laing plc]] was appointed to construct the Eccles Line; Serco, responsible for the [[Supertram (Sheffield)|Sheffield Supertram]] would operate the whole network under contract; Ansaldo provided six additional vehicles — [[T-68]]As and signalling equipment. Construction work officially began on 17 July 1997.{{sfn|GMPTE|2000}}{{sfn|GMPTE|2003|p=10}}<ref name=metuk>{{cite web|url=http://www.railway-technology.com/projects/manchester/|publisher=railway-technology.com|accessdate=10 January 2013|title=Manchester Metrolink, United Kingdom}}</ref>


The Eccles Line was opened as far as [[Broadway Metrolink station]] on 6 December 1999 by the Prime Minister, [[Tony Blair]],{{sfn|GMPTE|2003|p=13}}<ref name=fury>{{cite news |url= http://www.guardian.co.uk/uk/2004/aug/02/transport.politics |title= Tram fury rattles ministers |first=David |last=Ward |date=2 August 2004 |accessdate=5 January 2013 |work=The Guardian |location= London}}</ref> the line opened to [[Eccles Interchange]] on 21 July 2000,<ref name=evo/>{{sfn|GMPTE|2000}} and was officially declared open by [[Anne, Princess Royal]] at a ceremony on 9 January 2001.<ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/42018_whistlestop_princess_takes_home_hat_souvenir_ |work=Manchester Evening News |date=9 January 2001 |accessdate=8 January 2013 |title= Whistle-stop Princess takes home hat souvenir}}</ref> On completion, Phases 1 and 2 gave Metrolink a total route length of {{convert|24|mi|km}}.<ref>{{cite news |url= http://www.railwaygazette.com/news/single-view/view/more-money-for-uk-light-rail.html |title=More money for UK light rail |work=Railway Gazette International |location =London |date=1 January 2003 |accessdate=13 January 2013}}</ref> Phase 2 was predominantly privately funded and cost £160,000,000 (£{{formatnum:{{Inflation|UK|160000000|2000|r=-4}}|0}} as of {{CURRENTYEAR}}).{{Inflation-fn|UK}}{{sfn|GMPTE|2000}} Salford City Council considered Phase 2 "an important contribution to Salford's public transport network, providing a fast and frequent service between Eccles, Salford Quays and Manchester city centre".<ref name=saldel>{{cite web |url= http://www.salford.gov.uk/d/salford-idp-light-rail.pdf |publisher= Salford City Council |title=Salford Infrastructure Delivery Plan |date=February 2012 |accessdate=22 January 2013}}</ref> But, in competition with comparatively quicker and cheaper buses, the line navigated the Quays on a slow and meandering route, and failed to reach its initial passenger targets.{{sfn|Docherty|Shaw|2011|}} Patronage increased during the 2000s as the Eccles Line steadily increased in popularity in keeping with a rise in passenger numbers across the whole Metrolink system and was beginning to become overcrowded by the end of the decade.<ref name=saldel/>
The Eccles Line was officially opened as far as [[Broadway Metrolink station]] on 6 December 1999 by the Prime Minister, [[Tony Blair]], who praised Metrolink as "exactly the type of scheme needed to solve the transport problems of the metropolitan areas of the country";<ref name=fury>{{cite news |url= http://www.guardian.co.uk/uk/2004/aug/02/transport.politics |title= Tram fury rattles ministers |first=David |last=Ward |date=2 August 2004 |accessdate=5 January 2013 |work=The Guardian |location= London}}</ref>{{sfn|GMPTE|2003|p=13}} a service to [[Eccles Interchange]] joined the network on 21 July 2000,<ref name=evo/>{{sfn|GMPTE|2000}} and was officially declared open by [[Anne, Princess Royal]] at a ceremony on 9 January 2001.<ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/42018_whistlestop_princess_takes_home_hat_souvenir_ |work=Manchester Evening News |date=9 January 2001 |accessdate=8 January 2013 |title= Whistle-stop Princess takes home hat souvenir}}</ref> On completion, Phases 1 and 2 gave Metrolink a total route length of {{convert|24|mi|km}}.<ref>{{cite news |url= http://www.railwaygazette.com/news/single-view/view/more-money-for-uk-light-rail.html |title=More money for UK light rail |work=Railway Gazette International |location =London |date=1 January 2003 |accessdate=13 January 2013}}</ref> Phase 2 was predominantly privately funded and cost £160,000,000 (£{{formatnum:{{Inflation|UK|160000000|2000|r=-4}}|0}} as of {{CURRENTYEAR}}).{{Inflation-fn|UK}}{{sfn|GMPTE|2000}} Salford City Council considered Phase 2 "an important contribution to Salford's public transport network, providing a fast and frequent service between Eccles, Salford Quays and Manchester city centre".<ref name=saldel/> But, in competition with comparatively quicker and cheaper buses, the line navigated the Quays on a slow and meandering route, and failed to reach its initial passenger targets.{{sfn|Docherty|Shaw|2011|}} Patronage increased during the 2000s as the Eccles Line steadily increased in popularity in keeping with a rise in passenger numbers across the whole Metrolink system and was beginning to become overcrowded by the end of the decade.<ref name=saldel/>


===Phase 3===
===Phase 3===
In 2000, officials and transport planners in Greater Manchester considered Metrolink to be a "phenomenal success".{{sfn|GMPTE|2000}} The system was exceeding patronage targets and reducing [[traffic congestion]] on roads running parallel to its lines.{{sfn|Docherty|Shaw|2011|}} Consequently, when the [[Transport Act 2000]] required [[passenger transport executive]]s to produce [[local transport plan]]s, GMPTE's top public transport priority was a third phase of Metrolink expansion, which would create four new lines along key transport corridors in Greater Manchester: the Oldham and Rochdale Line (routed northeast to [[Oldham]] and [[Rochdale]]), the East Manchester Line (routed east to East Manchester and [[Ashton-under-Lyne]]), the South Manchester Line (routed southeast to [[Chorlton-cum-Hardy]] and [[Didsbury|East Didsbury]]), and the Airport Line (routed south to [[Wythenshawe]] and [[Manchester Airport]]).<ref name=plan2>{{cite web |url= http://www.tfgm.com/Corporate/Documents/GMLTP/LTP2.pdf |title=Greater Manchester Local Transport Plan 2 |date=March 2006 |accessdate=5 January 2013 |publisher= Greater Manchester Passenger Transport Authority}}</ref> The East Manchester Line would capitalise on serving the [[City of Manchester Stadium]], a host venue of the [[2002 Commonwealth Games]].<ref>{{cite press release |author=GMPTE|authorlink=Transport for Greater Manchester |title=Metrolink is coming&nbsp;... |year=2000 |publisher=GMPTE Promotions |location=Manchester |url=http://www.tfgm.com/Corporate/Documents/Metrolink/met.pdf |format=PDF |accessdate=15 January 2013}}</ref><ref name=bang/> Satisfied it would deliver a key policy commitment with faster expansion and greater value from [[economies of scale]],{{sfn|GMPTE|2000}}{{sfn|GMPTE|2003|p=13}} GMPTE and the [[Association of Greater Manchester Authorities]] (AGMA) lobbied central government to provide partial funding to upgrade the current network with a new depot, [[Passenger information system|passenger information displays]], and construct four new lines in a single Phase 3 contract (dubbed the "Big Bang") worth £489 million.<ref name=500tram/><ref name=evo/><ref name=bang/><ref name=planb/><ref name=ann>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/5152948.stm |title= Metrolink extension is announced |date=6 July 2006 |accessdate=7 January 2013 |work=BBC News}}</ref>
In 2000, officials and [[transportation planning|transport planners]] in Greater Manchester considered Metrolink to be a "phenomenal success".{{sfn|GMPTE|2000}} The system was exceeding patronage targets and reducing [[traffic congestion]] on roads running parallel to its lines.{{sfn|Docherty|Shaw|2011|}} Consequently, when the [[Transport Act 2000]] required [[passenger transport executive]]s to produce [[local transport plan]]s, GMPTE's top public transport priority was a third phase of Metrolink expansion, which would create four new lines along key transport corridors in Greater Manchester: the Oldham and Rochdale Line (routed northeast to [[Oldham]] and [[Rochdale]]), the East Manchester Line (routed east to East Manchester and [[Ashton-under-Lyne]]), the South Manchester Line (routed southeast to [[Chorlton-cum-Hardy]] and [[Didsbury|East Didsbury]]), and the Airport Line (routed south to [[Wythenshawe]] and [[Manchester Airport]]).<ref name=plan2>{{cite web |url= http://www.tfgm.com/Corporate/Documents/GMLTP/LTP2.pdf |title=Greater Manchester Local Transport Plan 2 |date=March 2006 |accessdate=5 January 2013 |publisher= Greater Manchester Passenger Transport Authority}}</ref> The East Manchester Line would capitalise on serving the [[City of Manchester Stadium]], a host venue of the [[2002 Commonwealth Games]].<ref>{{cite press release |author=GMPTE|authorlink=Transport for Greater Manchester |title=Metrolink is coming&nbsp;... |year=2000 |publisher=GMPTE Promotions |location=Manchester |url=http://www.tfgm.com/Corporate/Documents/Metrolink/met.pdf |format=PDF |accessdate=15 January 2013}}</ref><ref name=bang/> Satisfied it would deliver a key policy commitment with faster expansion and greater value from [[economies of scale]],{{sfn|GMPTE|2000}}{{sfn|GMPTE|2003|p=13}} GMPTE and the [[Association of Greater Manchester Authorities]] (AGMA) lobbied central government to provide partial funding to upgrade the current network with a new depot, [[Passenger information system|passenger information displays]], and construct four new lines in a single Phase 3 contract (dubbed the "Big Bang") worth £489,000,000 (£{{formatnum:{{Inflation|UK|489000000|2000|r=-5}}|0}} as of {{CURRENTYEAR}}).{{Inflation-fn|UK}}{{sfn|GMPTE|2000}}<ref name=500tram/><ref name=evo/><ref name=bang/><ref name=planb/><ref name=ann>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/5152948.stm |title= Metrolink extension is announced |date=6 July 2006 |accessdate=7 January 2013 |work=BBC News}}</ref>


Conceding that it would be difficult to bring Metrolink to the [[City of Manchester Stadium]] by 2002, the Government accepted its importance to Greater Manchester and the Commonwealth Games on 22 March 2000, with an announcement from Deputy Prime Minister [[John Prescott]] that a £289 million government contribution to fund Phase 3.<ref name=500tram>{{cite news |url= http://news.bbc.co.uk/1/hi/uk/687277.stm |title= £500m tram extension unveiled |work=BBC News |date=22 March 2000 |accessdate=5 January 2013}}</ref><ref name=bang>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/11937_289m_for_metrolink_big_bang |work= Manchester Evening News |accessdate=5 January 2013 |date=22 March 2000 |title=£289m for Metrolink 'Big Bang'}}</ref><ref name=bring/> The remaining £200 million was provided by the private sector by July 2000.{{sfn|GMPTE|2000|}}<ref name=bang/> Following the announcement, preparatory work such as legal costs, land acquisition and construction of rail bridges over the [[River Medlock]] was actioned.<ref name=ann/><ref name=bring>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/182/182478_bring_on_the_metro_urges_bridge_boss.html |title=Bring on the Metro, urges bridge boss |first=Clarissa |last=Satchell |date=17 November 2005 |accessdate=19 January 2013 |work=Manchester Evening News}}</ref> However, Metrolink made a loss in 2002 and failed to reduce traffic congestion in Manchester city centre.<ref name=fail>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/98/98124_trams_fail_to_cut_jams.html |title= Trams fail to cut jams |work=Manchester Evening News |date=23 April 2004 |accessdate=19 January 2013}}</ref> Costs for Phase 3 implementation were revised in the December after the 2002 Commonwealth Games, totalling £820 million meaning Metrolink required a Government contribution of at least £520 million.<ref name=fury/> With costs predicted to rise further, and concerns raised over light rail procurement nationally,{{sfn|TfGM|GMCA|2011|p=80}} on 20 July 2004, [[Secretary of State for Transport]] [[Alistair Darling]] announced the Government had withdrawn its share of funding Metrolink due to excessive costs.<ref name=fury/><ref name=ann/><ref>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/3910235.stm |title=Government scraps trams extension |date=20 July 2004 |work=BBC News |accessdate=19 January 2013}}</ref>
Conceding that it would be "very difficult" to bring Metrolink to the City of Manchester Stadium by 2002, the Government accepted its importance to Greater Manchester and the Commonwealth Games on 22 March 2000, with an announcement from Deputy Prime Minister [[John Prescott]] that a £289,000,000 government contribution to fund Phase 3 would make Metrolink "the envy of Europe".<ref name=500tram>{{cite news |url= http://news.bbc.co.uk/1/hi/uk/687277.stm |title= £500m tram extension unveiled |work=BBC News |date=22 March 2000 |accessdate=5 January 2013}}</ref><ref name=bang>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/11937_289m_for_metrolink_big_bang |work= Manchester Evening News |accessdate=5 January 2013 |date=22 March 2000 |title=£289m for Metrolink 'Big Bang'}}</ref><ref name=bring/> The remaining £200,000,000 was assembled from the private sector by July 2000.{{sfn|GMPTE|2000|}}<ref name=bang/> Following the announcement, preparatory work such as legal costs, land acquisition and construction of rail bridges over the [[River Medlock]] was actioned.<ref name=ann/><ref name=bring>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/182/182478_bring_on_the_metro_urges_bridge_boss.html |title=Bring on the Metro, urges bridge boss |first=Clarissa |last=Satchell |date=17 November 2005 |accessdate=19 January 2013 |work=Manchester Evening News}}</ref> However, Metrolink made a loss in 2002 and failed to reduce traffic congestion in Manchester city centre.<ref name=fail>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/98/98124_trams_fail_to_cut_jams.html |title= Trams fail to cut jams |work=Manchester Evening News |date=23 April 2004 |accessdate=19 January 2013}}</ref> Costs for Phase 3 implementation were revised in the December after the 2002 Commonwealth Games, totalling £820,000,000 (£{{formatnum:{{Inflation|UK|820000000|2002|r=-5}}|0}} as of {{CURRENTYEAR}}),{{Inflation-fn|UK}} meaning Metrolink required a Government contribution of at least £520,000,000.<ref name=fury/> With costs predicted to rise further, and concerns raised over light rail procurement nationally,{{sfn|TfGM|GMCA|2011|p=80}} on 20 July 2004, [[Alistair Darling]] (the [[Secretary of State for Transport]]) announced the Government had withdrawn its share of funding Metrolink due to excessive costs.<ref name=fury/><ref name=ann/><ref>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/3910235.stm |title=Government scraps trams extension |date=20 July 2004 |work=BBC News |accessdate=19 January 2013}}</ref>


In response, highlighting the legal costs and demolition of homes, schools and offices in anticipation of the new lines,<ref name=ann/><ref name=bring/> the ''Get Our Metrolink Back on Track'' (or ''Back on Track'' )<ref name=planb/> campaign spearheaded by the ''[[Manchester Evening News]]'' and [[Member of Parliament|Members of Parliament]] from Greater Manchester was organised to lobby the [[Department for Transport]] to fund Phase 3.<ref name=ann/>{{sfn|TfGM|GMCA|2011|p=80}}<ref name=moving/><ref name=oldhamsuccess>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/1588852_oldham-metrolink-line-a-huge-success-with-250000-passengers-in-first-three-months |work=Manchester Evening News |accessdate=8 January 2013 |date=15 September 2012 |title=Oldham Metrolink line a huge success with 250,000 passengers in first three months}}</ref> On 16 December 2004 Alistair Darling announced that the government would fund Phase 3 – but not at any price, capping its investment for Metrolink enhancements at £520 million.<ref name=ann/>{{sfn|TfGM|GMCA|2011|p=80}} An initial £102 million funding package was granted by the Government in July 2005 for Phase 3 preparatory work, and a [[Carillion]]-led track renewal programme for {{convert|12|mi|km|}} of Phase 1 line – still using original British Rail track – that was causing damage to vehicles and discomfort for passengers.<ref name=catchup/> Following negotiations between central government and GMPTE and AGMA, Phase 3 funding was confirmed by [[Douglas Alexander]] on 6 July 2006,<ref name=ann/> albeit with adjustments (such as axing the Wythenshawe Loop)<ref>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/4120216.stm |title=Metrolink 'to axe hospital route' |work=BBC News |date=22 June 2005 |accessdate=19 January 2013}}</ref> and splitting the project into two stages: Phase 3a, elements of expansion funded by government investment; and Phase 3b, elements requiring an alternative funding source.<ref name=planb>{{cite news |url= http://www.bbc.co.uk/manchester/content/articles/2009/05/13/130509_metrolink_map_plan_b_feature.shtml |title=Metrolink: back on track? |date=13 May 2009 |accessdate=19 January 2013 |work=BBC News}}</ref>{{sfn|TfGM|GMCA|2011|p=80}} The MPact-Thales consortium, composed of [[Laing O'Rourke]], [[VolkerRail]] and the [[Thales Group]], was appointed to design, build and maintain the {{convert|20|mi|km|}} of new line plus a new depot at [[Old Trafford, Greater Manchester|Old Trafford]].<ref name=evo/>{{sfn|TfGM|GMCA|2011|p=80}} A {{convert|0.25|mi|km|adj=on}} spur off the Eccles Line to the new [[MediaCityUK]] development at Salford Quays, funded separately by the [[Northwest Regional Development Agency]] (NWRDA), would also fall to Mpact-Thales.<ref name=evo/>{{sfn|TfGM|GMCA|2011|p=80}}<ref name=metuk/>
In response, highlighting the legal costs and demolition of homes, schools and offices in anticipation of the new lines,<ref name=ann/><ref name=bring/> the ''Get Our Metrolink Back on Track'' (or ''Back on Track'' )<ref name=planb/> campaign spearheaded by the ''[[Manchester Evening News]]'' and [[Member of Parliament|Members of Parliament]] from Greater Manchester was organised to lobby the [[Department for Transport]] to fund Phase 3.<ref name=moving/>{{sfn|TfGM|GMCA|2011|p=80}}<ref name=ann/><ref name=oldhamsuccess>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/1588852_oldham-metrolink-line-a-huge-success-with-250000-passengers-in-first-three-months |work=Manchester Evening News |accessdate=8 January 2013 |date=15 September 2012 |title=Oldham Metrolink line a huge success with 250,000 passengers in first three months}}</ref> On 16 December 2004 Alistair Darling announced that the government would fund Phase 3 – but not at any price, capping its investment for Metrolink enhancements at £520,000,000.{{sfn|TfGM|GMCA|2011|p=80}}<ref name=ann/> An initial £102,000,000 funding package was granted by the Government in July 2005 for Phase 3 preparatory work, and a [[Carillion]]-led track renewal programme for {{convert|12|mi|km|}} of Phase 1 line – still using original British Rail track – that was causing damage to vehicles and discomfort for passengers.<ref name=catchup/> Following negotiations between central government and GMPTE and AGMA, Phase 3 funding was confirmed by [[Douglas Alexander]] on 6 July 2006,<ref name=ann/> albeit with adjustments (such as axing the Wythenshawe Loop)<ref>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/4120216.stm |title=Metrolink 'to axe hospital route' |work=BBC News |date=22 June 2005 |accessdate=19 January 2013}}</ref> and splitting the project into two stages: Phase 3a, elements of expansion funded by government investment; and Phase 3b, elements requiring an alternative funding source.<ref name=planb>{{cite news |url= http://www.bbc.co.uk/manchester/content/articles/2009/05/13/130509_metrolink_map_plan_b_feature.shtml |title=Metrolink: back on track? |date=13 May 2009 |accessdate=19 January 2013 |work=BBC News}}</ref>{{sfn|TfGM|GMCA|2011|p=80}} The MPact-Thales consortium, composed of [[Laing O'Rourke]], [[VolkerRail]] and the [[Thales Group]], was appointed to design, build and maintain the {{convert|20|mi|km|}} of new line plus a new depot at [[Old Trafford, Greater Manchester|Old Trafford]].<ref name=evo/>{{sfn|TfGM|GMCA|2011|p=80}} A {{convert|0.25|mi|km|adj=on}} spur off the Eccles Line to the new [[MediaCityUK]] development at Salford Quays, funded separately by the [[Northwest Regional Development Agency]] (NWRDA), would also fall to Mpact-Thales.<ref name=evo/>{{sfn|TfGM|GMCA|2011|p=80}}<ref name=metuk/>


====Phase 3a====
====Phase 3a====
Line 91: Line 87:


