This is a list of all stations of the Ahmedabad Metro, a rapid transit system serving Ahmedabad, India.

Ahmedabad Metro is the 12th metro system in India.

It was built and is operated by the Gujarat Metro Rail Corporation Limited. Its first section was inaugurated on 4 March 2019[1] and opened to the public on 6 March 2019, with the East-West Corridor.[2][3] The 1.4 km-long Thaltej-Thaltej Gam section and three metro stations (Kankaria East, Thaltej Gam and Sabarmati) will be completed by December 2023.[4][5][6][7] The rest of the Phase-1 was inaugurated on 30 September 2022.[8] The East-West corridor and the North-South corridor were opened to public on 2 October 2022 and 6 October 2022 respectively.[9][10]

Metro stations

[edit]
Terminal station
* Transfer station
†† Transfer station to Indian Railways / ISBT

The list gives only operational stations, alphabetically-

Sr No. Station Name Line Opened Layout Platform Layout Notes Refs
English Gujarati
1 AEC એ ઇ સી  Red Line  September 30, 2022 Elevated Side
2 Amraiwadi અમરાઈવાડી  Blue Line  March 4, 2019 Elevated Side [11]
3 APMC એ પી એમ સી  Red Line  September 30, 2022 Elevated Side
4 Apparel Park એપેરલ પાર્ક  Blue Line  March 4, 2019 Elevated Side [12]
5 Commerce Six Road કોમર્સ છ રસ્તા  Blue Line  September 