====Phase 3b====
====Phase 3b====
[[File:Ashton-Under-Lyne Metrolink Stop.JPG|thumb|left|[[Ashton-under-Lyne Metrolink station]] in May 2013]]
[[File:Rochdale Railway Station Metrolink stop (14).JPG|thumb|left|[[Rochdale Town Centre Metrolink station]] in March 2014]]
{{see also|Greater Manchester Transport Innovation Fund}}
{{see also|Greater Manchester Transport Innovation Fund}}
Phase 3b was revealed in July 2006 when Phase 3 was split into two smaller phases.{{sfn|Young|2008|p=163}} A range of motivators pushed transport planners to pursue Phase 3b, including attracting new passengers, value to the economy, reduction of road traffic congestion, regeneration, and improved access to town centres, business districts and labour markets.{{sfn|TfGM|GMCA|2011|p=45}} Under Phase 3b plans, Metrolink proposed to extend the East Manchester Line by {{convert|2.4|mi|km}} from Droylsden to [[Ashton-under-Lyne]];<ref name=ashdids>{{cite news |url= http://www.railwaygazette.com/news/single-view/view/ashton-and-didsbury-metrolink-extensions-funded.html |title= Ashton and Didsbury Metrolink extensions funded |work=Railway Gazette International |location =London |date=8 March 2010 |accessdate=20 January 2013}}</ref> extend the South Manchester Line by {{convert|2.7|mi|km}} from St Werburgh's Road to [[Didsbury]];<ref name=EastDids>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/metrolink-passengers-told-can-tram-3710695 |title=Metrolink extension to East Didsbury to open next week- three months early |date=14 May 2013 |accessdate=14 May 2013 |first=Dean |last=Kirby |work=Manchester Evening News}}</ref> and create a new {{convert|9|mi|km|adj=on}} Airport Line to [[Manchester Airport]] from a junction at St Werburgh's Road.<ref name=start3b>{{cite news |date=22 March 2011 |url= http://www.railwaygazette.com/news/single-view/view/manchester-metrolink-starts-phase-3b.html |title= Manchester Metrolink starts Phase 3b |work=Railway Gazette International |location= London |accessdate=20 January 2013}}</ref> Phase 3b enacted plans first drawn up in 1983, laid before Parliament in 1988, and approved by the government in 1991 to re-route and extend the Oldham and Rochdale Line at a cost of £124,500,000 with a street running route through Oldham and Rochdale town centres, both of which were poorly served by using the outlying Oldham Mumps and [[Rochdale railway station]]s alone.{{sfn|Young|2008|p=163}}{{sfn|Holt|1992|pp=92–93}}<ref name=reach/><ref name=3bcon/><ref>{{cite web |url= http://www.tfgm.com/Corporate/Documents/Metrolink/met_roch.pdf |publisher=Greater Manchester Passenger Transport Authority |title=Bringing Metrolink to Oldham and Rochdale |year=2000 |accessdate=15 January 2013}}</ref>
Phase 3b was revealed in July 2006 when Phase 3 was split into two smaller phases.{{sfn|Young|2008|p=163}} A range of motivators pushed transport planners to pursue Phase 3b, including attracting new passengers, value to the economy, reduction of road traffic congestion, regeneration, and improved access to town centres, business districts and labour markets.{{sfn|TfGM|GMCA|2011|p=45}} Under Phase 3b plans, Metrolink proposed to extend the East Manchester Line by {{convert|2.4|mi|km}} from Droylsden to [[Ashton-under-Lyne]];<ref name=ashdids>{{cite news |url= http://www.railwaygazette.com/news/single-view/view/ashton-and-didsbury-metrolink-extensions-funded.html |title= Ashton and Didsbury Metrolink extensions funded |work=Railway Gazette International |location =London |date=8 March 2010 |accessdate=20 January 2013}}</ref> extend the South Manchester Line by {{convert|2.7|mi|km}} from St Werburgh's Road to [[Didsbury]];<ref name=EastDids>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/metrolink-passengers-told-can-tram-3710695 |title=Metrolink extension to East Didsbury to open next week- three months early |date=14 May 2013 |accessdate=14 May 2013 |first=Dean |last=Kirby |work=Manchester Evening News}}</ref> and create a new {{convert|9|mi|km|adj=on}} Airport Line to [[Manchester Airport]] from a junction at St Werburgh's Road.<ref name=start3b>{{cite news |date=22 March 2011 |url= http://www.railwaygazette.com/news/single-view/view/manchester-metrolink-starts-phase-3b.html |title= Manchester Metrolink starts Phase 3b |work=Railway Gazette International |location= London |accessdate=20 January 2013}}</ref> Phase 3b enacted plans first drawn up in 1983, laid before Parliament in 1988, and approved by the government in 1991 to re-route and extend the Oldham and Rochdale Line at a cost of £124,500,000 with a street running route through Oldham and Rochdale town centres, both of which were poorly served by using the outlying Oldham Mumps and [[Rochdale railway station]]s alone.{{sfn|Young|2008|p=163}}{{sfn|Holt|1992|pp=92–93}}<ref name=reach/><ref name=3bcon/><ref>{{cite web |url= http://www.tfgm.com/Corporate/Documents/Metrolink/met_roch.pdf |publisher=Greater Manchester Passenger Transport Authority |title=Bringing Metrolink to Oldham and Rochdale |year=2000 |accessdate=15 January 2013}}</ref>


Tasked with procuring funds for Phase 3b from sources other than central Government, in July 2007 GMPTE and AGMA submitted a bid to the [[Transport Innovation Fund]], which would release a multi-million pound sum for public transport improvements linked to viable anti-road traffic congestion strategies.{{sfn|Young|2008|p=160}}<ref>{{cite web |url= http://www.tfgm.com/Corporate/Documents/Metrolink/Metrolink_Newsletter_260608.pdf |title=The Link |publisher= Transport for Greater Manchester |year=2008 |accessdate=15 January 2013}}</ref> A referendum on the [[Greater Manchester Transport Innovation Fund]] was held in Greater Manchester on 19 December 2008,<ref>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/7588142.stm |work=BBC News |title=Date set for C-charge referendum |date=29 September 2008 |accessdate=5 January 2010}}</ref> in which 79% of voters rejected plans for public transport improvements linked to a peak-time weekday-only [[Greater Manchester congestion charge]].<ref>{{cite news |url= http://www.guardian.co.uk/politics/2008/dec/12/congestioncharging-transport |title=Manchester says no to congestion charging |last=Sturcke |first=James |date=12 December 2008 |work=The Guardian |location=London |accessdate=12 December 2008}}</ref> In May 2009, Greater Manchester Integrated Transport Authority (formerly GMPTA) and AGMA agreed to create the Greater Manchester Transport Fund, £1.5billion raised from a combination of a levy on [[council tax]] in Greater Manchester, government grants, contributions from the [[Manchester Airports Group]], Metrolink fares and third-party funding for "major transport schemes" in the region.{{sfn|TfGM|2012|p=14}}<ref name=3bcon>{{cite news |url= http://www.railwaygazette.com/news/urban-rail/single-view/view/manchester-metrolink-phase-3b-confirmed.html |date=5 August 2010 |accessdate=19 January 2013 |title=Manchester Metrolink Phase 3b confirmed |work=Railway Gazette International |location= London}}</ref> Phase 3b was approved with funding on a line-by-line basis between March and August 2010.<ref name=ashdids/><ref name=3bcon/> Construction work for all Phase 3b lines began in March 2011.<ref>{{cite news |url= http://www.railwaygazette.com/news/urban-rail/single-view/view/manchester-metrolink-starts-phase-3b.html |title=Manchester Metrolink starts Phase 3b |date=22 March 2011 |accessdate=19 January 2013 |work=Railway Gazette International |location= London}}</ref> On the Airport Line, a 580-tonne steel bridge was erected in [[Wythenshawe]] over the [[M56 motorway]] on 25 November 2012.<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/local-news/giant-construction-project-to-position-580-tonne-697695 |work=Manchester Evening News |date=25 November 2012 |accessdate=16 February 2013 |title= Giant construction project to position 580-tonne bridge over M56 completed eight hours early |first=Paul |last=Britton}}</ref> Following the closure of [[Mosley Street Metrolink station]] on 17 May 2013,<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/manchester-city-centre-tram-stop-3658102 |date=12 May 2013 |accessdate=17 May 2013 |work=Manchester Evening News |title= Manchester city centre tram stop reaches the end of the line |first=Dean |last=Kirby}}</ref> the {{convert|2.7|mi|km|adj=on}} route of the South Manchester Line from St Werburgh's Road to [[East Didsbury Metrolink station]] was the first section of Phase 3b line to open on 23 May 2013 - three months ahead of schedule.<ref name=EastDids/><ref name=dest>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/destination-didsbury-metrolink-trams-start-4001522 |title=Destination Didsbury – Metrolink trams to start tomorrow, three months early |first=Dean |last=Kirby |date=22 May 2013 |accessdate=22 May 2013 |work=Manchester Evening News}}</ref> The East Manchester Line was completed on 9 October 2013 with a new service routed {{convert|2.1|mi|km}} between Droylsden and [[Ashton-under-Lyne Metrolink station]], taking the total system length to {{convert|47.7|mi|km}}.<ref name="AshtonOpen">{{cite press release |url= http://www.tfgm.com/Corporate/media_centre/Pages/News.aspx?articleId=330|publisher=Transport for Greater Manchester |title=New Metrolink service to Ashton opens |date=9 October 2013 |accessdate=9 October 2013}}</ref><ref>{{cite news|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/metrolink-tram-service-launches-ashton-under-lyne-6161044|title=Metrolink tram service launches from Ashton-under-Lyne... and it's on time|first=Emily|last=Kent-Smith|date=9 October 2013|accessdate=9 October 2013|work=Manchester Evening News}}</ref><ref name=newash>{{cite news|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/metrolink-tram-service-ashton-under-lyne-start-6107476|work=Manchester Evening News|date=28 September 2013|first=Paul|last=Britton|title=Metrolink service to Ashton-under-Lyne to start on October 9|accessdate=9 October 2013}}</ref> The Oldham and Rochdale Line was completed with a street-running service through Oldham Town Centre on 27 January 2014,<ref name=OTC>{{cite web|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/oldham-metrolink-line-things-see-6603983|work=Manchester Evening News|date=27 January 2014|accessdate=31 March 2014|title=Landmarks on the new Oldham Metrolink line, and a driver's eye view tour of the route|first=Emma|last=Flanagan}}</ref> and the addition of a street-running service between Rochdale railway station and [[Rochdale Town Centre Metrolink station|Rochdale Town Centre]] on 31 March 2014, taking the total system length to {{convert|48.5|mi|km}}.<ref name=RTC>{{cite web|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/rochdales-first-passenger-tram-80-6897266 |work=Manchester Evening News|date=31 March 2014|accessdate=31 March 2014|title=Passenger trams start running to and from Rochdale town centre for first time in 80 years|first=John|last=Scheerhout}}</ref>
Tasked with procuring funds for Phase 3b from sources other than central Government, in July 2007 GMPTE and AGMA submitted a bid to the [[Transport Innovation Fund]], which would release a multi-million pound sum for public transport improvements linked to viable anti-road traffic congestion strategies.{{sfn|Young|2008|p=160}}<ref>{{cite web |url= http://www.tfgm.com/Corporate/Documents/Metrolink/Metrolink_Newsletter_260608.pdf |title=The Link |publisher= Transport for Greater Manchester |year=2008 |accessdate=15 January 2013}}</ref> A referendum on the [[Greater Manchester Transport Innovation Fund]] was held in Greater Manchester on 19 December 2008,<ref>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/7588142.stm |work=BBC News |title=Date set for C-charge referendum |date=29 September 2008 |accessdate=5 January 2010}}</ref> in which 79% of voters rejected plans for public transport improvements linked to a peak-time weekday-only [[Greater Manchester congestion charge]].<ref>{{cite news |url= http://www.guardian.co.uk/politics/2008/dec/12/congestioncharging-transport |title=Manchester says no to congestion charging |last=Sturcke |first=James |date=12 December 2008 |work=The Guardian |location=London |accessdate=12 December 2008}}</ref> In May 2009, Greater Manchester Integrated Transport Authority (formerly GMPTA) and AGMA agreed to create the Greater Manchester Transport Fund, £1.5billion raised from a combination of a levy on [[council tax]] in Greater Manchester, government grants, contributions from the [[Manchester Airports Group]], Metrolink fares and third-party funding for "major transport schemes" in the region.{{sfn|TfGM|2012|p=14}}<ref name=3bcon>{{cite news |url= http://www.railwaygazette.com/news/urban-rail/single-view/view/manchester-metrolink-phase-3b-confirmed.html |date=5 August 2010 |accessdate=19 January 2013 |title=Manchester Metrolink Phase 3b confirmed |work=Railway Gazette International |location= London}}</ref> Phase 3b was approved with funding on a line-by-line basis between March and August 2010.<ref name=ashdids/><ref name=3bcon/> Construction work for all Phase 3b lines began in March 2011.<ref>{{cite news |url= http://www.railwaygazette.com/news/urban-rail/single-view/view/manchester-metrolink-starts-phase-3b.html |title=Manchester Metrolink starts Phase 3b |date=22 March 2011 |accessdate=19 January 2013 |work=Railway Gazette International |location= London}}</ref> On the Airport Line, a 580-tonne steel bridge was erected in [[Wythenshawe]] over the [[M56 motorway]] on 25 November 2012.<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/local-news/giant-construction-project-to-position-580-tonne-697695 |work=Manchester Evening News |date=25 November 2012 |accessdate=16 February 2013 |title= Giant construction project to position 580-tonne bridge over M56 completed eight hours early |first=Paul |last=Britton}}</ref> Following the closure of [[Mosley Street Metrolink station]] on 17 May 2013,<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/manchester-city-centre-tram-stop-3658102 |date=12 May 2013 |accessdate=17 May 2013 |work=Manchester Evening News |title= Manchester city centre tram stop reaches the end of the line |first=Dean |last=Kirby}}</ref> the {{convert|2.7|mi|km|adj=on}} route of the South Manchester Line from St Werburgh's Road to [[East Didsbury Metrolink station]] was the first section of Phase 3b line to open on 23 May 2013 - three months ahead of schedule.<ref name=EastDids/><ref name=dest>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/destination-didsbury-metrolink-trams-start-4001522 |title=Destination Didsbury – Metrolink trams to start tomorrow, three months early |first=Dean |last=Kirby |date=22 May 2013 |accessdate=22 May 2013 |work=Manchester Evening News}}</ref> The East Manchester Line was completed on 9 October 2013 with a new service routed {{convert|2.1|mi|km}} between Droylsden and [[Ashton-under-Lyne Metrolink station]], taking the total system length to {{convert|47.7|mi|km}}.<ref name="AshtonOpen">{{cite press release |url= http://www.tfgm.com/Corporate/media_centre/Pages/News.aspx?articleId=330|publisher=Transport for Greater Manchester |title=New Metrolink service to Ashton opens |date=9 October 2013 |accessdate=9 October 2013}}</ref><ref>{{cite news|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/metrolink-tram-service-launches-ashton-under-lyne-6161044|title=Metrolink tram service launches from Ashton-under-Lyne... and it's on time|first=Emily|last=Kent-Smith|date=9 October 2013|accessdate=9 October 2013|work=Manchester Evening News}}</ref><ref name=newash>{{cite news|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/metrolink-tram-service-ashton-under-lyne-start-6107476|work=Manchester Evening News|date=28 September 2013|first=Paul|last=Britton|title=Metrolink service to Ashton-under-Lyne to start on October 9|accessdate=9 October 2013}}</ref> The Oldham and Rochdale Line was completed with a street-running service through Oldham Town Centre on 27 January 2014,<ref name=OTC>{{cite web|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/oldham-metrolink-line-things-see-6603983|work=Manchester Evening News|date=27 January 2014|accessdate=31 March 2014|title=Landmarks on the new Oldham Metrolink line, and a driver's eye view tour of the route|first=Emma|last=Flanagan}}</ref> and the addition of a street-running service between Rochdale railway station and [[Rochdale Town Centre Metrolink station|Rochdale Town Centre]] on 31 March 2014, taking the total system length to {{convert|48.5|mi|km}}.<ref name=RTC/> TfGM forecasts that more than 45 million passenger journeys per year will be made on the {{convert|59|mi|km|adj=on}} Metrolink system once Phase 3b is completed in 2016.<ref name=catchup/><ref name=NextRochdale/>
The last line of Phase 3b running from St Werburgh's Road to Manchester Airport is due to open in 2014.<ref>{{cite web|title=Trams to Manchester Airport to arrive more than A YEAR early|url=http://www.tfgm.com/Corporate/media_centre/Pages/News.aspx?articleId=468|publisher=Transport for Greater Manchester|accessdate=20 June 2014}}</ref> Testing started on this line on 22/06/2014. TfGM forecasts that more than 45 million passenger journeys per year will be made on the {{convert|59|mi|km|adj=on}} Metrolink system once Phase 3b is completed.<ref name=catchup/><ref name=NextRochdale/>

[[File:3894073 2abfed86.jpg|thumbnail|right|Starting Excavation on the site of [[Exchange Square Metrolink station]] in January 2014.]]


===Phase 2CC===
===Phase 2CC===
The Second City Crossing (also known as 2CC)<ref name=2cc>{{cite news |url= http://www.bbc.co.uk/news/uk-england-manchester-13684701 |work= BBC News |title=Metrolink second city crossing 'vital' for Manchester |date=8 June 2011 |accessdate=7 January 2013}}</ref> is a second Metrolink route across Manchester city centre, first proposed in 2011 as a means to improve capacity, flexibility and reliability as the rest of the system expands due to phases 3a and 3b.<ref name=saldel/><ref name=2cc/>{{sfn|TfGM|GMCA|2011|p=84}}<ref name=metuk/><ref name=mini>{{cite news|url=http://www.placenorthwest.co.uk/news/archive/14501-ministers-clear-way-for-second-city-centre-metrolink-line.html|work=Place North West|date=7 October 2013|accessdate=7 October 2013|title=Ministers clear way for second city centre Metrolink line}}</ref> Funded by the Greater Manchester Transport Fund, its {{convert|0.8|mi|km|adj=on}} route will begin at a rebuilt [[St Peter's Square Metrolink station]], and run along Princess Street, Cross Street and Corporation Street to rejoin the existing Metrolink line by Victoria station.{{sfn|TfGM|GMCA|2011|p=84}}<ref name=vital/> Following the submission of a planning document under the [[Transport and Works Act 1992]], and a [[public inquiry]] held throughout 2013,<ref name=vital>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/a-second-metrolink-crossing-through-manchester-1236393 |work=Manchester Evening News |date=23 January 2013 |accessdate=23 January 2013 |title=New city line is 'vital for future of Metrolink' |first=Yakub |last=Qureshi}}</ref><ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/1598672_cross-city-metrolink-idea-on-the-line-as-tram-inquiry-launched |work=Manchester Evening News |first=Dean |last=Kirby |date=22 January 2013 |accessdate=23 January 2013 |title=Cross-city Metrolink idea on the line as tram inquiry launched}}</ref> the Second City Crossing was granted approval on 8 October 2013 by the [[Secretary of State for Transport]], [[Patrick McLoughlin]],<ref name=mini/><ref name=bbc2ccgranted>{{cite news |url=http://www.bbc.co.uk/news/uk-england-manchester-24438347 |work=[[BBC News]] |date=8 October 2013 |accessdate=8 October 2013 |title=Manchester city centre tram route's green light by Government}}</ref> and signed off on 28 October 2013 by the Greater Manchester Combined Authority.<ref name=sec>{{cite news| url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/second-cross-city-metrolink-tram-link-6247586| title=Second cross-city tram link gets green light |work=Manchester Evening News| date = 28 October 2013| accessdate= 28 October 2013|first = Jennifer| last=Williams|}}</ref> Construction commenced in 2014, with [[Exchange Square Metrolink station]] joining the network as a new stop on the crossing; a |[[Shaw and Crompton Metrolink station|Shaw and Crompton]] to Exchange Square service is to join the network in 2015 with completion of the scheme expected in 2016/17.<ref name=2cc/><ref name=bbc2ccgranted/><ref name=sec/>
The Second City Crossing (also known as 2CC)<ref name=2cc>{{cite news |url= http://www.bbc.co.uk/news/uk-england-manchester-13684701 |work= BBC News |title=Metrolink second city crossing 'vital' for Manchester |date=8 June 2011 |accessdate=7 January 2013}}</ref> is a second Metrolink route across Manchester city centre, first proposed in 2011 as a means to improve capacity, flexibility and reliability as the rest of the system expands due to phases 3a and 3b.<ref name=saldel/><ref name=2cc/>{{sfn|TfGM|GMCA|2011|p=84}}<ref name=metuk/><ref name=mini>{{cite news|url=http://www.placenorthwest.co.uk/news/archive/14501-ministers-clear-way-for-second-city-centre-metrolink-line.html|work=Place North West|date=7 October 2013|accessdate=7 October 2013|title=Ministers clear way for second city centre Metrolink line}}</ref> Funded by the Greater Manchester Transport Fund, its {{convert|0.8|mi|km|adj=on}} route will begin at a rebuilt [[St Peter's Square Metrolink station]], and run along Princess Street, Cross Street and Corporation Street to rejoin the existing Metrolink line by Victoria station.{{sfn|TfGM|GMCA|2011|p=84}}<ref name=vital/> Following the submission of a planning document under the [[Transport and Works Act 1992]], and a [[public inquiry]] held throughout 2013,<ref name=vital>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/a-second-metrolink-crossing-through-manchester-1236393 |work=Manchester Evening News |date=23 January 2013 |accessdate=23 January 2013 |title=New city line is 'vital for future of Metrolink' |first=Yakub |last=Qureshi}}</ref><ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/1598672_cross-city-metrolink-idea-on-the-line-as-tram-inquiry-launched |work=Manchester Evening News |first=Dean |last=Kirby |date=22 January 2013 |accessdate=23 January 2013 |title=Cross-city Metrolink idea on the line as tram inquiry launched}}</ref> the Second City Crossing was granted approval on 8 October 2013 by the [[Secretary of State for Transport]], [[Patrick McLoughlin]],<ref name=mini/><ref name=bbc2ccgranted>{{cite news |url=http://www.bbc.co.uk/news/uk-england-manchester-24438347 |work=[[BBC News]] |date=8 October 2013 |accessdate=8 October 2013 |title=Manchester city centre tram route's green light by Government}}</ref> and signed off on 28 October 2013 by the Greater Manchester Combined Authority.<ref name=sec>{{cite news| url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/second-cross-city-metrolink-tram-link-6247586| title=Second cross-city tram link gets green light |work=Manchester Evening News| date = 28 October 2013| accessdate= 28 October 2013|first = Jennifer| last=Williams|}}</ref> Construction is to commence in 2014, with [[Exchange Square Metrolink station]] joining the network as a new stop on the crossing; a Shaw and Crompton-to-Exchange Square service is to join the network in 2015 with completion of the scheme expected in 2016/17.<ref name=2cc/><ref name=bbc2ccgranted/><ref name=sec/>

===Tram-Trains===
In late 2013, Transport for Greater Manchester revealed it had drawn up plans which could see specially designed vehicles running on both street tracks and train tracks between [[Glossop railway station|Glossop]] and Manchester city centre. This would require the conversion of the [[Glossop Line]], resurrecting plans first developed in 1982. A two-year trial of tram-trains, which are popular in parts of continental Europe, is due to begin on the [[Sheffield]] [[Supertram (Sheffield)|Supertram]] in 2016,<ref>[http://www.therailengineer.com/2013/08/15/next-stop-rotherham-sheffields-new-tram-trains/ Next stop Rotherham: Sheffield's new Tram Trains] ''The Rail Engineer'' 15 August 2013</ref> after which the government will decide if it is possible to create tram-train networks in other British cities.<ref>[http://www.manchestereveningnews.co.uk/news/greater-manchester-news/tram-trains-could-link-glossop-up-6312282 'Tram-trains' could link Glossop up with Metrolink] ''Manchester Evening News'' 17 November 2013</ref> Other plans include Manchester to [[Northwich]] via [[Altrincham Metrolink station|Altrincham]], and Manchester to [[Marple, Greater Manchester|Marple]].


==Operator==
==Operator==
{{see also|Transport for Greater Manchester|RATP Group}}
{{see also|Transport for Greater Manchester|RATP Group}}
[[File:Media city metrolink station2.jpg|thumb|Metrolink stops are marked with yellow totems, such as this one at [[MediaCityUK]]]]
[[File:Media city metrolink station2.jpg|thumb|Metrolink stops are marked with yellow totems, such as this one at [[MediaCityUK]]]]
Metrolink is run as a [[public-private partnership]] between TfGM and private transport firms.{{sfn|GMPTE|2000}} Between 1992 and 2007 Metrolink was operated and maintained as a concession by [[Serco Group|Serco]].<ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/transport/public_transport/s/1454330_stagecoach-hand-over-control-of-metrolink-system-to-french-firm-ratp |title=Stagecoach hand over control of Metrolink system to French firm RATP |work=Manchester Evening News |date=2 August 2011 |last=Kirby |first=Dean}}</ref> In July 2007 [[Stagecoach Group|Stagecoach]] commenced a ten year contract to run the system.<ref>{{cite press release |url= http://www.stagecoachgroup.com/media/news-releases/2007/2007-05-29.aspx |title=Stagecoach signs Manchester Metrolink contract |date=29 May 2007 |publisher=[[Stagecoach Group]] |accessdate=28 December 2008}}</ref><ref>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/6899507.stm |title=Stagecoach take over tram service |date=15 July 2007 |accessdate=1 November 2008 |work=BBC News}}</ref> On 1 August 2011 [[RATP Group]] bought the balance of the Metrolink contract from Stagecoach.<ref name=saldel/><ref name=firm/><ref name=rgi20110802>{{cite news |url= http://www.railwaygazette.com/nc/news/single-view/view/ratp-buys-manchester-metrolink-operator.html |title=RATP buys Manchester Metrolink operator |date=2 August 2011 |work=[[Railway Gazette International]] |location =London}}</ref>
Metrolink is run as a [[public-private partnership]] between TfGM and private transport firms.{{sfn|GMPTE|2000}} Between 1992 and 2007 Metrolink was operated and maintained as a concession by [[Serco]].<ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/transport/public_transport/s/1454330_stagecoach-hand-over-control-of-metrolink-system-to-french-firm-ratp |title=Stagecoach hand over control of Metrolink system to French firm RATP |work=Manchester Evening News |date=2 August 2011 |last=Kirby |first=Dean}}</ref> From 2007 until 2011 it was operated and maintained by Stagecoach Metrolink&nbsp;– part of the [[Stagecoach Group]].<ref name="stagecoach">{{cite press release |url= http://www.stagecoachgroup.com/media/news-releases/2007/2007-05-29.aspx |title=Stagecoach signs Manchester Metrolink contract |date=29 May 2007 |publisher=[[Stagecoach Group]] |accessdate=28 December 2008}}</ref><ref>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/6899507.stm |title=Stagecoach take over tram service |date=15 July 2007 |accessdate=1 November 2008 |work=BBC News}}</ref> Metrolink RATP Dev, a part of the French state-owned [[RATP Group]] which operates the [[Paris Métro]], bought the Metrolink contract from Stagecoach on 1 August 2011.<ref name=saldel/><ref name=rgi20110802 /><ref name=firm/>


Metrolink is headed by Peter Cushing, the Metrolink Director at TfGM.<ref name=cush>{{cite news |work=Salford Online |url= http://www.salfordonline.com/businessnews_page/40837-peter_cushing_to_take_over_as_metrolink_boss.html |title=Peter Cushing to take over as Metrolink boss |date=29 January 2013 |accessdate=29 January 2013}}</ref> Appointed by TfGM and the [[Greater Manchester Combined Authority]], Cushing began his post on 4 February 2013, having previously been the Operations Director of [[Central Trains]].<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/new-metrolink-boss-arrives-on-schedule-1274998 |work=Manchester Evening News |title=New Metrolink boss arrives on schedule |first=Dean |last=Kirby |date=30 January 2013 |accessdate=1 February 2013}}</ref> Cushing replaced Philip Purdy, who joined Metrolink in May 2008, having previously overseen the expansion of the [[Trams in Melbourne|Melbourne tramway network]] with [[Yarra Trams]].<ref name=expert>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/7398695.stm |title=Tram expert's global job switch |work=BBC News |date=13 May 2008 |accessdate=20 January 2013}}</ref>{{sfn|GMPTE|2009|p=3}}
Metrolink is headed by Peter Cushing, the Metrolink Director at TfGM.<ref name=cush>{{cite news |work=Salford Online |url= http://www.salfordonline.com/businessnews_page/40837-peter_cushing_to_take_over_as_metrolink_boss.html |title=Peter Cushing to take over as Metrolink boss |date=29 January 2013 |accessdate=29 January 2013}}</ref> Appointed by TfGM and the [[Greater Manchester Combined Authority]], Cushing began his post on 4 February 2013, having previously been the Operations Director of [[Central Trains]].<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/new-metrolink-boss-arrives-on-schedule-1274998 |work=Manchester Evening News |title=New Metrolink boss arrives on schedule |first=Dean |last=Kirby |date=30 January 2013 |accessdate=1 February 2013}}</ref> Cushing replaced Philip Purdy, who joined Metrolink in May 2008, having previously overseen the expansion of the [[Trams in Melbourne|Melbourne tramway network]] with [[Yarra Trams]].<ref name=expert>{{cite news |url= http://news.bbc.co.uk/1/hi/england/manchester/7398695.stm |title=Tram expert's global job switch |work=BBC News |date=13 May 2008 |accessdate=20 January 2013}}</ref>{{sfn|GMPTE|2009|p=3}}
Line 117: Line 105:
The name Metrolink and a system-wide [[aquamarine (color)|aquamarine]], black and grey corporate branding and vehicle [[livery]] was devised by [[WPP plc|Fitch RS]] and [[Design Triangle]],{{sfn|Ogden|Senior|1991|p=42}}{{sfn|Ogden|Senior|1992|p=143}} and first revealed at a press launch in June 1988.{{sfn|Holt|1992|pp=26–27}}{{sfn|GMPTE|2003|p=4}} Previously, during the planning and promotional stages, the system was known as Project Light Rail, and borrowed an orange and brown identity used by Greater Manchester Transport and [[GM Buses]].{{sfn|Holt|1992|p=24}}{{sfn|Holt|1992|p=30}} In August 1991, in partnership with [[BBC Manchester]], Metrolink ran a "Nickname Metrolink" competition to find an affectionate short name for the system, comparable to "The Tube" for [[London Underground]] and "The L" for the [[Chicago 'L'|Chicago elevated transit system]]. Most submissions were inspired by [[textile manufacturing]], Greater Manchester's historic staple industry, using names such as "The Thread" and "The Shuttle", but the winning entry was "The Met".{{sfn|Holt|1992|p=30}} In 2008, a distinctive yellow and metallic silver vehicle livery, and corresponding yellow system-wide corporate re-branding was introduced by Manchester-based Hemisphere Design and Marketing Consultancy, designed in partnership with [[Peter Saville (graphic designer)|Peter Saville]], [[Dalton Maag]] and Design Triangle.<ref name=evo/><ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/business/s/1072244_tram_design_on_the_right_track |title=Tram design on the right track |work= Manchester Evening News |date=14 October 2008 |accessdate=19 January 2013 |first=Simon |last=Donohue}}</ref> Yellow was chosen by Hemisphere for its high visibility and to reflect Greater Manchester's culture of confidence and optimism.{{sfn|GMPTE|2009|p=3}}
The name Metrolink and a system-wide [[aquamarine (color)|aquamarine]], black and grey corporate branding and vehicle [[livery]] was devised by [[WPP plc|Fitch RS]] and [[Design Triangle]],{{sfn|Ogden|Senior|1991|p=42}}{{sfn|Ogden|Senior|1992|p=143}} and first revealed at a press launch in June 1988.{{sfn|Holt|1992|pp=26–27}}{{sfn|GMPTE|2003|p=4}} Previously, during the planning and promotional stages, the system was known as Project Light Rail, and borrowed an orange and brown identity used by Greater Manchester Transport and [[GM Buses]].{{sfn|Holt|1992|p=24}}{{sfn|Holt|1992|p=30}} In August 1991, in partnership with [[BBC Manchester]], Metrolink ran a "Nickname Metrolink" competition to find an affectionate short name for the system, comparable to "The Tube" for [[London Underground]] and "The L" for the [[Chicago 'L'|Chicago elevated transit system]]. Most submissions were inspired by [[textile manufacturing]], Greater Manchester's historic staple industry, using names such as "The Thread" and "The Shuttle", but the winning entry was "The Met".{{sfn|Holt|1992|p=30}} In 2008, a distinctive yellow and metallic silver vehicle livery, and corresponding yellow system-wide corporate re-branding was introduced by Manchester-based Hemisphere Design and Marketing Consultancy, designed in partnership with [[Peter Saville (graphic designer)|Peter Saville]], [[Dalton Maag]] and Design Triangle.<ref name=evo/><ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/business/s/1072244_tram_design_on_the_right_track |title=Tram design on the right track |work= Manchester Evening News |date=14 October 2008 |accessdate=19 January 2013 |first=Simon |last=Donohue}}</ref> Yellow was chosen by Hemisphere for its high visibility and to reflect Greater Manchester's culture of confidence and optimism.{{sfn|GMPTE|2009|p=3}}


Metrolink has been a "Football Development Partner" with the [[Manchester Football Association]] since August 2010,<ref>{{cite web |url= http://www.manchesterfa.com/partners-pages/partners/metrolink |title=Metrolink |publisher= [[Manchester Football Association]] |accessdate=19 January 2013}}</ref> meaning it is the association's Official Travel Partner, and supports grassroots [[List of football clubs in Greater Manchester|association football in Greater Manchester]] by selecting a "Team of the Month".<ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/sport/football/s/1590313_team-of-the-month-swinton-fc |title= Team of the month: Swinton FC |work=Manchester Evening News |date=3 October 2012 |accessdate=19 January 2013}}</ref> Metrolink is a sponsor of the annual Manchester Food and Drink Festival.<ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/transport/s/1327221_metrolink_offers_travel_pass_for_food_and_drink_festival |title=Metrolink offers travel pass for Food and Drink Festival |work=Manchester Evening News |date=17 September 2010 |accessdate=19 January 2013 |first=Pete |last=Bainbridge}}</ref> On 6 December 2010, to celebrate the soap opera's 50th anniversary, ''[[Coronation Street]]'' featured a storyline with an explosion which caused a crash on the Metrolink system at [[Weatherfield]].<ref>{{cite news |url=http://www.bbc.co.uk/news/entertainment-arts-11935407 |title=Coronation Street tram crash pulls in 13m viewers |date=7 December 2010 |work=BBC News |accessdate=23 January 2013}}</ref> Although a fictitious event, at least six calls were made to GMPTE asking if services had been affected.<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/are-the-trams-still-running-confused-viewers-904643 |work=Manchester Evening News |date=8 December 2010 |accessdate=23 January 2013 |title=Are the trams still running?: 'Confused' viewers called Metrolink to check service after Coronation Street crash |first=Dean |last=Kirby}}</ref>
Metrolink has been a "Football Development Partner" with the [[Manchester Football Association]] since August 2010,<ref>{{cite web |url= http://www.manchesterfa.com/partners-pages/partners/metrolink |title=Metrolink |publisher= [[Manchester Football Association]] |accessdate=19 January 2013}}</ref> meaning it is the association's Official Travel Partner, and supports grassroots [[List of football clubs in Greater Manchester|association football in Greater Manchester]] by selecting a "Team of the Month".<ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/sport/football/s/1590313_team-of-the-month-swinton-fc |title= Team of the month: Swinton FC |work=Manchester Evening News |date=3 October 2012 |accessdate=19 January 2013}}</ref> Metrolink is a sponsor of the annual [[Manchester Food and Drink Festival]].<ref>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/transport/s/1327221_metrolink_offers_travel_pass_for_food_and_drink_festival |title=Metrolink offers travel pass for Food and Drink Festival |work=Manchester Evening News |date=17 September 2010 |accessdate=19 January 2013 |first=Pete |last=Bainbridge}}</ref> On 6 December 2010, to celebrate the soap opera's 50th anniversary, ''[[Coronation Street]]'' featured a storyline with an explosion which caused a crash on the Metrolink system at [[Weatherfield]].<ref>{{cite news |url=http://www.bbc.co.uk/news/entertainment-arts-11935407 |title=Coronation Street tram crash pulls in 13m viewers |date=7 December 2010 |work=BBC News |accessdate=23 January 2013}}</ref> Although a fictitious event, at least six calls were made to GMPTE asking if services had been affected.<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/are-the-trams-still-running-confused-viewers-904643 |work=Manchester Evening News |date=8 December 2010 |accessdate=23 January 2013 |title=Are the trams still running?: 'Confused' viewers called Metrolink to check service after Coronation Street crash |first=Dean |last=Kirby}}</ref>


Transport planners in Greater Manchester describe Metrolink as both "an icon of Greater Manchester",{{sfn|TfGM|2012|p=23}} and "an integral part of the landscape in Greater Manchester".<ref name=moving>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/129/129526_moving_plea_to_save_metrolink.html |title=Moving plea to save Metrolink |work=Manchester Evening News |first=Clarissa |last=Satchell |date=6 September 2004 |accessdate=19 January 2013}}</ref> ''[[The Guardian]]'' describes Metrolink as "Manchester's efficient and much-loved tram system".<ref name=fury/> Under ownership of the [[Guardian Media Group]], the ''[[Manchester Evening News]]'' spearheaded the ''Get Our Metrolink Back on Track'' campaign in 2004–05.<ref name=oldhamsuccess/> Under [[Trinity Mirror]] ownership, the ''Manchester Evening News'' used the [[Freedom of Information Act 2000]] to reveal that Metrolink received over 10,000 complaints between May 2011 and May 2012.<ref name=complaints>{{cite news |date=16 October 2012 |url= http://menmedia.co.uk/manchestereveningnews/news/s/1591222_10000-complaints-about-metrolink-in-one-year |title=10,000 complaints about Metrolink in one year |work=Manchester Evening News |accessdate=19 January 2013}}</ref>
Transport planners in Greater Manchester describe Metrolink as both "an icon of Greater Manchester",{{sfn|TfGM|2012|p=23}} and "an integral part of the landscape in Greater Manchester".<ref name=moving>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/129/129526_moving_plea_to_save_metrolink.html |title=Moving plea to save Metrolink |work=Manchester Evening News |first=Clarissa |last=Satchell |date=6 September 2004 |accessdate=19 January 2013}}</ref> ''[[The Guardian]]'' describes Metrolink as "Manchester's efficient and much-loved tram system".<ref name=fury/> Under ownership of the [[Guardian Media Group]], the ''[[Manchester Evening News]]'' spearheaded the ''Get Our Metrolink Back on Track'' campaign in 2004–05.<ref name=oldhamsuccess/> Under [[Trinity Mirror]] ownership, the ''Manchester Evening News'' used the [[Freedom of Information Act 2000]] to reveal that Metrolink received over 10,000 complaints between May 2011 and May 2012.<ref name=complaints>{{cite news |date=16 October 2012 |url= http://menmedia.co.uk/manchestereveningnews/news/s/1591222_10000-complaints-about-metrolink-in-one-year |title=10,000 complaints about Metrolink in one year |work=Manchester Evening News |accessdate=19 January 2013}}</ref>
Line 138: Line 126:
| 15 June 1992{{sfn|Holt|1992|p=90}}
| 15 June 1992{{sfn|Holt|1992|p=90}}
| 10<ref name=servicemap/>
| 10<ref name=servicemap/>
| {{convert|7.6|mi|km|abbr=on}}{{sfn|Ogden|Senior|1992|p=73}}
| {{convert|7.6|mi|km}}{{sfn|Ogden|Senior|1992|p=73}}
|-
|-
| style="text-align:left;"|Bury Line
| style="text-align:left;"|Bury Line
| 6 April 1992{{sfn|Holt|1992|p=90}}
| 6 April 1992{{sfn|Holt|1992|p=90}}
| 10<ref name=servicemap/>
| 10<ref name=servicemap/>
| {{convert|9.9|mi|km|abbr=on}}{{sfn|Ogden|Senior|1992|p=73}}
| {{convert|9.9|mi|km|}}{{sfn|Ogden|Senior|1992|p=73}}
|-
|-
| style="text-align:left;"|City Zone
| style="text-align:left;"|City Zone
| 27 April 1992{{sfn|Holt|1992|p=90}}
| 27 April 1992{{sfn|Holt|1992|p=90}}
| 8<ref name=servicemap/>
| 8<ref name=servicemap/>
| {{convert|1.5|mi|km|abbr=on}}{{sfn|Ogden|Senior|1992|p=73}}
| {{convert|1.5|mi|km|}}{{sfn|Ogden|Senior|1992|p=73}}
|-
|-
| style="text-align:left;"|East Manchester Line
| style="text-align:left;"|East Manchester Line
| 11 February 2013{{#tag:ref|The East Manchester Line opened to the general public on 11 February 2013.<ref name=prev/> It opened to invited residents of [[Tameside]] and [[Manchester]] along the route of the track on 8 February 2013 with free travel as a "gesture of thanks" for patience shown during disruptive construction works.<ref name=count/>|group=note}}
| 11 February 2013{{#tag:ref|The East Manchester Line opened to the general public on 11 February 2013.<ref name=prev/> It opened to invited residents of [[Tameside]] and [[Manchester]] along the route of the track on 8 February 2013 with free travel as a "gesture of thanks" for patience shown during disruptive construction works.<ref name=count/>|group=note}}
| 11<ref name=servicemap/>
| 11<ref name=servicemap/>
| {{convert|6|mi|km|abbr=on}}<ref name=count/><ref name=newash/><ref name=prev>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/droylsden-east-manchester-metrolink-line-1295847 |work=Manchester Evening News |first=Dean |last=Kirby |title=Video: Sneak preview of Metrolink's brand new East Manchester Line to Droylsden |date=6 February 2013 |accessdate=6 February 2013}}</ref>
| {{convert|6|mi|km}}<ref name=count/><ref name=newash/><ref name=prev>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/droylsden-east-manchester-metrolink-line-1295847 |work=Manchester Evening News |first=Dean |last=Kirby |title=Video: Sneak preview of Metrolink's brand new East Manchester Line to Droylsden |date=6 February 2013 |accessdate=6 February 2013}}</ref>
|-
|-
| style="text-align:left;"|Eccles Line
| style="text-align:left;"|Eccles Line
| 6 December 1999{{sfn|GMPTE|2003|p=13}}
| 6 December 1999{{sfn|GMPTE|2003|p=13}}
| 11<ref name=servicemap/>
| 11<ref name=servicemap/>
| {{convert|4|mi|km|abbr=on}}{{sfn|GMPTE|2003|p=15}}
| {{convert|4|mi|km}}{{sfn|GMPTE|2003|p=15}}
|-
|-
| style="text-align:left;"|Oldham and Rochdale Line
| style="text-align:left;"|Oldham and Rochdale Line
| 13 June 2012<ref name=reach/>
| 13 June 2012<ref name=reach/>
| 19<ref name=servicemap/>
| 19<ref name=servicemap/>
| {{convert|14.8|mi|km|abbr=on}}{{sfn|GMPTE|2010|p=7}}<ref name=RTC/>
| {{convert|14.8|mi|km}}{{sfn|GMPTE|2010|p=7}}<ref name=RTC/>
|-
|-
| style="text-align:left;"|South Manchester Line
| style="text-align:left;"|South Manchester Line
| 7 July 2011<ref name=smanc/><ref name=first3a/>
| 7 July 2011<ref name=smanc/><ref name=first3a/>
| 8<ref name=servicemap/>
| 8<ref name=servicemap/>
| {{convert|4.4|mi|km|abbr=on}}{{sfn|TfGM|2012|p=23}}<ref name=EastDids/>
| {{convert|4.4|mi|km}}{{sfn|TfGM|2012|p=23}}<ref name=EastDids/>
|-
| colspan="2" style="text-align:center;"|'''TOTAL:'''
| '''77'''
| '''{{convert|48.5|mi|km|abbr=on}}'''<ref name=RTC/>
|}
|}


===Rolling stock===
===Rolling stock===
{{main|T-68|M5000}}
{{main|T-68|M5000}}
[[File:T68 and M5000.JPG|thumb|[[St Peter's Square Metrolink station]], with a [[T-68]] and [[M5000]] in May 2013]]
[[File:T68 and M5000.JPG|thumb|[[St Peter's Square Metrolink station]], with both a modern M5000 vehicle (pictured right) and an older T-68 (pictured left)]]
For passenger services, Metrolink uses a fleet of specially designed articulated vehicles exclusively composed of [[M5000|Bombardier Flexity Swift M5000s]], first introduced in 2009.<ref name=up/> These were preceded by [[T-68|Ansaldo Firema T-68/T-68A]]s,{{sfn|Holt|1992|p=42}}{{sfn|Ogden|Senior|1992|p=111}} which were retired in February 2014 and April 2014 respectively.<ref name=end>{{cite web|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/metrolink-trams-end-line-manchester-7056688|work=Manchester Evening News|title=End of the line for Metrolink's first tram fleet|first=Dean|last=Kirby|date=30 April 2014|accessdate=1 May 2014}}</ref> These vehicles were originally termed LRVs (light rail vehicles),{{sfn|Holt|1992|p=30}} but are now widely known as [[tram]]s.<ref name="futuremetrolink"/> Both varieties are bi-directional, designed to be driven by a single driver from either end in a cab separate from passengers.{{sfn|Ogden|Senior|1992|p=111}}{{sfn|Ogden|Senior|1992|p=104}}
For the commencement of operations in 1992, a fleet of 26 [[T-68]] trams (1001-1026) were purchased from [[AnsaldoBreda]] of [[Milan]]. Each T-68 was also to have a nickname referencing the personalities, history and culture of Greater Manchester as chosen by the public. The names chosen in 1987 were [[Sylvia Pankhurst]], [[Matt Busby|Sir Matt Busby]], [[Benjamin Brierley|Ben Brierley]], [[Lancashire Fusiliers|The Lancashire Fusilier]], [[John Barbirolli|Sir John Barbirolli]], Pat Seed, [[John Greenwood (bus operator)|John Greenwood]], Squire Clark, [[Gracie Fields|Our Gracie]], and [[C. P. Scott]]. Despite assurances they would all be applied, few were ever used,{{sfn|Holt|1992|pp=26–27}} with a sponsorship naming scheme (to provide additional income for Metrolink) taking preference (for example, vehicle 1002 was named the "Manchester Arndale Voyager" to promote [[Manchester Arndale]] and its Voyager food court).{{sfn|Holt|1992|p=48}}


The T-68s were Metrolink's original passenger fleet. They were in passenger service from the opening of Metrolink in 1992, and were phased out between April 2012 and February 2014.{{sfn|Coward|Henderson|2014|p=184}} They were {{convert|29|m|ft|}} in length by {{convert|2.65|m|ft}} wide, weigh {{convert|48|LT|ST|0}} and have a top speed of {{convert|50|mph|kph}}.{{sfn|Ogden|Senior|1991|p=40}}{{sfn|Ogden|Senior|1991|p=45}}{{sfn|Ogden|Senior|1992|pp=114–115}} The nominal capacity of each T-68 was 201 passengers, of whom 86 are seated; the maximum [[crush load]] capacity is 270 passengers.{{sfn|Ogden|Senior|1991|p=41}} Each unit was given a number from 1001 through to 1026;{{sfn|Holt|1992|p=42}}{{sfn|Ogden|Senior|1992|pp=114–115}} number 1000 was given to a half length mockup displayed to the public before opening, and now exhibited at the [[Museum of Transport, Greater Manchester|Greater Manchester Museum of Transport]].{{sfn|Holt|1992|p=42}} Each T-68 was also to have a nickname referencing the personalities, history and culture of Greater Manchester as chosen by the public. The names chosen in 1987 were [[Sylvia Pankhurst]], [[Matt Busby|Sir Matt Busby]], [[Benjamin Brierley|Ben Brierley]], [[Lancashire Fusiliers|The Lancashire Fusilier]], [[John Barbirolli|Sir John Barbirolli]], [[Pat Seed]], [[John Greenwood (bus operator)|John Greenwood]], [[Squire Clark]], [[Gracie Fields|Our Gracie]], and [[C. P. Scott]]. Despite assurances they would all be applied, few were ever used,{{sfn|Holt|1992|pp=26–27}} with a sponsorship naming scheme (to provide additional income for Metrolink) taking preference (for example, vehicle 1002 was named the "Manchester Arndale Voyager" to promote [[Manchester Arndale]] and its Voyager food court).{{sfn|Holt|1992|p=48}}
In 1999, Metrolink's passenger fleet was bolstered by six modified T68As (2001 - 2006) as part of the construction of the Eccles Line.<ref name=metuk/> Based on the original T-68s, but had modifications replacing destination rollblinds with dot matrix displays, and retractable couplers and covered bogies necessary for the high proportion of on-street running close to motor traffic.<ref name=metuk/> Three of the earlier T-68 fleet were similarly equipped,<ref name=metuk/> and were known as T-68Ms.{{sfn|Coward|Henderson|2014|p=29}} Mechanically and electrically the T-68M vehicles remained essentially a T-68, but had modifications to its brakes, mirrors, and speed limiters to suit the Eccles Line.{{sfn|Coward|Henderson|2014|p=29}} Initially only these vehicles were permitted to operate the Eccles line but the entire fleet was modified between 2008 and 2012 for universal running,<ref name=metuk/> under a program known as the T-68X Universal Running programme.{{sfn|Coward|Henderson|2014|pp=31-32, 59}} The last T-68As were retired on 30 April 2014.{{sfn|Coward|Henderson|2014|p=184}}<ref name=end>{{cite web|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/metrolink-trams-end-line-manchester-7056688|work=Manchester Evening News|title=End of the line for Metrolink's first tram fleet|first=Dean|last=Kirby|date=30 April 2014|accessdate=1 May 2014}}</ref>


In 1999, Metrolink's passenger fleet was bolstered by six new vehicles to run on the Eccles Line.<ref name=metuk/> Numbered 2001 through to 2006, these T-68A vehicles were based on the original T-68s, but had modifications replacing destination rollblinds with dot matrix displays, and retractable couplers and covered bogies necessary for the high proportion of on-street running close to motor traffic.<ref name=metuk/> Three of the earlier T-68 fleet were similarly equipped,<ref name=metuk/> and were known as T-68Ms.{{sfn|Coward|Henderson|2014|p=29}} Mechanically and electrically the T-68M vehicles remained essentially a T-68, but had modifications to its brakes, mirrors, and speed limiters to suit the Eccles Line.{{sfn|Coward|Henderson|2014|p=29}} Initially only these vehicles were permitted to operate the Eccles line but the entire fleet was modified between 2008 and 2012 for universal running,<ref name=metuk/> under a program known as the T-68X Universal Running programme.{{sfn|Coward|Henderson|2014|pp=31-32, 59}} The T-68As were retired on 30 April 2014.<ref name=end/>
To operate service on the expanded network, a fleet of [[M5000|Bombardier Flexity Swift M5000s]] (3001-3104) were first introduced in December 2009.<ref name=metuk/><ref name=up/> Built by [[Bombardier Transportation]] and [[Vossloh Kiepe]], the M5000 vehicles were ordered to allow extra services to be operated.<ref name=catchup>{{cite news |url=http://www.railwaygazette.com/news/urban/single-view/view/manchester-plays-catch-up-with-metrolink-expansion.html |title= Manchester plays catch-up with Metrolink expansion |first=Nick |last=Kingsley |date=19 October 2007 |accessdate=12 January 2013 |work=Railway Gazette International |location= London}}</ref><ref name=metuk/> They are painted in a yellow and silver livery.<ref name=oldest/><ref name=up>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/transport/public_transport/s/1186881_2m_tram_is_up_and_running |date=21 December 2009 |title=£2m tram is up and running |work=Manchester Evening News |accessdate=20 January 2013}}</ref><ref name=yellow>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/1125664_futures_yellow_for_trams |date=13 July 2009 |title=Future's yellow for trams |work=Manchester Evening News |accessdate=20 January 2013}}</ref> Originally eight M5000s were planned, which increased to 12 with the approval of the spur to MediaCityUK.<ref name=metuk/> A total of 94 M5000s were procured by TfGM for the phase 3 extensions and fleet replacement, by May 2014 84 had been delivered.<ref name=oldest/><ref name=axed/> In July 2012, TfGM announced that the Greater Manchester Combined Authority had agreed that all T-68s and T-68As would be replaced by M5000s to give Metrolink a uniform fleet.<ref name=oldest/><ref name=axed>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/transport/public_transport/s/1583611_happy-birthday-metrolink-old-trams-axed-as-network-turns-20 |date=17 July 2012 |title=Happy birthday Metrolink: Old trams axed as network turns 20 |work=Manchester Evening News |accessdate=29 January 2013}}</ref> In October 2013, the authority agreed to procure a further ten M5000s in 2014 to facilitate the construction of the proposed Trafford Park line, while in the interim supporting a service between MediaCityUK and Manchester city centre.<ref name=sec/><ref>{{cite news|url=http://www.marketwired.com/press-release/press-release-bombardier-supply-10-additional-light-rail-vehicles-manchester-metrolink-tsx-bbd.a-1864639.htm|title=Bombardier to Supply 10 Additional Light Rail Vehicles to Manchester Metrolink in the UK|publisher=[[Marketwired]]|date=2013-12-20|location=[[Manchester]]|accessdate=2013-12-23|archivedate=2013-12-23|archiveurl=http://www.webcitation.org/query?url=http%3A%2F%2Fwww.marketwired.com%2Fpress-release%2Fpress-release-bombardier-supply-10-additional-light-rail-vehicles-manchester-metrolink-tsx-bbd.a-1864639.htm&date=2013-12-23|quote=To date Bombardier and Vossloh Kiepe have delivered 77 vehicles to Manchester. This option for 10 further vehicles brings the total number of LRVs ordered for the city from the consortium to 104}}</ref> This will bring the fleet total to 104.

Built by [[Bombardier Transportation]] and [[Vossloh Kiepe]], and costing £2,000,000 each, the M5000 vehicles were introduced to Metrolink in December 2009, driven by increased passenger demand.<ref name=metuk/> They are part of the [[Flexity Swift]] range of light rail vehicles, and have a design similar to the K5000 vehicle used on the [[Cologne Stadtbahn]],<ref name=catchup>{{cite news |url=http://www.railwaygazette.com/news/urban/single-view/view/manchester-plays-catch-up-with-metrolink-expansion.html |title= Manchester plays catch-up with Metrolink expansion |first=Nick |last=Kingsley |date=19 October 2007 |accessdate=12 January 2013 |work=Railway Gazette International |location= London}}</ref><ref name=metuk/> in a yellow and silver livery.<ref name=oldest/><ref name=up>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/transport/public_transport/s/1186881_2m_tram_is_up_and_running |date=21 December 2009 |title=£2m tram is up and running |work=Manchester Evening News |accessdate=20 January 2013}}</ref><ref name=yellow>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/s/1125664_futures_yellow_for_trams |date=13 July 2009 |title=Future's yellow for trams |work=Manchester Evening News |accessdate=20 January 2013}}</ref> Originally eight M5000s were planned to provide additional capacity, which increased to 12 with the approval of the spur to MediaCityUK.<ref name=metuk/> A total of 94 M5000s were procured by TfGM for the phase 3 extensions and fleet replacement.<ref name=oldest/><ref name=axed/> They will be given fleet numbers from 3001 to 3094. Built to the requirements of the 2010 [[Rail Vehicle Accessibility Regulations]], the nominal capacity of each M5000 is 206 passengers, of whom 52–60 are seated.<ref>{{cite web |url= http://www.metrolink.co.uk/futuremetrolink/Pages/new-trams.aspx |title=A new generation of trams for Greater Manchester |accessdate=20 January 2013 |publisher=Metrolink}}</ref><ref>{{cite news |title= Metrolink's next trams to have extra seats following passenger plea |url= http://menmedia.co.uk/manchestereveningnews/news/s/1589695_metrolinks-next-trams-to-have-extra-seats-following-passenger-plea |work=Manchester Evening News |date=26 September 2012 |first=Dean |last=Kirby |accessdate=20 January 2013}}</ref> In July 2012, TfGM announced that the Greater Manchester Combined Authority had agreed that all T-68s and T-68As would be retired and replaced by M5000 vehicles, which are lighter, quieter, more energy-efficient and four times more reliable than the older T-68 models.<ref name=oldest/><ref name=axed>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/transport/public_transport/s/1583611_happy-birthday-metrolink-old-trams-axed-as-network-turns-20 |date=17 July 2012 |title=Happy birthday Metrolink: Old trams axed as network turns 20 |work=Manchester Evening News |accessdate=29 January 2013}}</ref> This replacement plan would provide Metrolink with a uniform fleet by 2014.<ref name=oldest/> In October 2013, the authority agreed to procure a further ten M5000s in 2014 to facilitate the construction of the proposed Trafford Park line, while in the interim supporting a service between MediaCityUK and Manchester city centre.<ref name=sec/> A press release from Bombardier, dated 20 December 2013, stated that Metrolink had ordered a further ten vehicles.<ref>
{{cite news
| url = http://www.marketwired.com/press-release/press-release-bombardier-supply-10-additional-light-rail-vehicles-manchester-metrolink-tsx-bbd.a-1864639.htm
| title = Bombardier to Supply 10 Additional Light Rail Vehicles to Manchester Metrolink in the UK
| publisher = [[Marketwired]]
| author =
| date = 2013-12-20
| page =
| location = [[Manchester, UK]]
| isbn =
| accessdate = 2013-12-23
| archivedate = 2013-12-23
| archiveurl = http://www.webcitation.org/query?url=http%3A%2F%2Fwww.marketwired.com%2Fpress-release%2Fpress-release-bombardier-supply-10-additional-light-rail-vehicles-manchester-metrolink-tsx-bbd.a-1864639.htm&date=2013-12-23
| deadurl = No
| quote = To date Bombardier and Vossloh Kiepe have delivered 77 vehicles to Manchester. This option for 10 further vehicles brings the total number of LRVs ordered for the city from the consortium to 104.
}}
</ref> The M5000s became the exclusive passenger vehicle of Metrolink on 1 May 2014.<ref name=end/>


Metrolink has one Special Purpose Vehicle (SPV) from 1991.{{sfn|Holt|1992|p=48}} It is numbered 1027 and its wagon numbered 1028. It is a bespoke diesel-powered vehicle with a crane, inspection platform, mobile workshop, and capacity for a driver and three passengers.{{sfn|Holt|1992|p=48}} It was designed to assist with vehicle recovery and track and line repairs.{{sfn|Holt|1992|p=48}}
Metrolink has one Special Purpose Vehicle (SPV) from 1991.{{sfn|Holt|1992|p=48}} It is numbered 1027 and its wagon numbered 1028. It is a bespoke diesel-powered vehicle with a crane, inspection platform, mobile workshop, and capacity for a driver and three passengers.{{sfn|Holt|1992|p=48}} It was designed to assist with vehicle recovery and track and line repairs.{{sfn|Holt|1992|p=48}}


===Depots===
===Depots===
Metrolink House at Queens Road in [[Cheetham Hill]] is the headquarters of Metrolink.{{sfn|Holt|1992|p=79}} Constructed during Phase 1, it served jointly as a control centre, HQ, office space, and depot for the storage, maintenance and repair of vehicles.{{sfn|Holt|1992|p=79}} Under the original proposals, Metrolink House was much larger, with a design which would support network expansion, but this design did not obtain the necessary [[planning permission]] from [[Manchester City Council]].{{sfn|Holt|1992|p=79}} Consequently, Metrolink House was scaled down to a {{convert|4|ha|acre|adj=on}} £8,000,000 site with finite capacity,{{sfn|Holt|1992|p=79}}{{sfn|Ogen|Senior|1991|p=43}} and, in light of Phase 3a network expansion, Metrolink built a second depot at Elsinore Road in [[Old Trafford, Greater Manchester|Old Trafford]] in 2011.{{sfn|GMPTE|2010|p=6}}{{sfn|TfGM|2012|p=23}} This second depot occupies the site of a former warehouse, and can house up to 96 vehicles.{{sfn|TfGM|2012|p=23}} On 7 May 2013 Metrolink completed the transfer of its main operational functions from Cheetham Hill to Old Trafford, meaning its control room – known as the Network Management Centre – is housed jointly with the Customer Services team by its newer depot.<ref>{{cite news |url= http://www.manchesterconfidential.co.uk/News/Metrolink-Completes-Move-To-Old-Trafford |work= Manchester Confidential |title=Metrolink Completes Move To Old Trafford |date=7 May 2013 |accessdate=11 May 2013}}</ref>
[[File:Geograph-3164054-by-Raymond-Knapman.jpg|thumb|[[Cheetham Hill]] (Queens Road) depot in October 2012]]
Metrolink House at Queens Road in [[Cheetham Hill]] is the headquarters of Metrolink.{{sfn|Holt|1992|p=79}} Constructed during Phase 1, it served jointly as a control centre, HQ, office space, and depot for the storage, maintenance and repair of vehicles.{{sfn|Holt|1992|p=79}} Under the original proposals, Metrolink House was much larger, with a design which would support network expansion, but this design did not obtain the necessary [[planning permission]] from [[Manchester City Council]].{{sfn|Holt|1992|p=79}} Consequently, Metrolink House was scaled down to a {{convert|4|ha|acre|adj=on}} £8 million site with finite capacity,{{sfn|Holt|1992|p=79}}{{sfn|Ogen|Senior|1991|p=43}} and, in light of Phase 3a network expansion, Metrolink built a second depot at Elsinore Road in [[Old Trafford, Greater Manchester|Old Trafford]] in 2011.{{sfn|GMPTE|2010|p=6}}{{sfn|TfGM|2012|p=23}} This second depot occupies the site of a former warehouse, and can house up to 96 vehicles.{{sfn|TfGM|2012|p=23}} On 7 May 2013 Metrolink completed the transfer of its main operational functions from Cheetham Hill to Old Trafford, meaning its control room – known as the Network Management Centre – is housed jointly with the Customer Services team by its newer depot.<ref>{{cite news |url= http://www.manchesterconfidential.co.uk/News/Metrolink-Completes-Move-To-Old-Trafford |work= Manchester Confidential |title=Metrolink Completes Move To Old Trafford |date=7 May 2013 |accessdate=11 May 2013}}</ref>


===Wi-Fi===
===Wi-Fi===
Line 230: Line 231:


===Service and hours of operation===
===Service and hours of operation===
{{double image|right|Shudehill Interchange, at night.jpg|175|Geograph-2206116-by-David-Dixon.jpg|175|alt=|Metrolink operating at night (left) and in December snow (right), at [[Shudehill Interchange|Shudehill]] and [[Radcliffe Metrolink station|Radcliffe]] respectively.||}}
{{double image|right|Shudehill Interchange, at night.jpg|175|Geograph-2206116-by-David-Dixon.jpg|175|alt=|Metrolink operating at night (left) and in December snow (right), at [[Shudehill Interchange]] and [[Radcliffe Metrolink station]] respectively.||}}
Before inauguration, GMPTE's original concept was for Metrolink's operator to provide a service every ten minutes from Bury-to-Piccadilly and Altrincham-to-Piccadilly {{FormatTime|6|00|24|00}}, Monday to Saturday.{{sfn|Ogden|Senior|1992|pp=124–127}} Greater Manchester Metrolink Limited, the system's original operator, argued for adjustments, citing the need to provide an efficient and commercially viable operation in line with vehicle running times and passenger demand.{{sfn|Ogden|Senior|1992|pp=124–127}} Due to power limitations, this pattern was modified to a twelve-minute service throughout the day, doubling to a six-minute service in peak periods, resulting in a "ten trams per hour" service pattern on routes running from Altrincham and Bury to Manchester every six minutes.{{sfn|Ogden|Senior|1992|pp=124–127}} Operators are required to provide this level of service at least 98% of the time, or incur a financial penalty charge.{{sfn|Ogden|Senior|1992|p=124}} This six-minute service pattern has been adopted on the rest of the network as the system has grown.<ref name=NextRochdale/><ref name=getquays/><ref name=brightORL>{{cite press release |url= http://www.metrolink.co.uk/extension/ORL_Extension_line_guide.pdf |title=Brightening up your day |year=2012 |accessdate=23 January 2013 |publisher= Metrolink}}</ref> Heavy snowfall during the [[Winter of 2009–2010 in Great Britain and Ireland|winter of 2009/10]] impaired Metrolink services and the operator was criticised for failing to have cold weather procedures.<ref name=firm/> This prompted a program to improve reliability and performance of the system in freezing conditions.<ref name=firm>{{cite news |url= http://www.manchestereveningnews.co.uk/news/local-news/metrolink-firm-slammed-over-unacceptable-875296 |work=Manchester Evening News |date=8 November 2011 |accessdate=23 January 2013 |title= Metrolink firm slammed over 'unacceptable' service}}</ref><ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/get-some-de-icer-passengers-fume-as-metrolink-trams-1221218 |work=Manchester Evening News |date=7 November 2011 |accessdate=23 January 2013 |title=Get some de-icer: Passengers fume as Metrolink trams are 'severely disrupted' by first frost of the winter}}</ref> Metrolink operated [[icebreaker]]-style vehicles at night during snowfall in January 2013 to provide normal services.<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/incoming/five-inches-of-snow-to-hit-manchester-1215043 |work=Manchester Evening News |date=16 January 2013 |first=Paul |last=Britton |title=Five inches of snow to hit Manchester |accessdate=23 January 2013}}</ref>
Before inauguration, GMPTE's original concept was for Metrolink's operator to provide a service every ten minutes from Bury-to-Piccadilly and Altrincham-to-Piccadilly {{FormatTime|6|00|24|00}}, Monday to Saturday.{{sfn|Ogden|Senior|1992|pp=124–127}} Greater Manchester Metrolink Limited, the system's original operator, argued for adjustments, citing the need to provide an efficient and commercially viable operation in line with vehicle running times and passenger demand.{{sfn|Ogden|Senior|1992|pp=124–127}} Due to power limitations, this pattern was modified to a twelve-minute service throughout the day, doubling to a six-minute service in peak periods, resulting in a "ten trams per hour" service pattern on routes running from Altrincham and Bury to Manchester every six minutes.{{sfn|Ogden|Senior|1992|pp=124–127}} Operators are required to provide this level of service at least 98% of the time, or incur a financial penalty charge.{{sfn|Ogden|Senior|1992|p=124}} This six-minute service pattern has been adopted on the rest of the network as the system has grown.<ref name=NextRochdale/><ref name=getquays/><ref name=brightORL>{{cite press release |url= http://www.metrolink.co.uk/extension/ORL_Extension_line_guide.pdf |title=Brightening up your day |year=2012 |accessdate=23 January 2013 |publisher= Metrolink}}</ref> Heavy snowfall during the [[Winter of 2009–2010 in Great Britain and Ireland|winter of 2009/10]] impaired Metrolink services and the operator was criticised for failing to have cold weather procedures.<ref name=firm/> This prompted a program to improve reliability and performance of the system in freezing conditions.<ref name=firm>{{cite news |url= http://www.manchestereveningnews.co.uk/news/local-news/metrolink-firm-slammed-over-unacceptable-875296 |work=Manchester Evening News |date=8 November 2011 |accessdate=23 January 2013 |title= Metrolink firm slammed over 'unacceptable' service}}</ref><ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/get-some-de-icer-passengers-fume-as-metrolink-trams-1221218 |work=Manchester Evening News |date=7 November 2011 |accessdate=23 January 2013 |title=Get some de-icer: Passengers fume as Metrolink trams are 'severely disrupted' by first frost of the winter}}</ref> Metrolink operated [[icebreaker]]-style vehicles at night during snowfall in January 2013 to provide normal services.<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/incoming/five-inches-of-snow-to-hit-manchester-1215043 |work=Manchester Evening News |date=16 January 2013 |first=Paul |last=Britton |title=Five inches of snow to hit Manchester |accessdate=23 January 2013}}</ref>


Line 439: Line 440:
* [[West Didsbury Metrolink station|West Didsbury]]
* [[West Didsbury Metrolink station|West Didsbury]]
* [[Didsbury Village Metrolink station|Didsbury Village]]
* [[Didsbury Village Metrolink station|Didsbury Village]]
* [[East Didsbury Metrolink station|East Didsbury]] ({{Rail-interchange|gb|rail}}<small>{{rws|East Didsbury}}</small>)
* [[East Didsbury Metrolink station|East Didsbury]]
| valign="top" |
| valign="top" |
* [[Manchester Piccadilly station|Piccadilly]] {{Rail-interchange|gb|rail}}
* [[Manchester Piccadilly station|Piccadilly]] {{Rail-interchange|gb|rail}}
Line 468: Line 469:
{{clear}}
{{clear}}
'''Monday to Saturday service''':<ref name=getquays>{{cite web |url= http://www.tfgm.com/buses/Pages/Getting-to-Salford-Quays.aspx |publisher= Transport for Greater Manchester |accessdate=23 January 2013 |title=Getting to The Quays and MediaCityUK}}</ref><ref name=brightORL/>
'''Monday to Saturday service''':<ref name=getquays>{{cite web |url= http://www.tfgm.com/buses/Pages/Getting-to-Salford-Quays.aspx |publisher= Transport for Greater Manchester |accessdate=23 January 2013 |title=Getting to The Quays and MediaCityUK}}</ref><ref name=brightORL/>
* [[Altrincham Interchange|Altrincham]] – [[Bury Interchange|Bury]]: every 12 minutes
* [[Altrincham Interchange|Altrincham]] – [[Bury Interchange|Bury]]: every 12 minutes (daytime only)
* [[Altrincham Interchange|Altrincham]] – [[Manchester Piccadilly station|Piccadilly]]: every 12 minutes
* [[Altrincham Interchange|Altrincham]] – [[Manchester Piccadilly station|Piccadilly]]: every 12 minutes
* [[Bury Interchange|Bury]] – [[Abraham Moss Metrolink station|Abraham Moss]]: every 12 minutes (daytime only)
* [[Bury Interchange|Bury]] – [[Ashton-under-Lyne Metrolink station|Ashton-under-Lyne]]: every 12 minutes
* [[Eccles Metrolink station|Eccles]] – [[Ashton-under-Lyne Metrolink station|Ashton-under-Lyne]]: every 12 minutes
* [[Eccles Metrolink station|Eccles]] – [[Manchester Piccadilly station|Piccadilly]]: every 12 minutes
* [[MediaCityUK Metrolink station|MediaCityUK]] – [[Manchester Piccadilly station|Piccadilly]]: every 12 minutes (daytime only – evening journeys provided by Eccles services)
* [[MediaCityUK Metrolink station|MediaCityUK]] – [[Manchester Piccadilly station|Piccadilly]]: every 12 minutes (daytime only – evening journeys provided by Eccles services)
* [[East Didsbury Metrolink station|East Didsbury]] – [[Rochdale Town Centre Metrolink station|Rochdale Town Centre]]: every 12 minutes
* [[East Didsbury Metrolink station|East Didsbury]] – [[Rochdale Town Centre Metrolink station|Rochdale Town Centre]]: every 12 minutes

The combined Monday-Saturday daytime frequency on the Bury and Altrincham routes is every 6 minutes.


'''Sunday and public holiday service''':<ref name=getquays/><ref name=brightORL/>
'''Sunday and public holiday service''':<ref name=getquays/><ref name=brightORL/>
* [[Altrincham Interchange|Altrincham]] – [[Bury Interchange|Bury]]: every 12 minutes
* [[Altrincham Interchange|Altrincham]] – [[Manchester Piccadilly station|Piccadilly]]: every 12 minutes {{FormatTime|10|00|17|00}}, every 15 minutes at other times
* [[Eccles Metrolink station|Eccles]] – [[Ashton-under-Lyne Metrolink station|Ashton-under-Lyne]] via [[MediaCityUK Metrolink station|MediaCityUK]]: every 12 minutes {{FormatTime|10|00|17|00}}, every 15 minutes at other times
* [[Bury Interchange|Bury]] – [[Ashton-under-Lyne Metrolink station|Ashton-under-Lyne]]: every 12 minutes {{FormatTime|10|00|17|00}}, every 15 minutes at other times
* [[Eccles Metrolink station|Eccles]] – [[Manchester Piccadilly station|Piccadilly]] via [[MediaCityUK Metrolink station|MediaCityUK]]: every 12 minutes {{FormatTime|10|00|17|00}}, every 15 minutes at other times
* [[East Didsbury Metrolink station|East Didsbury]] – [[Rochdale Town Centre Metrolink station|Rochdale Town Centre]]: every 12 minutes {{FormatTime|9|30|17|30}}, every 15 minutes at other times
* [[East Didsbury Metrolink station|East Didsbury]] – [[Rochdale Town Centre Metrolink station|Rochdale Town Centre]]: every 12 minutes {{FormatTime|9|30|17|30}}, every 15 minutes at other times
{{clear}}
{{clear}}
Line 483: Line 487:
===Ticketing===
===Ticketing===
[[File:Geograph-2632800-by-Gerald-England.jpg|thumb|right|upright|A Metrolink ticket vending machine at [[Stretford Metrolink station]].]]
[[File:Geograph-2632800-by-Gerald-England.jpg|thumb|right|upright|A Metrolink ticket vending machine at [[Stretford Metrolink station]].]]
Metrolink fares were originally set by the system's operator,{{sfn|Ogden|Senior|1992|pp=124–127}} but are now set by the TfGM Committee at levels that cover both the running costs and the cost of borrowing that has part-funded the expansion of the system;{{sfn|TfGM|GMCA|2011|p=97}} Metrolink receives no public subsidy.<ref name=greatbreak/>{{sfn|Ogden|Senior|1992|p=126}} Fares typically rise each January above the rate of inflation.<ref name=zone/><ref>{{cite news |url= http://www.bbc.co.uk/news/uk-england-manchester-11787624 |title=Call to rethink rise in Greater Manchester tram fares |date=18 November 2010 |accessdate=20 January 2013 |work= BBC News}}</ref> The fare tariff is based on a division of the network's stations into fare zones.{{sfn|Ogden|Senior|1992|p=128}} Persons under 16 years of age, persons of [[pension]]able age, and people with disabilities qualify for concessionary fares, some of which are mandatory and others discretionary, as determined by the [[Greater Manchester Combined Authority]].{{sfn|TfGM|GMCA|2011|p=97}} The Greater Manchester Combined Authority permits reduced fares for persons under 16 years of age, and free or reduced fares on Metrolink after {{FormatTime|9|30}} for pensioners.{{sfn|TfGM|GMCA|2011|p=97}} In normal circumstances, tickets cannot be purchased on board Metrolink vehicles, and must be purchased from a ticket vending machine before boarding the vehicle.{{sfn|Holt|1992|p=83}} Fare evasion in 2006 was estimated at 2–6% of all users,<ref>{{cite journal |first1=Laurent| last1=Dauby| first2=Zoltan| last2=Kovacs |date=January 2007 |title=Fare Evasion in Light Rail Systems |journal=Transportation Research Circular |issue= E-C112 – Proceedings Joint International Light Rail Conference, St. Louis, Missouri, 9–11 April 2006 |pages=230–247 |location= Washington, DC |publisher=Transportation Research Board |issn=0097-8515 |accessdate= 21 January 2013 |url= http://onlinepubs.trb.org/onlinepubs/circulars/ec112.pdf}}</ref> and in 2012 at 2.5% of all users.<ref name=fare>{{cite news|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/metrolink-bosses-track-halt-900-4749691|title=Metrolink bosses on track to halt the 900 fare dodgers|date=29 June 2013|accessdate=30 June 2013|first=Charlotte|last=Cox|work=Manchester Evening News}}</ref> Checking tickets and passes and issuing [[penalty fare]]s is the responsibility of Metrolink's Passenger Services Representatives (PSRs), who provide security and assistance on the network;{{sfn|TfGM|2012|p=20}}<ref name=fare/> between 1992 and 2008, [[Greater Manchester Police]] had a dedicated Metrolink unit responsible for policing the system.<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/racist-attack-prakash-devyani-patel-1761509 |work=Manchester Evening News |date=19 March 2013 |last=Cox |first=Charlotte |accessdate=19 March 2013 |title=Racist attack on dad and daughter sparks tram policing review}}</ref> The original ticket vending machines were designed by [[Thorn EMI]].{{sfn|Ogden|Senior|1992|p=128}} In 2005 GMPTE announced that rail passengers travelling from within Greater Manchester into Manchester city centre can use the Metrolink service between the eight City Zone stations for free.<ref>{{Cite news |title= Free tram rides for train riders |url= http://news.bbc.co.uk/1/hi/england/manchester/4385122.stm |work=BBC News |date=28 October 2005 |accessdate=17 February 2013}}</ref> Passengers must present a valid rail ticket, correctly dated with [[Manchester station group|Manchester Ctlz]] as the destination.<ref>{{Cite web |title=Freedom of the City |url=http://www.tfgm.com/Corporate/Pages/Freedom-of-the-city.aspx |publisher= Transport for Greater Manchester |accessdate=17 February 2013}}</ref><ref>{{Cite web |title=Freedom of the City |page=4 |url=http://www.tfgm.com/Corporate/Documents/Information/11-0807-CTLZ-2011-Campaign-A5-AW.pdf |publisher= Transport for Greater Manchester |accessdate=17 February 2013}}</ref> In 2007 TfGM rolled out new ticket vending machines, designed to accept credit/debit card payments and permit the purchase of multiple tickets in a single transaction.{{sfn|TfGM|GMCA|2011|p=79}} These were replaced in 2009 with [[touchscreen]] machines, designed with the [[Scheidt & Bachmann Ticket XPress]] system.{{sfn|GMPTE|2009|p=4}} In October 2012, TfGM announced it was devising a simpler zonal fare system, comparable to [[London fare zones]], and preparing to introduce [[Get Me There]], the region's new contactless smartcard, for use on all public transport modes in Greater Manchester, including Metrolink.<ref name=zone>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/transport/public_transport/s/1590961_metrolink-set-to-move-to-new-zone-ticket-prices |title=Metrolink set to move to new 'zone' ticket prices |work=Manchester Evening News |date=11 October 2012 |accessdate=19 January 2013}}</ref> This is being rolled out in stages, with holders of National Concessionary Travel Passes to be the first to be able to use Get Me there, after trial users.<ref>http://www.getmethere.com/when-its-arriving.php</ref>
Metrolink fares were originally set by the system's operator,{{sfn|Ogden|Senior|1992|pp=124–127}} but are now set by the TfGM Committee at levels that cover both the running costs and the cost of borrowing that has part-funded the expansion of the system;{{sfn|TfGM|GMCA|2011|p=97}} Metrolink receives no public subsidy.<ref name=greatbreak/>{{sfn|Ogden|Senior|1992|p=126}} Fares typically rise each January above the rate of inflation.<ref name=zone/><ref>{{cite news |url= http://www.bbc.co.uk/news/uk-england-manchester-11787624 |title=Call to rethink rise in Greater Manchester tram fares |date=18 November 2010 |accessdate=20 January 2013 |work= BBC News}}</ref> The fare tariff is based on a division of the network's stations into fare zones.{{sfn|Ogden|Senior|1992|p=128}} Persons under 16 years of age, persons of [[pension]]able age, and people with disabilities qualify for concessionary fares, some of which are mandatory and others discretionary, as determined by the [[Greater Manchester Combined Authority]].{{sfn|TfGM|GMCA|2011|p=97}} The Greater Manchester Combined Authority permits reduced fares for persons under 16 years of age, and free or reduced fares on Metrolink after {{FormatTime|9|30}} for pensioners.{{sfn|TfGM|GMCA|2011|p=97}} In normal circumstances, tickets cannot be purchased on board Metrolink vehicles, and must be purchased from a ticket vending machine before boarding the vehicle.{{sfn|Holt|1992|p=83}} Fare evasion in 2006 was estimated at 2–6% of all users,<ref>{{cite journal |first1=Laurent| last1=Dauby| first2=Zoltan| last2=Kovacs |date=January 2007 |title=Fare Evasion in Light Rail Systems |journal=Transportation Research Circular |issue= E-C112 – Proceedings Joint International Light Rail Conference, St. Louis, Missouri, 9–11 April 2006 |pages=230–247 |location= Washington, DC |publisher=Transportation Research Board |issn=0097-8515 |accessdate= 21 January 2013 |url= http://onlinepubs.trb.org/onlinepubs/circulars/ec112.pdf}}</ref> and in 2012 at 2.5% of all users.<ref name=fare>{{cite news|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/metrolink-bosses-track-halt-900-4749691|title=Metrolink bosses on track to halt the 900 fare dodgers|date=29 June 2013|accessdate=30 June 2013|first=Charlotte|last=Cox|work=Manchester Evening News}}</ref> Checking tickets and passes and issuing [[penalty fare]]s is the responsibility of Metrolink's Passenger Services Representatives (PSRs), who provide security and assistance on the network;{{sfn|TfGM|2012|p=20}}<ref name=fare/> between 1992 and 2008, [[Greater Manchester Police]] had a dedicated Metrolink unit responsible for policing the system.<ref>{{cite news |url= http://www.manchestereveningnews.co.uk/news/greater-manchester-news/racist-attack-prakash-devyani-patel-1761509 |work=Manchester Evening News |date=19 March 2013 |last=Cox |first=Charlotte |accessdate=19 March 2013 |title=Racist attack on dad and daughter sparks tram policing review}}</ref> The original ticket vending machines were designed by [[Thorn EMI]].{{sfn|Ogden|Senior|1992|p=128}} In 2005 GMPTE announced that rail passengers travelling from within Greater Manchester into Manchester city centre can use the Metrolink service between the eight City Zone stations for free.<ref>{{Cite news |title= Free tram rides for train riders |url= http://news.bbc.co.uk/1/hi/england/manchester/4385122.stm |work=BBC News |date=28 October 2005 |accessdate=17 February 2013}}</ref> Passengers must present a valid rail ticket, correctly dated with [[Manchester station group|Manchester Ctlz]] as the destination.<ref>{{Cite web |title=Freedom of the City |url=http://www.tfgm.com/Corporate/Pages/Freedom-of-the-city.aspx |publisher= Transport for Greater Manchester |accessdate=17 February 2013}}</ref><ref>{{Cite web |title=Freedom of the City |page=4 |url=http://www.tfgm.com/Corporate/Documents/Information/11-0807-CTLZ-2011-Campaign-A5-AW.pdf |publisher= Transport for Greater Manchester |accessdate=17 February 2013}}</ref> In 2007 TfGM rolled out new ticket vending machines, designed to accept credit/debit card payments and permit the purchase of multiple tickets in a single transaction.{{sfn|TfGM|GMCA|2011|p=79}} These were replaced in 2009 with [[touchscreen]] machines, designed with the [[Scheidt & Bachmann Ticket XPress]] system.{{sfn|GMPTE|2009|p=4}} In October 2012, TfGM announced it was devising a simpler zonal fare system, comparable to [[London fare zones]], and preparing to introduce [[Get Me There]], the region's new contactless smartcard, for use on all public transport modes in Greater Manchester, including Metrolink.<ref name=zone>{{cite news |url= http://menmedia.co.uk/manchestereveningnews/news/transport/public_transport/s/1590961_metrolink-set-to-move-to-new-zone-ticket-prices |title=Metrolink set to move to new 'zone' ticket prices |work=Manchester Evening News |date=11 October 2012 |accessdate=19 January 2013}}</ref>


==Patronage==
==Patronage==
The Department for Transport reported passenger journeys for the 2013/14 [[fiscal year]] at 29.2 million; up from 25 million the previous year.<ref name=stats/> Patronage rose steadily in the years following the Phase 1 system's opening, from a start-point of 8.1 million in the 1992/93 fiscal year to 14.2 million in 1999/2000.<ref name=stats/> Two years of more rapid increase followed the opening of the Phase 2 extensions; succeeded by another period of fairly steady increase to 21.1 million journeys in 2008/09; although numbers then fell to 19.6 million in the 2009/10 fiscal year.<ref name=stats/> Metrolink revised its method for calculating passenger boardings in 2010/11, meaning figures from that year onwards are not directly comparable with previous years; while the rapid increases in patronage since 2011/12 largely reflect the ongoing Phase 3 expansion programme.<ref name=statsrelease/>
According to TfGM, more than 21 million passenger journeys were made in 2011,{{sfn|TfGM|2012|p=23}}{{sfn|TfGM|2012|p=38}} and the Department for Transport placed passenger journeys for the 2011/12 [[fiscal year]] at 21.8 million.<ref name=stats/> Patronage has risen steadily since its opening, from a start-point of 8.1 million in the 1992/93 fiscal year.<ref name=stats/> Travel increased from 18.2 million journeys in 2001/02 to 20 million journeys in 2008/09; numbers fell to 18.7 million in 2009 while parts of the system were closed for upgrades, but recovered{{sfn|TfGM|GMCA|2011|p=27}} to 19.6 million for the 2009/10 fiscal year.<ref name=stats/> Metrolink revised its method for calculating passenger boardings in 2010/11, meaning figures are not directly comparable with previous years.<ref name=stats/> TfGM predicts around 22 million passenger journeys on Metrolink in 2012,<ref name=complaints/> and an increase of 46% by 2026.<ref name=saldel/>


{|class="wikitable" style="text-align:center;"
{|class="wikitable" style="text-align:center;"
Line 492: Line 496:
! colspan="12" style="background:#{{MML color}}; color:black;"|'''Estimated passenger journeys made on Metrolink per [[fiscal year]]'''
! colspan="12" style="background:#{{MML color}}; color:black;"|'''Estimated passenger journeys made on Metrolink per [[fiscal year]]'''
|-
|-
! style="background:#{{MML color}}; color:black;"|Year
! style="background:#{{MML color}}; color:black;"|Passenger journeys
! style="background:#fff; color:#fff;"|<!---blank--->
! style="background:#{{MML color}}; color:black;"|Year
! style="background:#{{MML color}}; color:black;"|Year
! style="background:#{{MML color}}; color:black;"|Passenger journeys
! style="background:#{{MML color}}; color:black;"|Passenger journeys
Line 512: Line 513:
! style="background:#fff; color:black;"| 2006/07
! style="background:#fff; color:black;"| 2006/07
| style="background:#fff; color:#black;"| 19.8m
| style="background:#fff; color:#black;"| 19.8m
| style="background:#fff; color:#fff;" rowspan="7"|
! style="background:#fff; color:black;"| 2013/14
| style="background:#fff; color:#black;"| 29.2m
|-
|-
! style="background:#fff; color:black;"| 1993/94
! style="background:#fff; color:black;"| 1993/94
Line 558: Line 556:
| style="background:#fff; color:#black;"|25.0m
| style="background:#fff; color:#black;"|25.0m
|-
|-
| colspan="16" style="background:#fff; font-size:90%;"|Estimates provided by TfGM to the [[Department for Transport]],<ref name=statsrelease/> based on sales from ticket machines.{{#tag:ref|Estimates excludes free travel such as Concessionary Bus Pass for pensioners and tickets sold through other vendors.<ref name=stats/>|group=note}}
| colspan="8" style="background:#fff; font-size:90%;"|Estimates provided by TfGM to the [[Department for Transport]],<ref name=statsrelease/> based on sales from ticket machines.{{#tag:ref|Estimates excludes free travel such as Concessionary Bus Pass for pensioners and tickets sold through other vendors.<ref name=stats/>|group=note}}
|}
|}


Line 607: Line 605:
{{Transport in Greater Manchester}}
{{Transport in Greater Manchester}}
{{Britishmetros}}
{{Britishmetros}}
{{Use dmy dates|date=November 2013}}


[[Category:Electric railways in the United Kingdom]]
[[Category:Light rail in the United Kingdom]]
[[Category:Light rail in the United Kingdom]]
[[Category:Manchester Metrolink| ]]
[[Category:Railway lines opened in 1992]]
[[Category:Transport in Greater Manchester]]
[[Category:Transport in Greater Manchester]]
[[Category:Tram transport in England]]
[[Category:Tram transport in England]]
[[Category:1992 establishments in England]]
[[Category:Electric railways in the United Kingdom]]
[[Category:Manchester Metrolink| ]]

Revision as of 09:24, 7 July 2014

Metrolink
File:Manchester Metrolink 2008 logo.png
An M5000 at Exchange Quay Metrolink station in Salford
Overview
OwnerTransport for Greater Manchester
LocaleGreater Manchester
Transit typeTram/Light rail[1][2][3]
Number of lines6
Number of stations77
Annual ridership25 million (2012/13)[2]
Chief executivePeter Cushing (Metrolink Director)[4]
Chris Coleman (Managing Director)[5]
HeadquartersMetrolink House[6]
Queens Road
Cheetham Hill
Manchester
England
Websitewww.metrolink.co.uk
Operation
Began operation6 April 1992 (1992-04-06)
Operator(s)RATP Group[7]
Number of vehicles≤94 M5000s
Train length28.4 metres (93 ft)
Technical
System length48.5 miles (78.1 km)[8]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius of curvature25 m (82 ft)[9]
ElectrificationOverhead line (750 V DC)
Top speed50 miles per hour (80 km/h)[9]

Metrolink[note 1] is a light rail system in Greater Manchester, England. The network consists of six lines which radiate from Manchester city centre and terminate at Altrincham, Ashton-under-Lyne, Bury, Didsbury, Eccles, and Rochdale. The system is owned by Transport for Greater Manchester (TfGM) and operated and maintained under contract by RATP Group.[3][7] Also referred to as Manchester Metrolink,[2] 25 million passenger journeys were made on the system in 2012/13.[2]

A light rail system for Greater Manchester was born of Greater Manchester County Council's obligations to provide "an integrated and efficient system of public transport" under its structure plan and the Transport Act 1968.[16] Greater Manchester's public transport network suffered from poor north – south connections, exacerbated by the location of Manchester's main railway stations, Piccadilly and Victoria, which were unconnected and lay at opposing edges of central Manchester. Abandoning the monorail and underground options conceived in the 1960s and 1970s, light rail was proposed in 1982 as the best and most economical public transport solution for Manchester city centre and the surrounding Greater Manchester metropolitan area, and gathered support throughout the 1980s as an appropriate integrated commuter service. Government approval was granted in 1988 and the network began operating services between Bury Interchange and Victoria on 6 April 1992. This founded the United Kingdom's first modern street running rail system and its second operational public tram system; the 1885-built Blackpool tramway being the only heritage tram system in the UK which endured up to Metrolink's creation.[17]

Metrolink has 77 stops along 48.5 miles (78.1 km) of standard gauge track[8] which is routed through seven of the ten boroughs of Greater Manchester. The system has a mix of designated light railway (segregated from other traffic) and on-street tramway (shared with pedestrians and motor vehicles). Its fleet of passenger vehicles is composed of Bombardier Flexity Swift M5000s, but also used Ansaldo Firema T-68/T-68As between 1992 and 2014. These vehicles were originally termed LRVs (light rail vehicles),[18] but have become widely known as trams.[19] Other changes include a yellow and silver branding and livery, which replaced the system's original grey and aquamarine identity in 2008.

Expansion of Metrolink has been a key strategy of transport planners in Greater Manchester, who have overseen its development in successive projects, known as Phases 1, 2, 3a, 3b and 2CC, which, upon completion of Phases 3b and 2CC in 2016/17, will make Metrolink the largest light rail network in the United Kingdom, with 60 miles (97 km) of track and 93 stops, handling an estimated 45 million passenger journeys a year.[20] TfGM have endorsed further expansion with proposals for new lines to Stockport and Port Salford, and the addition of tram-train technology.

History

Origins

A light rail system for Greater Manchester was born of a desire by the Greater Manchester County Council to fulfil its obligations to provide "an integrated and efficient system of public transport" under its structure plan and the Transport Act 1968.[16] Greater Manchester's public transport network suffered from poor north – south connections, exacerbated by the location of Manchester's main railway stations, Piccadilly and Victoria,[10][21] which were unconnected and located at opposing edges of its city centre.[16][21] Piccadilly and Victoria were built in the 1840s by rival companies on cheaper land on the fringes of the city centre, resulting in poor integration and access to the central business zone.[22] In as early as 1839, in anticipation of the stations being built, a connecting underground railway tunnel was proposed but abandoned on economic grounds,[10][22] as was an overground suspended-monorail in 1966.[23] SELNEC Passenger Transport Executive — the body tasked with improving public transport for Manchester and its surrounding municipalities in the 1960s – made draft proposals for a Picc-Vic tunnel,[24] "a proposed rail route beneath the city centre" forming "the centrepiece of a new electrified railway network for the region".[25] Despite investigatory tunnelling under the Manchester Arndale shopping centre,[25] when the Greater Manchester County Council presented the project to the United Kingdom Government in 1974,[26] it was unable to secure the necessary funding,[27] and was abandoned on economic grounds when the County Council dropped the plans in 1977.[24][26]

In 1982, the Greater Manchester Passenger Transport Executive (GMPTE; the successor to SELNEC PTE) concluded that an overground metropolitan light rail system to replace or complement the region's under-used heavy railways was the most economical solution to improving Greater Manchester's public transport network, which suffered from poor integration and outdated infrastructure;[21] a Rail Study Group, composed of officials from British Rail, Greater Manchester County Council and GMPTE formally endorsed the scheme in 1984.[16] Abstract proposals based on light rail systems in North America and continental Europe,[28] and a draft 62-mile (100 km) network consisting of three lines were presented by the Rail Study Group to the UK Government for funding.[24] Following route revisions in 1984 and 1987,[24][29] and a trial on 9 February 1987 using Docklands Light Railway rolling stock on a freight-only line adjacent to Debdale Park,[30] funding was granted by HM Treasury with the strict condition that the system be constructed in phases.[24] Additional funding came from the European Regional Development Fund and bank lending.[31]

Phase 1

Altrincham Metrolink station in July 1992. This stop opened on 15 June 1992 as part of Phase 1.

Conversion of the East Lancashire Railway (Bury-to-Victoria) and Manchester, South Junction and Altrincham Railway (Altrincham-to-Piccadilly) heavy rail lines, and creation of a street-level tramway[32] through Manchester city centre to unite the lines as a single 19.2-mile (30.9 km) network,[33] was chosen for Phase 1 because the two heavy rail lines were primarily used for commuting to central Manchester, and would improve north – south links and access to the city centre.[34][35][36][33] The required parliamentary authority to proceed with Phase 1 was obtained with two Acts of Parliament – the Greater Manchester (Light Rapid Transit System) Act 1988 and Greater Manchester (Light Rapid Transit System) (No. 2) Act 1988.[37]

On 27 September 1989, following a two-stage tender exercise, the Greater Manchester Passenger Transport Authority awarded a contract to the GMA Group (a consortium composed of AMEC, GM Buses, John Mowlem and Company, and a General Electric Company plc subsidiary)[38] who formed Greater Manchester Metrolink Limited to design, build, operate and maintain Phase 1 of Metrolink.[39] The contract was approved by Michael Portillo on behalf of the Department for Transport on 24 October 1989, and formally signed on 6 June 1990.[39]

The Bury line was closed in stages between 13 July 1991 and 17 August 1991, after which the 1200V DC third rail electrified line was adapted for a 750V DC overhead line operation.[40] In Manchester city centre, a tramway – built with network expansion in mind[41] – from Victoria to Piccadilly via Market Street and Piccadilly Gardens connected Bury to Altrincham via Manchester; The overhead structures and wiring of the Altrincham line were adapted for light rail.[40] As well as upgrades to signalling and stations on the network, a combined headquarters, depot and control centre was built at Cheetham Hill on Queens Road, north of Victoria station,[40] at a cost of £8 million (£21,700,000 as of 2024[42]).[43]

Initially projected to open in September 1991, then promised for 21 February 1992,[44] Metrolink began operation on 6 April 1992 with a service between Victoria and Bury.[45][46] Along with the Tyne and Wear Metro and Docklands Light Railway, it helped to reintroduce light rail to the United Kingdom.[47][48] The network was expanded beyond Victoria to G-Mex Metrolink station on 27 April 1992; a service through to Altrincham joined the network on 15 June 1992,[46] completing Phase 1 and enabling use of all 26 T-68 vehicles acquired for the operation.[40][49] Elizabeth II declared Metrolink open at a ceremony in Manchester on 17 July 1992, adding that Metrolink would improve communication between northern and southern Greater Manchester.[49][46][50] After the ceremony the Queen visited Manchester Town Hall and rode from St Peter's Square to Bury to visit Bury Town Hall.[49][46]

Then costing £145 million (£379,000,000 as of 2024[42])[31] Phase 1 was expected to carry 10 million passengers per year,[51] but surpassed this figure by the 1993/94 fiscal year, and every year thereafter.[52] In recognition of passenger demands and the decommissioning of the Arndale bus station after the 1996 Manchester bombing, adjustments were made to Phase 1 to the design of Manchester City Council's city centre masterplan, by modifying Market Street Metrolink station to handle two-way traffic, demolishing High Street Metrolink station in 1998 and creating a new stop for Shudehill Interchange in 2002.[53][54] Sections of track in the city centre were relaid following damage to the road surface adjacent to the line.[55] By 2003, Phase 1 was deemed a "long-term success" by GMPTE, and, with overcrowding at peak times, carried more than 15 million passengers per year.[56][20]

Phase 2

Cornbrook Metrolink station, with a T-68A vehicle specially acquired for the new Eccles Line, opened in 1999 as part of Phase 2

Extension of the Metrolink network was intended to be continuous with successive expansion phases delivered in strict order of priority.[57][58] GMPTE wanted to repeat its "success" with Phase 1 by converting other parts of Greater Manchester's under-utilised suburban rail network.[59] However, changes in circumstances and new opportunities, combined with a shift in government policy following the early 1990s recession stalled the immediate expansion of Metrolink after Phase 1.[58][60] Phase 1a, a proposed east – west route from Eastlands to Dumplington via Salford Quays was muted by uncertainty surrounding the Manchester bid for the 2000 Summer Olympics, the (unbuilt) Trafford Centre, and regeneration of Manchester Docks respectively.[57][61] Nevertheless, throughout the 1990s, the Greater Manchester Passenger Transport Authority continued to acquire rights to construct Metrolink lines under the Transport and Works Act 1992.[31]

During the 1990s, Salford Quays became a business district specifically redeveloped for commerce, leisure, culture and tourism with a high density of business units and modern housing, complemented by a cinema complex, office blocks, and waterfront promenade.[62] As it had poor public transport integration and no rail provision, it was earmarked for a potential Metrolink line as early as 1986 and legal authority to construct the line through the Quays was acquired in 1990.[31][63] The Quays received millions of pounds of investment and a public consultation and public inquiry resulted in government endorsement in 1994. In autumn 1995 a 4-mile (6.4 km) Metrolink line branching from Cornbrook Metrolink station to Eccles via Salford Quays capitalising on the regenerated Quayside was confirmed as Phase 2 of Metrolink.[31][40][63] No funding came from central government and money was raised from the Greater Manchester Passenger Transport Authority (GMPTA), the European Regional Development Fund and private developers.[31][63] In April 1997 Altram, a consortium of the Serco Group plc, Gio. Ansaldo & C. and John Laing plc was appointed to construct the Eccles Line; Serco, responsible for the Sheffield Supertram would operate the whole network under contract; Ansaldo provided six additional vehicles — T-68As – and signalling equipment. Construction work officially began on 17 July 1997.[31][63][64]

The Eccles Line was officially opened as far as Broadway Metrolink station on 6 December 1999 by the Prime Minister, Tony Blair, who praised Metrolink as "exactly the type of scheme needed to solve the transport problems of the metropolitan areas of the country";[65][56] a service to Eccles Interchange joined the network on 21 July 2000,[40][31] and was officially declared open by Anne, Princess Royal at a ceremony on 9 January 2001.[66] On completion, Phases 1 and 2 gave Metrolink a total route length of 24 miles (39 km).[67] Phase 2 was predominantly privately funded and cost £160,000,000 (£340,160,000 as of 2024).[42][31] Salford City Council considered Phase 2 "an important contribution to Salford's public transport network, providing a fast and frequent service between Eccles, Salford Quays and Manchester city centre".[3] But, in competition with comparatively quicker and cheaper buses, the line navigated the Quays on a slow and meandering route, and failed to reach its initial passenger targets.[60] Patronage increased during the 2000s as the Eccles Line steadily increased in popularity in keeping with a rise in passenger numbers across the whole Metrolink system and was beginning to become overcrowded by the end of the decade.[3]

Phase 3

In 2000, officials and transport planners in Greater Manchester considered Metrolink to be a "phenomenal success".[31] The system was exceeding patronage targets and reducing traffic congestion on roads running parallel to its lines.[60] Consequently, when the Transport Act 2000 required passenger transport executives to produce local transport plans, GMPTE's top public transport priority was a third phase of Metrolink expansion, which would create four new lines along key transport corridors in Greater Manchester: the Oldham and Rochdale Line (routed northeast to Oldham and Rochdale), the East Manchester Line (routed east to East Manchester and Ashton-under-Lyne), the South Manchester Line (routed southeast to Chorlton-cum-Hardy and East Didsbury), and the Airport Line (routed south to Wythenshawe and Manchester Airport).[68] The East Manchester Line would capitalise on serving the City of Manchester Stadium, a host venue of the 2002 Commonwealth Games.[69][70] Satisfied it would deliver a key policy commitment with faster expansion and greater value from economies of scale,[31][56] GMPTE and the Association of Greater Manchester Authorities (AGMA) lobbied central government to provide partial funding to upgrade the current network with a new depot, passenger information displays, and construct four new lines in a single Phase 3 contract (dubbed the "Big Bang") worth £489,000,000 (£1,039,600,000 as of 2024).[42][31][14][40][70][71][72]

Conceding that it would be "very difficult" to bring Metrolink to the City of Manchester Stadium by 2002, the Government accepted its importance to Greater Manchester and the Commonwealth Games on 22 March 2000, with an announcement from Deputy Prime Minister John Prescott that a £289,000,000 government contribution to fund Phase 3 would make Metrolink "the envy of Europe".[14][70][73] The remaining £200,000,000 was assembled from the private sector by July 2000.[31][70] Following the announcement, preparatory work such as legal costs, land acquisition and construction of rail bridges over the River Medlock was actioned.[72][73] However, Metrolink made a loss in 2002 and failed to reduce traffic congestion in Manchester city centre.[74] Costs for Phase 3 implementation were revised in the December after the 2002 Commonwealth Games, totalling £820,000,000 (£1,684,900,000 as of 2024),[42] meaning Metrolink required a Government contribution of at least £520,000,000.[65] With costs predicted to rise further, and concerns raised over light rail procurement nationally,[75] on 20 July 2004, Alistair Darling (the Secretary of State for Transport) announced the Government had withdrawn its share of funding Metrolink due to excessive costs.[65][72][76]

In response, highlighting the legal costs and demolition of homes, schools and offices in anticipation of the new lines,[72][73] the Get Our Metrolink Back on Track (or Back on Track )[71] campaign spearheaded by the Manchester Evening News and Members of Parliament from Greater Manchester was organised to lobby the Department for Transport to fund Phase 3.[77][75][72][78] On 16 December 2004 Alistair Darling announced that the government would fund Phase 3 – but not at any price, capping its investment for Metrolink enhancements at £520,000,000.[75][72] An initial £102,000,000 funding package was granted by the Government in July 2005 for Phase 3 preparatory work, and a Carillion-led track renewal programme for 12 miles (19 km) of Phase 1 line – still using original British Rail track – that was causing damage to vehicles and discomfort for passengers.[20] Following negotiations between central government and GMPTE and AGMA, Phase 3 funding was confirmed by Douglas Alexander on 6 July 2006,[72] albeit with adjustments (such as axing the Wythenshawe Loop)[79] and splitting the project into two stages: Phase 3a, elements of expansion funded by government investment; and Phase 3b, elements requiring an alternative funding source.[71][75] The MPact-Thales consortium, composed of Laing O'Rourke, VolkerRail and the Thales Group, was appointed to design, build and maintain the 20 miles (32 km) of new line plus a new depot at Old Trafford.[40][75] A 0.25-mile (0.40 km) spur off the Eccles Line to the new MediaCityUK development at Salford Quays, funded separately by the Northwest Regional Development Agency (NWRDA), would also fall to Mpact-Thales.[40][75][64]

Phase 3a

Testing on the East Manchester Line in November 2012
Shaw and Crompton Metrolink station on its opening day of 16 December 2012

Phase 3a, dubbed the "Mini Bang",[71] or "Little Bang",[80] was an extension scheme approved by the government on 6 July 2006, with final sign off and release of Treasury funds in May 2008.[64] In addition to the separately NWRDA-funded spur from the Eccles Line to MediaCityUK, Phase 3a involved converting the 14-mile (23 km) Oldham Loop heavy rail line from Victoria to Rochdale via Oldham, building a new 1.7-mile (2.7 km) South Manchester Line from Trafford Bar to St Werburgh's Road in Chorlton-cum-Hardy (on a closed section of Cheshire Lines Committee railway), and construction of a new 4-mile (6.4 km) East Manchester Line from Piccadilly to Droylsden.[20][64][71][81] The Oldham and Rochdale and South Manchester lines were funded by a £244,000,000 lump sum from the government.[64][71] The East Manchester Line to Droylsden was funded by borrowings by GMPTE that would be repaid over 30 years using fare revenue from Metrolink.[20]

The Oldham Loop Line, subsidised by GMPTE and used for suburban commuting, closed on 3 October 2009 allowing work to convert the line from heavy rail to Metrolink,[82][83] although preparatory work on Central Park Metrolink station and a flyover at Newton Heath over the heavy Caldervale Line commenced in 2005.[84] Conversion of the Oldham Loop for Metrolink allowed for the addition of new stops along the line, including Monsall, South Chadderton, and Newbold;[85] Kingsway Business Park Metrolink station was authorised at a late stage of planning in July 2011 once the Phase 3b-Drake Street Metrolink station was abandoned (on technical and economic grounds) and additional funding was procured from Rochdale Metropolitan Borough Council and Kingsway Business Park's private developer Wilson Bowden.[86]

The planned opening of Phase 3a services was initially delayed on each line by months due to faults with a new £22,000,000 digital signalling and control system known as the Tram Management System, or TMS, designed by the Thales Group.[87] Services on the spur from the Eccles Line to MediaCityUK Metrolink station were expected to commence during Summer 2010,[64] and began on 20 September 2010,[88] serving MediaCityUK, a 200-acre (81 ha) development for creative and digital mass media organisations,[75][64] and The Lowry, a combined theatre-gallery and Greater Manchester's most visited tourist attraction.[31][89] On its inauguration, TMS experienced several faults on the expanded Eccles Line, causing "chaos" at MediaCityUK, and 24 service delays on the network between September 2010 and February 2011.[87][90] On the South Manchester Line, services to St Werburgh's Road Metrolink station were expected to commence in Spring 2011,[64] but delayed until 7 July 2011, due to problems with TMS.[80][81] On the Oldham and Rochdale Line, services from Manchester to Central Park and Oldham Mumps were expected to open in spring 2011 and autumn 2011 respectively,[64][91] but problems with TMS and the need to renew structures delayed services until 13 June 2012, when 7.1 miles (11.4 km) of the line from Victoria to Oldham Mumps Metrolink station opened in a single stage.[85][92][93] After three months in operation, Metrolink services to Oldham were hailed a "huge success" by TfGM, with 250,000 passengers on the line between June and September,[78] strengthening TfGM's position that Phase 3a would raise daily ridership on Metrolink to 90,000.[64] Originally planned to open in spring 2012,[91] then delayed to autumn 2012,[94] a service on the Oldham and Rochdale Line from Oldham Mumps as far as Shaw and Crompton Metrolink station began on 16 December 2012.[95][96] In January 2013, a contract dispute between TfGM and Thales Group over missed deadlines and poor performance of TMS resulted in TfGM withholding payments for unfulfilled construction targets.[87] Services to Rochdale and Droylsden were scheduled for a spring 2012 opening date,[64][97] but delayed by months because of problems with the implementation of TMS, prompting outrage from Members of Parliament representing these areas.[98][99] The East Manchester Line to Droylsden opened to selected residents of Manchester and Tameside on 8 February 2013, and to the general public on 11 February 2013.[98][100] On 28 February 2013, passenger services expanded along the 4.6-mile (7.4 km) stretch of the Oldham and Rochdale Line between Shaw and Crompton and Rochdale railway station, completing Phase 3a, and giving Metrolink a total network length of 43 miles (69 km).[101][102] On 9 May 2013, TMS was successfully implemented in the City Zone, providing real-time passenger information displays at all stops in Manchester city centre.[103]

Phase 3b

Phase 3b was revealed in July 2006 when Phase 3 was split into two smaller phases.[104] A range of motivators pushed transport planners to pursue Phase 3b, including attracting new passengers, value to the economy, reduction of road traffic congestion, regeneration, and improved access to town centres, business districts and labour markets.[105] Under Phase 3b plans, Metrolink proposed to extend the East Manchester Line by 2.4 miles (3.9 km) from Droylsden to Ashton-under-Lyne;[106] extend the South Manchester Line by 2.7 miles (4.3 km) from St Werburgh's Road to Didsbury;[107] and create a new 9-mile (14 km) Airport Line to Manchester Airport from a junction at St Werburgh's Road.[108] Phase 3b enacted plans first drawn up in 1983, laid before Parliament in 1988, and approved by the government in 1991 to re-route and extend the Oldham and Rochdale Line at a cost of £124,500,000 with a street running route through Oldham and Rochdale town centres, both of which were poorly served by using the outlying Oldham Mumps and Rochdale railway stations alone.[104][109][85][110][111]

Tasked with procuring funds for Phase 3b from sources other than central Government, in July 2007 GMPTE and AGMA submitted a bid to the Transport Innovation Fund, which would release a multi-million pound sum for public transport improvements linked to viable anti-road traffic congestion strategies.[112][113] A referendum on the Greater Manchester Transport Innovation Fund was held in Greater Manchester on 19 December 2008,[114] in which 79% of voters rejected plans for public transport improvements linked to a peak-time weekday-only Greater Manchester congestion charge.[115] In May 2009, Greater Manchester Integrated Transport Authority (formerly GMPTA) and AGMA agreed to create the Greater Manchester Transport Fund, £1.5billion raised from a combination of a levy on council tax in Greater Manchester, government grants, contributions from the Manchester Airports Group, Metrolink fares and third-party funding for "major transport schemes" in the region.[116][110] Phase 3b was approved with funding on a line-by-line basis between March and August 2010.[106][110] Construction work for all Phase 3b lines began in March 2011.[117] On the Airport Line, a 580-tonne steel bridge was erected in Wythenshawe over the M56 motorway on 25 November 2012.[118] Following the closure of Mosley Street Metrolink station on 17 May 2013,[119] the 2.7-mile (4.3 km) route of the South Manchester Line from St Werburgh's Road to East Didsbury Metrolink station was the first section of Phase 3b line to open on 23 May 2013 - three months ahead of schedule.[107][120] The East Manchester Line was completed on 9 October 2013 with a new service routed 2.1 miles (3.4 km) between Droylsden and Ashton-under-Lyne Metrolink station, taking the total system length to 47.7 miles (76.8 km).[121][122][123] The Oldham and Rochdale Line was completed with a street-running service through Oldham Town Centre on 27 January 2014,[124] and the addition of a street-running service between Rochdale railway station and Rochdale Town Centre on 31 March 2014, taking the total system length to 48.5 miles (78.1 km).[8] TfGM forecasts that more than 45 million passenger journeys per year will be made on the 59-mile (95 km) Metrolink system once Phase 3b is completed in 2016.[20][101]

Phase 2CC

The Second City Crossing (also known as 2CC)[125] is a second Metrolink route across Manchester city centre, first proposed in 2011 as a means to improve capacity, flexibility and reliability as the rest of the system expands due to phases 3a and 3b.[3][125][126][64][127] Funded by the Greater Manchester Transport Fund, its 0.8-mile (1.3 km) route will begin at a rebuilt St Peter's Square Metrolink station, and run along Princess Street, Cross Street and Corporation Street to rejoin the existing Metrolink line by Victoria station.[126][128] Following the submission of a planning document under the Transport and Works Act 1992, and a public inquiry held throughout 2013,[128][129] the Second City Crossing was granted approval on 8 October 2013 by the Secretary of State for Transport, Patrick McLoughlin,[127][130] and signed off on 28 October 2013 by the Greater Manchester Combined Authority.[131] Construction is to commence in 2014, with Exchange Square Metrolink station joining the network as a new stop on the crossing; a Shaw and Crompton-to-Exchange Square service is to join the network in 2015 with completion of the scheme expected in 2016/17.[125][130][131]

Operator

Metrolink stops are marked with yellow totems, such as this one at MediaCityUK

Metrolink is run as a public-private partnership between TfGM and private transport firms.[31] Between 1992 and 2007 Metrolink was operated and maintained as a concession by Serco.[132] From 2007 until 2011 it was operated and maintained by Stagecoach Metrolink – part of the Stagecoach Group.[133][134] Metrolink RATP Dev, a part of the French state-owned RATP Group which operates the Paris Métro, bought the Metrolink contract from Stagecoach on 1 August 2011.[3][7][135]

Metrolink is headed by Peter Cushing, the Metrolink Director at TfGM.[4] Appointed by TfGM and the Greater Manchester Combined Authority, Cushing began his post on 4 February 2013, having previously been the Operations Director of Central Trains.[136] Cushing replaced Philip Purdy, who joined Metrolink in May 2008, having previously overseen the expansion of the Melbourne tramway network with Yarra Trams.[137][138]

Branding and public relations

The name Metrolink and a system-wide aquamarine, black and grey corporate branding and vehicle livery was devised by Fitch RS and Design Triangle,[139][140] and first revealed at a press launch in June 1988.[141][142] Previously, during the planning and promotional stages, the system was known as Project Light Rail, and borrowed an orange and brown identity used by Greater Manchester Transport and GM Buses.[143][18] In August 1991, in partnership with BBC Manchester, Metrolink ran a "Nickname Metrolink" competition to find an affectionate short name for the system, comparable to "The Tube" for London Underground and "The L" for the Chicago elevated transit system. Most submissions were inspired by textile manufacturing, Greater Manchester's historic staple industry, using names such as "The Thread" and "The Shuttle", but the winning entry was "The Met".[18] In 2008, a distinctive yellow and metallic silver vehicle livery, and corresponding yellow system-wide corporate re-branding was introduced by Manchester-based Hemisphere Design and Marketing Consultancy, designed in partnership with Peter Saville, Dalton Maag and Design Triangle.[40][144] Yellow was chosen by Hemisphere for its high visibility and to reflect Greater Manchester's culture of confidence and optimism.[138]

Metrolink has been a "Football Development Partner" with the Manchester Football Association since August 2010,[145] meaning it is the association's Official Travel Partner, and supports grassroots association football in Greater Manchester by selecting a "Team of the Month".[146] Metrolink is a sponsor of the annual Manchester Food and Drink Festival.[147] On 6 December 2010, to celebrate the soap opera's 50th anniversary, Coronation Street featured a storyline with an explosion which caused a crash on the Metrolink system at Weatherfield.[148] Although a fictitious event, at least six calls were made to GMPTE asking if services had been affected.[149]

Transport planners in Greater Manchester describe Metrolink as both "an icon of Greater Manchester",[150] and "an integral part of the landscape in Greater Manchester".[77] The Guardian describes Metrolink as "Manchester's efficient and much-loved tram system".[65] Under ownership of the Guardian Media Group, the Manchester Evening News spearheaded the Get Our Metrolink Back on Track campaign in 2004–05.[78] Under Trinity Mirror ownership, the Manchester Evening News used the Freedom of Information Act 2000 to reveal that Metrolink received over 10,000 complaints between May 2011 and May 2012.[151]

In 2013, Manchester City F.C. manager Roberto Mancini and players Joe Hart, Vincent Kompany and James Milner recorded special stop announcements to be used on Metrolink's East Manchester Line on dates when Manchester City play at home at the City of Manchester Stadium (served by the Etihad Campus Metrolink station). The announcements were first used on 17 February 2013, for Manchester City's Fifth Round Proper tie against Leeds United A.F.C. in the 2012–13 FA Cup.[152][153]

Infrastructure

Stations and lines

A map of Metrolink's lines (in black), superimposed upon Greater Manchester

As of April 2014, Metrolink has a network length of 48.5 miles (78.1 km),[8] and 77 stations – known as stops[154] — along six lines which radiate from a "central triangular junction at Piccadilly Gardens which forms the hub of the Metrolink system" in the City Zone.[155] The lines are: the Altrincham Line (which terminates in Altrincham), the Bury Line (which terminates in Bury), the East Manchester Line (which terminates in Ashton-under-Lyne), the South Manchester Line (which terminates in East Didsbury), the Eccles Line (which terminates in Eccles), and the Oldham and Rochdale Line (which terminates in Rochdale).[156] Some stops, such as Cornbrook, are shared between lines, and may be used as interchange stations;[156] others, such as Altrincham Interchange, are transport hubs which integrate with heavy rail and bus stations.[156] Each station has at least one high-floor platform measuring a minimum of 2 metres (6.6 ft) wide, accessed by ramp, stairs, escalator, lift or combination thereof.[3][157] Low-floor platforms commonly used for light rail throughout the world were ruled out for Metrolink because the system inherited 90-centimetre (35 in) high-floor platforms from British Rail on lines formerly used for heavy rail.[158] Shelters and canopies at stations were supplied by JCDecaux,[157] and ticket vending machines by Scheidt & Bachmann.[159] There are up to five ticket vending machines at each stop.[159] Each line has track with standard gauge specification, powering vehicles electrically from 750 V DC overhead lines.[160] Between 1992 and 2007, electricity for the Metrolink system was procured by the operator, based on price only.[12] In 2007, GMPTE changed the contractual requirements to ensure that sustainable power would be factored into choosing an energy supplier, and in July 2007, Metrolink became the first light rail network in the UK with electricity supplied entirely from sustainable energy via hydropower.[12]

Metrolink lines
Line name Inaugural service Number of
open stations
Length
Altrincham Line 15 June 1992[46] 10[156] 7.6 miles (12.2 km)[34]
Bury Line 6 April 1992[46] 10[156] 9.9 miles (15.9 km)[34]
City Zone 27 April 1992[46] 8[156] 1.5 miles (2.4 km)[34]
East Manchester Line 11 February 2013[note 2] 11[156] 6 miles (9.7 km)[100][123][161]
Eccles Line 6 December 1999[56] 11[156] 4 miles (6.4 km)[162]
Oldham and Rochdale Line 13 June 2012[85] 19[156] 14.8 miles (23.8 km)[91][8]
South Manchester Line 7 July 2011[80][81] 8[156] 4.4 miles (7.1 km)[150][107]

Rolling stock

St Peter's Square Metrolink station, with both a modern M5000 vehicle (pictured right) and an older T-68 (pictured left)

For passenger services, Metrolink uses a fleet of specially designed articulated vehicles exclusively composed of Bombardier Flexity Swift M5000s, first introduced in 2009.[163] These were preceded by Ansaldo Firema T-68/T-68As,[164][165] which were retired in February 2014 and April 2014 respectively.[166] These vehicles were originally termed LRVs (light rail vehicles),[18] but are now widely known as trams.[19] Both varieties are bi-directional, designed to be driven by a single driver from either end in a cab separate from passengers.[165][167]

The T-68s were Metrolink's original passenger fleet. They were in passenger service from the opening of Metrolink in 1992, and were phased out between April 2012 and February 2014.[168] They were 29 metres (95 ft) in length by 2.65 metres (8.7 ft) wide, weigh 48 long tons (54 short tons) and have a top speed of 50 miles per hour (80 km/h).[169][170][171] The nominal capacity of each T-68 was 201 passengers, of whom 86 are seated; the maximum crush load capacity is 270 passengers.[172] Each unit was given a number from 1001 through to 1026;[164][171] number 1000 was given to a half length mockup displayed to the public before opening, and now exhibited at the Greater Manchester Museum of Transport.[164] Each T-68 was also to have a nickname referencing the personalities, history and culture of Greater Manchester as chosen by the public. The names chosen in 1987 were Sylvia Pankhurst, Sir Matt Busby, Ben Brierley, The Lancashire Fusilier, Sir John Barbirolli, Pat Seed, John Greenwood, Squire Clark, Our Gracie, and C. P. Scott. Despite assurances they would all be applied, few were ever used,[141] with a sponsorship naming scheme (to provide additional income for Metrolink) taking preference (for example, vehicle 1002 was named the "Manchester Arndale Voyager" to promote Manchester Arndale and its Voyager food court).[173]

In 1999, Metrolink's passenger fleet was bolstered by six new vehicles to run on the Eccles Line.[64] Numbered 2001 through to 2006, these T-68A vehicles were based on the original T-68s, but had modifications replacing destination rollblinds with dot matrix displays, and retractable couplers and covered bogies necessary for the high proportion of on-street running close to motor traffic.[64] Three of the earlier T-68 fleet were similarly equipped,[64] and were known as T-68Ms.[174] Mechanically and electrically the T-68M vehicles remained essentially a T-68, but had modifications to its brakes, mirrors, and speed limiters to suit the Eccles Line.[174] Initially only these vehicles were permitted to operate the Eccles line but the entire fleet was modified between 2008 and 2012 for universal running,[64] under a program known as the T-68X Universal Running programme.[175] The T-68As were retired on 30 April 2014.[166]

Built by Bombardier Transportation and Vossloh Kiepe, and costing £2,000,000 each, the M5000 vehicles were introduced to Metrolink in December 2009, driven by increased passenger demand.[64] They are part of the Flexity Swift range of light rail vehicles, and have a design similar to the K5000 vehicle used on the Cologne Stadtbahn,[20][64] in a yellow and silver livery.[50][163][176] Originally eight M5000s were planned to provide additional capacity, which increased to 12 with the approval of the spur to MediaCityUK.[64] A total of 94 M5000s were procured by TfGM for the phase 3 extensions and fleet replacement.[50][177] They will be given fleet numbers from 3001 to 3094. Built to the requirements of the 2010 Rail Vehicle Accessibility Regulations, the nominal capacity of each M5000 is 206 passengers, of whom 52–60 are seated.[178][179] In July 2012, TfGM announced that the Greater Manchester Combined Authority had agreed that all T-68s and T-68As would be retired and replaced by M5000 vehicles, which are lighter, quieter, more energy-efficient and four times more reliable than the older T-68 models.[50][177] This replacement plan would provide Metrolink with a uniform fleet by 2014.[50] In October 2013, the authority agreed to procure a further ten M5000s in 2014 to facilitate the construction of the proposed Trafford Park line, while in the interim supporting a service between MediaCityUK and Manchester city centre.[131] A press release from Bombardier, dated 20 December 2013, stated that Metrolink had ordered a further ten vehicles.[180] The M5000s became the exclusive passenger vehicle of Metrolink on 1 May 2014.[166]

Metrolink has one Special Purpose Vehicle (SPV) from 1991.[173] It is numbered 1027 and its wagon numbered 1028. It is a bespoke diesel-powered vehicle with a crane, inspection platform, mobile workshop, and capacity for a driver and three passengers.[173] It was designed to assist with vehicle recovery and track and line repairs.[173]

Depots

Metrolink House at Queens Road in Cheetham Hill is the headquarters of Metrolink.[6] Constructed during Phase 1, it served jointly as a control centre, HQ, office space, and depot for the storage, maintenance and repair of vehicles.[6] Under the original proposals, Metrolink House was much larger, with a design which would support network expansion, but this design did not obtain the necessary planning permission from Manchester City Council.[6] Consequently, Metrolink House was scaled down to a 4-hectare (9.9-acre) £8,000,000 site with finite capacity,[6][181] and, in light of Phase 3a network expansion, Metrolink built a second depot at Elsinore Road in Old Trafford in 2011.[182][150] This second depot occupies the site of a former warehouse, and can house up to 96 vehicles.[150] On 7 May 2013 Metrolink completed the transfer of its main operational functions from Cheetham Hill to Old Trafford, meaning its control room – known as the Network Management Centre – is housed jointly with the Customer Services team by its newer depot.[183]

Wi-Fi

In July 2013, the Transport for Greater Manchester Committee announced that it planned to enhance the experience of travelling on Metrolink by tapping in to Manchester City Council's grant from the UK Urban Broadband Fund and using it to provide Metrolink passengers with free Wi-Fi when on board. The scheme began with a trial on a single tram - number 3054 - connected to the FreeBeeMcr broadband network with the intention of rolling it out across the whole Metrolink network by Spring 2015.[184][185]

Proposed changes and expansion

Change Description
Buckley Wells Buckley Wells Metrolink station has been proposed to provide better passenger access in southern Bury, and would be located on the Bury Line between Bury Interchange and Radcliffe Metrolink station.[64]
Middleton extension As of 2013, Rochdale Metropolitan Borough Council aspires to link Middleton to the Metrolink network by constructing a branch off the Bury Line routed from Bowker Vale Metrolink station to Middleton town centre.[186] Rochdale Council first proposed this extension of Metrolink to Middleton in 2008, and priced the scheme at £80,000,000.[187]
Salford expansion In its 2004–2016 unitary development plan, Salford City Council proposed expansion of Metrolink beyond Eccles Interchange along the A57 road to Barton-upon-Irwell and then across the Manchester Ship Canal to the Trafford Centre.[188] The council endorsed re-opening the Tyldesley Loopline from Eccles to Little Hulton via Walkden with Metrolink services.[188] The council also endorsed the exploration of tram-train provision between Manchester and Wigan via Salford, as proposed by the Regional Spatial Strategy for North West England.[188]
Stalybridge extension As of 2011, Tameside Metropolitan Borough Council aspires to extend the East Manchester Line from Ashton-under-Lyne to Stalybridge.[189]
Stockport extension A Metrolink line running from Manchester city centre to Stockport is "a priority major scheme for Greater Manchester".[64][68] An application to construct this line via East Didsbury Metrolink station was submitted in 2001, but did not reach conclusion at the Department for Transport.[68] TfGM has committed to bringing Metrolink to Stockport by extending the South Manchester Line from East Didsbury, and plans to investigate funding possibilities after the completion of Phase 3b.[68]
Trafford Park line TfGM holds powers to commission a new line from Pomona Metrolink station to Port Salford via Trafford Park and the Trafford Centre,[31] and committed to procuring a funding mechanism for its construction in 2011.[68][190] Drawing on proposals made by Trafford Metropolitan Borough Council in 1984,[191] TfGM made this a strategic priority in each of its local transport plans since the Transport Act 2000, attesting that Metrolink provision will improve public access to key attractions, support the development of business and freight zones, and reduce traffic congestion on the M60 motorway.[190] In 2004, Peel Holdings raised concerns that the lack of Metrolink provision to the Trafford Centre may impact on its Chill Factore development, and offered to contribute towards its cost.[3][192] In summer 2013, the Greater Manchester Combined Authority and the Greater Manchester Local Enterprise Partnership announced it may fund the construction of the line as far as a stop at the Trafford Centre using the Earnback mechanism of the Greater Manchester City Deal;[193] with an extension to Port Salford and Eccles to be developed and costed separately.[131][194] TfGM estimated that it would require £350,000,000 to open this route to passengers by its target of 2018/19 (subject to a satisfactory business case, Transport and Works Act Order and public consultation).[194]
Tram-trains Metrolink and the TfGM Committee have prepared five costed proposals for extending Metrolink using tram-train technology over the existing heavy rail network in the region; along the Mid-Cheshire Line (between Stockport and Hale), the Hope Valley Line (between Manchester and Marple), the Glossop Line (between Manchester and the dual termini at Hadfield and Glossop), the Manchester to Sheffield Line (between Manchester and Hazel Grove), and along the Manchester to Southport Line (between Manchester and Wigan via Atherton), with an estimated total funding requirement of £870 million as of 2013.[195] TfGM intend to proceed to the identification of potential rail industry funding options, subject to a review of lessons from a tram-train pilot scheme in Sheffield.[196]
Wythenshawe Loop Although axed in 2005 to control costs, the Wythenshawe Loop on the Airport Line remains an aspiration of TfGM.[75] It would create a loop from Roundthorn Metrolink station to the University Hospital of South Manchester and Newall Green and back to Roundthorn, and improve access between Wythenshawe and Manchester city centre on a route which is physically impaired by the River Mersey and M60 motorway.[20][64]

Travelling

Service and hours of operation

Before inauguration, GMPTE's original concept was for Metrolink's operator to provide a service every ten minutes from Bury-to-Piccadilly and Altrincham-to-Piccadilly Template:FormatTime, Monday to Saturday.[197] Greater Manchester Metrolink Limited, the system's original operator, argued for adjustments, citing the need to provide an efficient and commercially viable operation in line with vehicle running times and passenger demand.[197] Due to power limitations, this pattern was modified to a twelve-minute service throughout the day, doubling to a six-minute service in peak periods, resulting in a "ten trams per hour" service pattern on routes running from Altrincham and Bury to Manchester every six minutes.[197] Operators are required to provide this level of service at least 98% of the time, or incur a financial penalty charge.[198] This six-minute service pattern has been adopted on the rest of the network as the system has grown.[101][199][200] Heavy snowfall during the winter of 2009/10 impaired Metrolink services and the operator was criticised for failing to have cold weather procedures.[135] This prompted a program to improve reliability and performance of the system in freezing conditions.[135][201] Metrolink operated icebreaker-style vehicles at night during snowfall in January 2013 to provide normal services.[202]

A survey in 2012 revealed that passengers who used Metrolink everyday for commuting rated service levels as poor and/or unreliable, with those respondents particularly frustrated by delays and disruptions.[203] TfGM recognised that the older vehicles in its fleet – the T68/T68As — are outdated and the cause of much disruption, and agreed to replace them with M5000s by 2014.[50][177] Among those who used Metrolink less regularly, the system scored far better in the survey.[203] A survey in 2014 by the non-departmental government body Passenger Focus found that of the five major light rail systems in the United Kingdom - Metrolink, Sheffield Supertram, NET, Midland Metro and Blackpool tramway - Metrolink had the lowest overall satisfaction rating in the United Kingdom. Respondents were surveyed on value for money, punctuality, seating availability, tram stations and overall satisfaction. Metrolink was below average on all criteria, and 47% believed Metrolink was value for money compared to a national average of 60%.[204]

Metrolink service routes[156]
Map of Greater Manchester overlaid with Metrolink's service routes in colour. Line termini and Manchester's two main stations are labelled.
Altrincham – Bury Altrincham – Piccadilly Bury – Ashton-under-Lyne
East Didsbury – Rochdale Town Centre Eccles – Piccadilly MediaCityUK – Cornbrook

Monday to Saturday service:[199][200]

The combined Monday-Saturday daytime frequency on the Bury and Altrincham routes is every 6 minutes.

Sunday and public holiday service:[199][200]

Ticketing

A Metrolink ticket vending machine at Stretford Metrolink station.

Metrolink fares were originally set by the system's operator,[197] but are now set by the TfGM Committee at levels that cover both the running costs and the cost of borrowing that has part-funded the expansion of the system;[205] Metrolink receives no public subsidy.[203][206] Fares typically rise each January above the rate of inflation.[207][208] The fare tariff is based on a division of the network's stations into fare zones.[209] Persons under 16 years of age, persons of pensionable age, and people with disabilities qualify for concessionary fares, some of which are mandatory and others discretionary, as determined by the Greater Manchester Combined Authority.[205] The Greater Manchester Combined Authority permits reduced fares for persons under 16 years of age, and free or reduced fares on Metrolink after Template:FormatTime for pensioners.[205] In normal circumstances, tickets cannot be purchased on board Metrolink vehicles, and must be purchased from a ticket vending machine before boarding the vehicle.[210] Fare evasion in 2006 was estimated at 2–6% of all users,[211] and in 2012 at 2.5% of all users.[212] Checking tickets and passes and issuing penalty fares is the responsibility of Metrolink's Passenger Services Representatives (PSRs), who provide security and assistance on the network;[213][212] between 1992 and 2008, Greater Manchester Police had a dedicated Metrolink unit responsible for policing the system.[214] The original ticket vending machines were designed by Thorn EMI.[209] In 2005 GMPTE announced that rail passengers travelling from within Greater Manchester into Manchester city centre can use the Metrolink service between the eight City Zone stations for free.[215] Passengers must present a valid rail ticket, correctly dated with Manchester Ctlz as the destination.[216][217] In 2007 TfGM rolled out new ticket vending machines, designed to accept credit/debit card payments and permit the purchase of multiple tickets in a single transaction.[218] These were replaced in 2009 with touchscreen machines, designed with the Scheidt & Bachmann Ticket XPress system.[159] In October 2012, TfGM announced it was devising a simpler zonal fare system, comparable to London fare zones, and preparing to introduce Get Me There, the region's new contactless smartcard, for use on all public transport modes in Greater Manchester, including Metrolink.[207]

Patronage

According to TfGM, more than 21 million passenger journeys were made in 2011,[150][219] and the Department for Transport placed passenger journeys for the 2011/12 fiscal year at 21.8 million.[52] Patronage has risen steadily since its opening, from a start-point of 8.1 million in the 1992/93 fiscal year.[52] Travel increased from 18.2 million journeys in 2001/02 to 20 million journeys in 2008/09; numbers fell to 18.7 million in 2009 while parts of the system were closed for upgrades, but recovered[220] to 19.6 million for the 2009/10 fiscal year.[52] Metrolink revised its method for calculating passenger boardings in 2010/11, meaning figures are not directly comparable with previous years.[52] TfGM predicts around 22 million passenger journeys on Metrolink in 2012,[151] and an increase of 46% by 2026.[3]

colspan="12" style="background:#Template:MML color; color:black;"|Estimated passenger journeys made on Metrolink per fiscal year
style="background:#Template:MML color; color:black;"|Year style="background:#Template:MML color; color:black;"|Passenger journeys style="background:#Template:MML color; color:black;"|Year style="background:#Template:MML color; color:black;"|Passenger journeys style="background:#Template:MML color; color:black;"|Year style="background:#Template:MML color; color:black;"|Passenger journeys
1992/93 8.1m 1999/00 14.2m 2006/07 19.8m
1993/94 11.3m 2000/01 17.2m 2007/08 20.0m
1994/95 12.3m 2001/02 18.2m 2008/09 21.1m
1995/96 12.6m 2002/03 18.8m 2009/10 19.6m
1996/97 13.4m 2003/04 18.9m 2010/11 19.2m
1997/98 13.8m 2004/05 19.7m 2011/12 21.8m
1998/99 13.2m 2005/06 19.9m 2012/13 25.0m
Estimates provided by TfGM to the Department for Transport,[2] based on sales from ticket machines.[note 3]

A survey in 2012 revealed that 12%, or around one in 10 people in Greater Manchester use Metrolink to travel to work, and 8% use the system every day.[203] The system is most commonly used by 21 to 30-year olds, and was used most markedly by residents of the Metropolitan Borough of Bury — accounting for around a third of their commuter journeys.[203]

See also

Notes

  1. ^ The system is branded Metrolink.[10][11][12] The Department for Transport refers to the system as Manchester Metrolink,[2] an alternative unofficial name.[13][14] It is defined in Acts of Parliament and Byelaws as the Greater Manchester Light Rapid Transit System;[11][12] and sometimes (unofficially) called Greater Manchester Metrolink.[15]
  2. ^ The East Manchester Line opened to the general public on 11 February 2013.[161] It opened to invited residents of Tameside and Manchester along the route of the track on 8 February 2013 with free travel as a "gesture of thanks" for patience shown during disruptive construction works.[100]
  3. ^ Estimates excludes free travel such as Concessionary Bus Pass for pensioners and tickets sold through other vendors.[52]

References

  1. ^ "World Systems List index#GB". Light Rail Transit Association.
  2. ^ a b c d e f "Light Rail and Tram Statistics: England 2012/13" (PDF). Department for Transport. 18 June 2013. Retrieved 11 July 2013.
  3. ^ a b c d e f g h i "Salford Infrastructure Delivery Plan" (PDF). Salford City Council. February 2012. Retrieved 22 January 2013.
  4. ^ a b "Peter Cushing to take over as Metrolink boss". Salford Online. 29 January 2013. Retrieved 29 January 2013.
  5. ^ Coward & Henderson 2014, p. 7.
  6. ^ a b c d e Holt 1992, p. 79.
  7. ^ a b c "RATP buys Manchester Metrolink operator". Railway Gazette International. London. 2 August 2011.
  8. ^ a b c d e Scheerhout, John (31 March 2014). "Passenger trams start running to and from Rochdale town centre for first time in 80 years". Manchester Evening News. Retrieved 31 March 2014.
  9. ^ a b Ogden & Senior 1992, p. 107.
  10. ^ a b c Ogden & Senior 1992, p. 4.
  11. ^ a b Department for Transport (2009). "Explanatory Memorandum to the Greater Manchester (Light Rapid Transit System) (Exemptions) Order 2009". legislation.gov.uk. Retrieved 19 January 2013. The Order grants exemptions from certain requirements of railways legislation currently applying to the Greater Manchester Light Rapid Transit System ("Metrolink") ...
  12. ^ a b c d Slatcher, Adrian (17 December 2010). "Procurement of hydro-electricity for Metrolink – the Greater Manchester light rapid transit system". Manchester: Energy Planning Knowledge Base. Retrieved 19 January 2013. GMPTE own the Greater Manchester light rapid transit system – known as Metrolink.
  13. ^ Ogden & Senior 1992, p. 106.
  14. ^ a b c "£500m tram extension unveiled". BBC News. 22 March 2000. Retrieved 5 January 2013.
  15. ^ Ogden & Senior 1992, p. 39.
  16. ^ a b c d Holt 1992, pp. 6–7.
  17. ^ "Manchester Metrolink, United Kingdom". Railway Technology. 2010. Retrieved 12 July 2013.
  18. ^ a b c d Holt 1992, p. 30.
  19. ^ a b c d e f g h Kingsley, Nick (19 October 2007). "Manchester plays catch-up with Metrolink expansion". Railway Gazette International. London. Retrieved 12 January 2013.
  20. ^ a b c Williams 2003, p. 273.
  21. ^ a b Holt 1992, p. 4.
  22. ^ Ogden & Senior 1992, p. 21.
  23. ^ a b c d e Ogden & Senior 1992, p. 22.
  24. ^ a b "Manchester unearths forgotten 1970s tube line". The Architects' Journal. London. 13 March 2012.
  25. ^ a b Holt 1992, p. 5.
  26. ^ Donald, Cross & Bristow 1983, p. 45.
  27. ^ Ogden & Senior 1992, pp. 26–27.
  28. ^ Ogden & Senior 1992, p. 25.
  29. ^ Ogden & Senior 1992, p. 37.
  30. ^ a b c d e f g h i j k l m n o p GMPTE 2000. sfn error: multiple targets (2×): CITEREFGMPTE2000 (help)
  31. ^ Ogden & Senior 1992, p. 74.
  32. ^ a b Ogden & Senior 1991, p. 17.
  33. ^ a b c d Ogden & Senior 1992, p. 73.
  34. ^ Ogden & Senior 1992, p. 56.
  35. ^ Ogden & Senior 1991, pp. 14–15.
  36. ^ Ogden & Senior 1992, pp. 30–31.
  37. ^ Ogden & Senior 1992, p. 51.
  38. ^ a b Ogden & Senior 1992, p. 47.
  39. ^ a b c d e f g h i j Kessell, Clive (30 November 2011). "Manchester Metrolink 20 Years of Evolution". The Rail Engineer. Retrieved 2 January 2013.
  40. ^ Holt 1992, p. 94.
  41. ^ a b c d e UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 7 May 2024.
  42. ^ Ogden & Senior 1991, p. 53.
  43. ^ Holt 1992, p. 87.
  44. ^ Ogden & Senior 1992, p. 82.
  45. ^ a b c d e f g Holt 1992, p. 90.
  46. ^ "The History of Tramways and Evolution of Light Rail". Light Rail Transit Association.
  47. ^ Ogden & Senior 1992, p. 147.
  48. ^ a b c GMPTE 2003, p. 9.
  49. ^ a b c d e f "Manchester's oldest Metrolink trams to be replaced". BBC News. 17 July 2012. Retrieved 20 January 2013.
  50. ^ Ogden & Senior 1992, p. 13.
  51. ^ a b c d e f "Light rail and tram statistics: 2011/12". Department for Transport. 19 July 2012. Light rail and tram statistics 2011/12 and XLS tables (Table LRT0101). Retrieved 18 January 2013.
  52. ^ Williams 2003, pp. 276–277.
  53. ^ Williams 2003, p. 290.
  54. ^ Hall, J.R. (November 1995). "Design, build, operate and maintain contract as applied to Manchester's Metrolink". Proceedings of the Institution of Civil Engineers: Transport. 111 (4). Thomas Telford: 310–313. doi:10.1680/itran.1995.28033. ISSN 0965-092X.
  55. ^ a b c d GMPTE 2003, p. 13.
  56. ^ a b Ogden & Senior 1991, p. 63.
  57. ^ a b Ogden & Senior 1992, p. 91.
  58. ^ Williams 2003, p. 275.
  59. ^ a b c Docherty & Shaw 2011.
  60. ^ Ogden & Senior 1992, p. 148.
  61. ^ "Salford Quays Milestones: The Story of Salford Quays" (PDF). Salford City Council. 2008. Retrieved 3 January 2013.
  62. ^ a b c d GMPTE 2003, p. 10.
  63. ^ a b c d e f g h i j k l m n o p q r s t u v "Manchester Metrolink, United Kingdom". railway-technology.com. Retrieved 10 January 2013.
  64. ^ a b c d Ward, David (2 August 2004). "Tram fury rattles ministers". The Guardian. London. Retrieved 5 January 2013.
  65. ^ "Whistle-stop Princess takes home hat souvenir". Manchester Evening News. 9 January 2001. Retrieved 8 January 2013.
  66. ^ "More money for UK light rail". Railway Gazette International. London. 1 January 2003. Retrieved 13 January 2013.
  67. ^ a b c d e "Greater Manchester Local Transport Plan 2" (PDF). Greater Manchester Passenger Transport Authority. March 2006. Retrieved 5 January 2013.
  68. ^ GMPTE (2000). "Metrolink is coming ..." (PDF) (Press release). Manchester: GMPTE Promotions. Retrieved 15 January 2013.
  69. ^ a b c d "£289m for Metrolink 'Big Bang'". Manchester Evening News. 22 March 2000. Retrieved 5 January 2013.
  70. ^ a b c d e f "Metrolink: back on track?". BBC News. 13 May 2009. Retrieved 19 January 2013.
  71. ^ a b c d e f g "Metrolink extension is announced". BBC News. 6 July 2006. Retrieved 7 January 2013.
  72. ^ a b c Satchell, Clarissa (17 November 2005). "Bring on the Metro, urges bridge boss". Manchester Evening News. Retrieved 19 January 2013.
  73. ^ "Trams fail to cut jams". Manchester Evening News. 23 April 2004. Retrieved 19 January 2013.
  74. ^ a b c d e f g h TfGM & GMCA 2011, p. 80.
  75. ^ "Government scraps trams extension". BBC News. 20 July 2004. Retrieved 19 January 2013.
  76. ^ a b Satchell, Clarissa (6 September 2004). "Moving plea to save Metrolink". Manchester Evening News. Retrieved 19 January 2013.
  77. ^ a b c "Oldham Metrolink line a huge success with 250,000 passengers in first three months". Manchester Evening News. 15 September 2012. Retrieved 8 January 2013.
  78. ^ "Metrolink 'to axe hospital route'". BBC News. 22 June 2005. Retrieved 19 January 2013.
  79. ^ a b c "On track at last: Commuters travel on new Metrolink tram service to south Manchester for first time". Manchester Evening News. 7 July 2012.
  80. ^ a b c "First line opens under £1·4bn Manchester tram expansion". Railway Gazette International. London. 8 July 2011. Retrieved 19 January 2013.
  81. ^ Kirby, Dean (1 October 2009). "Signalman reaches end of line". Manchester Evening News. Retrieved 5 October 2009.
  82. ^ "End of era as loop line is replaced". Manchester Evening News. 26 September 2008. Retrieved 5 October 2009.
  83. ^ Satchell, Clarissa (6 April 2005). "Tram interchange gets £36m go-ahead". Manchester Evening News. Retrieved 19 January 2013.
  84. ^ a b c d "Metrolink trams reach Oldham Mumps". Railway Gazette International. London. 13 June 2012. Retrieved 13 January 2013.
  85. ^ Jones, Chris (27 July 2011). "Kingsway developers to foot the bill for Metrolink tram stop". Manchester Evening News. Retrieved 19 January 2013.
  86. ^ a b c Kirby, Dean (3 January 2013). "Metrolink tram bosses and signalling firm in court battle that could cost Greater Manchester taxpayers £42m". Manchester Evening News.
  87. ^ "Metrolink trams pull in to MediaCityUK station for first time". Manchester Evening News. 20 September 2010. Retrieved 25 September 2010.
  88. ^ Brooks-Pollock, Tom (30 November 2011). "Lowry gallery and theatre is most popular tourist attraction in Greater Manchester". Manchester Evening News. Retrieved 1 December 2011.
  89. ^ Kirby, Dean (27 June 2011). "Rush-hour chaos for tram commuters after Metrolink computer breakdown". Manchester Evening News. Retrieved 19 January 2013.
  90. ^ a b c GMPTE 2010, p. 7.
  91. ^ "New tram operating system delays Metrolink extension". BBC News. 9 December 2011. Retrieved 19 January 2013.
  92. ^ Kirby, Dean (8 June 2012). "Metrolink Oldham line set to open next Wednesday". Manchester Evening News. Retrieved 11 January 2013.
  93. ^ Rudkin, Andrew; Korn, Helen (8 October 2012). "Metrolink opening date remains vague". Oldham Evening Chronicle. Retrieved 11 January 2013.
  94. ^ Kirby, Dean (12 December 2012). "Shaw and Crompton Metrolink trams start this Sunday". Manchester Evening News. Retrieved 12 December 2012.
  95. ^ "Metrolink stations 'to boost two Greater Manchester areas'". BBC News. 16 December 2012. Retrieved 16 December 2012.
  96. ^ GMPTE 2010, pp. 4–7.
  97. ^ a b Kirby, Dean (4 December 2012). "Opening of Metrolink tram service to Droylsden delayed until February 2013". Manchester Evening News. Retrieved 11 January 2013.
  98. ^ Kirby, Dean (4 January 2013). "MPs slam delays to new Metrolink lines to Rochdale and Droylsden". Manchester Evening News. Retrieved 19 January 2013.
  99. ^ a b c "It's the final countdown" (Press release). Transport for Greater Manchester. 1 February 2013. Retrieved 1 February 2013.
  100. ^ a b c "Next stop: Rochdale!" (Press release). Transport for Greater Manchester. 20 February 2013. Retrieved 20 February 2013.
  101. ^ "Next stop: Rochdale!". Rochdale Online. 20 February 2013. Retrieved 20 February 2013.
  102. ^ "Real-time tram information for city centre passengers". Transport for Greater Manchester. 9 May 2013. Retrieved 11 July 2013.
  103. ^ a b Young 2008, p. 163.
  104. ^ TfGM & GMCA 2011, p. 45.
  105. ^ a b "Ashton and Didsbury Metrolink extensions funded". Railway Gazette International. London. 8 March 2010. Retrieved 20 January 2013.
  106. ^ a b c Kirby, Dean (14 May 2013). "Metrolink extension to East Didsbury to open next week- three months early". Manchester Evening News. Retrieved 14 May 2013.
  107. ^ "Manchester Metrolink starts Phase 3b". Railway Gazette International. London. 22 March 2011. Retrieved 20 January 2013.
  108. ^ Holt 1992, pp. 92–93.
  109. ^ a b c "Manchester Metrolink Phase 3b confirmed". Railway Gazette International. London. 5 August 2010. Retrieved 19 January 2013.
  110. ^ "Bringing Metrolink to Oldham and Rochdale" (PDF). Greater Manchester Passenger Transport Authority. 2000. Retrieved 15 January 2013.
  111. ^ Young 2008, p. 160.
  112. ^ "The Link" (PDF). Transport for Greater Manchester. 2008. Retrieved 15 January 2013.
  113. ^ "Date set for C-charge referendum". BBC News. 29 September 2008. Retrieved 5 January 2010.
  114. ^ Sturcke, James (12 December 2008). "Manchester says no to congestion charging". The Guardian. London. Retrieved 12 December 2008.
  115. ^ TfGM 2012, p. 14.
  116. ^ "Manchester Metrolink starts Phase 3b". Railway Gazette International. London. 22 March 2011. Retrieved 19 January 2013.
  117. ^ Britton, Paul (25 November 2012). "Giant construction project to position 580-tonne bridge over M56 completed eight hours early". Manchester Evening News. Retrieved 16 February 2013.
  118. ^ Kirby, Dean (12 May 2013). "Manchester city centre tram stop reaches the end of the line". Manchester Evening News. Retrieved 17 May 2013.
  119. ^ Kirby, Dean (22 May 2013). "Destination Didsbury – Metrolink trams to start tomorrow, three months early". Manchester Evening News. Retrieved 22 May 2013.
  120. ^ "New Metrolink service to Ashton opens" (Press release). Transport for Greater Manchester. 9 October 2013. Retrieved 9 October 2013.
  121. ^ Kent-Smith, Emily (9 October 2013). "Metrolink tram service launches from Ashton-under-Lyne... and it's on time". Manchester Evening News. Retrieved 9 October 2013.
  122. ^ a b Britton, Paul (28 September 2013). "Metrolink service to Ashton-under-Lyne to start on October 9". Manchester Evening News. Retrieved 9 October 2013.
  123. ^ Flanagan, Emma (27 January 2014). "Landmarks on the new Oldham Metrolink line, and a driver's eye view tour of the route". Manchester Evening News. Retrieved 31 March 2014.
  124. ^ a b c "Metrolink second city crossing 'vital' for Manchester". BBC News. 8 June 2011. Retrieved 7 January 2013.
  125. ^ a b TfGM & GMCA 2011, p. 84.
  126. ^ a b "Ministers clear way for second city centre Metrolink line". Place North West. 7 October 2013. Retrieved 7 October 2013.
  127. ^ a b Qureshi, Yakub (23 January 2013). "New city line is 'vital for future of Metrolink'". Manchester Evening News. Retrieved 23 January 2013.
  128. ^ Kirby, Dean (22 January 2013). "Cross-city Metrolink idea on the line as tram inquiry launched". Manchester Evening News. Retrieved 23 January 2013.
  129. ^ a b "Manchester city centre tram route's green light by Government". BBC News. 8 October 2013. Retrieved 8 October 2013.
  130. ^ a b c d Williams, Jennifer (28 October 2013). "Second cross-city tram link gets green light". Manchester Evening News. Retrieved 28 October 2013. {{cite news}}: Cite has empty unknown parameter: |1= (help)
  131. ^ Kirby, Dean (2 August 2011). "Stagecoach hand over control of Metrolink system to French firm RATP". Manchester Evening News.
  132. ^ "Stagecoach signs Manchester Metrolink contract" (Press release). Stagecoach Group. 29 May 2007. Retrieved 28 December 2008.
  133. ^ "Stagecoach take over tram service". BBC News. 15 July 2007. Retrieved 1 November 2008.
  134. ^ a b c "Metrolink firm slammed over 'unacceptable' service". Manchester Evening News. 8 November 2011. Retrieved 23 January 2013.
  135. ^ Kirby, Dean (30 January 2013). "New Metrolink boss arrives on schedule". Manchester Evening News. Retrieved 1 February 2013.
  136. ^ "Tram expert's global job switch". BBC News. 13 May 2008. Retrieved 20 January 2013.
  137. ^ a b GMPTE 2009, p. 3.
  138. ^ Ogden & Senior 1991, p. 42.
  139. ^ Ogden & Senior 1992, p. 143.
  140. ^ a b Holt 1992, pp. 26–27.
  141. ^ GMPTE 2003, p. 4.
  142. ^ Holt 1992, p. 24.
  143. ^ Donohue, Simon (14 October 2008). "Tram design on the right track". Manchester Evening News. Retrieved 19 January 2013.
  144. ^ "Metrolink". Manchester Football Association. Retrieved 19 January 2013.
  145. ^ "Team of the month: Swinton FC". Manchester Evening News. 3 October 2012. Retrieved 19 January 2013.
  146. ^ Bainbridge, Pete (17 September 2010). "Metrolink offers travel pass for Food and Drink Festival". Manchester Evening News. Retrieved 19 January 2013.
  147. ^ "Coronation Street tram crash pulls in 13m viewers". BBC News. 7 December 2010. Retrieved 23 January 2013.
  148. ^ Kirby, Dean (8 December 2010). "Are the trams still running?: 'Confused' viewers called Metrolink to check service after Coronation Street crash". Manchester Evening News. Retrieved 23 January 2013.
  149. ^ a b c d e TfGM 2012, p. 23.
  150. ^ a b "10,000 complaints about Metrolink in one year". Manchester Evening News. 16 October 2012. Retrieved 19 January 2013.
  151. ^ Leonard, Ian (13 February 2013). "AUDIO: This is your Droylsden service, next stop is zee Etihad Campus". Daily Mail. London. Retrieved 16 February 2013.
  152. ^ Keegan, Mike (12 February 2013). "Manchester City are tram-pions as they voice the announcements for new Etihad Metrolink stop". Manchester Evening News. Retrieved 16 February 2013.
  153. ^ TfGM & GMCA 2011, pp. 136–137.
  154. ^ Ogden & Senior 1992, p. 61.
  155. ^ a b c d e f g h i j k "Route Map" (PDF). Transport for Greater Manchester. 2013. Retrieved 22 May 2013.
  156. ^ a b Ogden & Senior 1992, pp. 89–90.
  157. ^ Holt 1992, p. 31.
  158. ^ a b c GMPTE 2009, p. 4.
  159. ^ Ogden & Senior 1992, p. 102.
  160. ^ a b Kirby, Dean (6 February 2013). "Video: Sneak preview of Metrolink's brand new East Manchester Line to Droylsden". Manchester Evening News. Retrieved 6 February 2013.
  161. ^ GMPTE 2003, p. 15.
  162. ^ a b "£2m tram is up and running". Manchester Evening News. 21 December 2009. Retrieved 20 January 2013.
  163. ^ a b c Holt 1992, p. 42.
  164. ^ a b Ogden & Senior 1992, p. 111.
  165. ^ a b c Kirby, Dean (30 April 2014). "End of the line for Metrolink's first tram fleet". Manchester Evening News. Retrieved 1 May 2014.
  166. ^ Ogden & Senior 1992, p. 104.
  167. ^ Coward & Henderson 2014, p. 184.
  168. ^ Ogden & Senior 1991, p. 40.
  169. ^ Ogden & Senior 1991, p. 45.
  170. ^ a b Ogden & Senior 1992, pp. 114–115.
  171. ^ Ogden & Senior 1991, p. 41.
  172. ^ a b c d Holt 1992, p. 48.
  173. ^ a b Coward & Henderson 2014, p. 29.
  174. ^ Coward & Henderson 2014, pp. 31–32, 59.
  175. ^ "Future's yellow for trams". Manchester Evening News. 13 July 2009. Retrieved 20 January 2013.
  176. ^ a b c "Happy birthday Metrolink: Old trams axed as network turns 20". Manchester Evening News. 17 July 2012. Retrieved 29 January 2013.
  177. ^ "A new generation of trams for Greater Manchester". Metrolink. Retrieved 20 January 2013.
  178. ^ Kirby, Dean (26 September 2012). "Metrolink's next trams to have extra seats following passenger plea". Manchester Evening News. Retrieved 20 January 2013.
  179. ^ "Bombardier to Supply 10 Additional Light Rail Vehicles to Manchester Metrolink in the UK". Manchester, UK: Marketwired. 20 December 2013. Archived from the original on 23 December 2013. Retrieved 23 December 2013. To date Bombardier and Vossloh Kiepe have delivered 77 vehicles to Manchester. This option for 10 further vehicles brings the total number of LRVs ordered for the city from the consortium to 104. {{cite news}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  180. ^ Ogen & Senior 1991, p. 43.
  181. ^ GMPTE 2010, p. 6.
  182. ^ "Metrolink Completes Move To Old Trafford". Manchester Confidential. 7 May 2013. Retrieved 11 May 2013.
  183. ^ "Manchester unveils revised Superconnected Cities plans". The Manchester Gazette. 7 July 2013. Retrieved 7 July 2013.
  184. ^ "Wi-Fi tram test-trial on track for Metrolink". The Manchester Gazette. 23 August 2013. Retrieved 24 August 2013.
  185. ^ Coyle, Simon (11 July 2013). "Blueprint for town's future puts tram link in frame". Manchester Evening News. Retrieved 5 August 2013.
  186. ^ "Tram link plans are put back on track". Manchester Evening News. 6 September 2012. Retrieved 5 August 2013.
  187. ^ a b c "City of Salford Unitary Development Plan 2004–2016 Saved Policies". Salford City Council. 2004. p. Accessibility. Retrieved 28 March 2013.
  188. ^ TfGM & GMCA 2011, p. 85.
  189. ^ a b TfGM & GMCA 2011, p. 46.
  190. ^ Holt 1992, p. 93.
  191. ^ Scheerhout, John (18 August 2004). "'Ski tram' frozen out". Manchester Evening News. Retrieved 26 July 2013.
  192. ^ "Trams to the Trafford Centre set for go-ahead". Manchester Evening News. 28 June 2013. Retrieved 29 June 2013.
  193. ^ a b Greater Manchester Combined Authority (26 July 2013). "Report for Resolution: Earnback Model, SEMMMS and Metrolink Trafford Park Extension" (PDF). Association of Greater Manchester Authorities. Retrieved 26 July 2013.
  194. ^ "DfT Major Transport Scheme Devolution and the Identification of Future Transport Priorities for Greater Manchester" (PDF). Greater Manchester Local Transport Body. 31 May 2013. Retrieved 10 June 2013.
  195. ^ "Metrolink bosses consider plans to run trams on train tracks". Manchester Evening News. 29 May 2012. Retrieved 8 June 2013.
  196. ^ a b c d Ogden & Senior 1992, pp. 124–127.
  197. ^ Ogden & Senior 1992, p. 124.
  198. ^ a b c "Getting to The Quays and MediaCityUK". Transport for Greater Manchester. Retrieved 23 January 2013.
  199. ^ a b c "Brightening up your day" (PDF) (Press release). Metrolink. 2012. Retrieved 23 January 2013.
  200. ^ "Get some de-icer: Passengers fume as Metrolink trams are 'severely disrupted' by first frost of the winter". Manchester Evening News. 7 November 2011. Retrieved 23 January 2013.
  201. ^ Britton, Paul (16 January 2013). "Five inches of snow to hit Manchester". Manchester Evening News. Retrieved 23 January 2013.
  202. ^ a b c d e "The Tram: It's great ... apart from when it breaks". Manchester Evening News. 14 August 2012. Retrieved 18 January 2013.
  203. ^ "Manchester's Metrolink does not give value for money, say passengers". Manchester Evening News. 9 April 2014. Retrieved 9 April 2014.
  204. ^ a b c TfGM & GMCA 2011, p. 97.
  205. ^ Ogden & Senior 1992, p. 126.
  206. ^ a b "Metrolink set to move to new 'zone' ticket prices". Manchester Evening News. 11 October 2012. Retrieved 19 January 2013.
  207. ^ "Call to rethink rise in Greater Manchester tram fares". BBC News. 18 November 2010. Retrieved 20 January 2013.
  208. ^ a b Ogden & Senior 1992, p. 128.
  209. ^ Holt 1992, p. 83.
  210. ^ Dauby, Laurent; Kovacs, Zoltan (January 2007). "Fare Evasion in Light Rail Systems" (PDF). Transportation Research Circular (E-C112 – Proceedings Joint International Light Rail Conference, St. Louis, Missouri, 9–11 April 2006). Washington, DC: Transportation Research Board: 230–247. ISSN 0097-8515. Retrieved 21 January 2013.
  211. ^ a b Cox, Charlotte (29 June 2013). "Metrolink bosses on track to halt the 900 fare dodgers". Manchester Evening News. Retrieved 30 June 2013.
  212. ^ TfGM 2012, p. 20.
  213. ^ Cox, Charlotte (19 March 2013). "Racist attack on dad and daughter sparks tram policing review". Manchester Evening News. Retrieved 19 March 2013.
  214. ^ "Free tram rides for train riders". BBC News. 28 October 2005. Retrieved 17 February 2013.
  215. ^ "Freedom of the City". Transport for Greater Manchester. Retrieved 17 February 2013.
  216. ^ "Freedom of the City" (PDF). Transport for Greater Manchester. p. 4. Retrieved 17 February 2013.
  217. ^ TfGM & GMCA 2011, p. 79.
  218. ^ TfGM 2012, p. 38.
  219. ^ TfGM & GMCA 2011, p. 27.

Bibliography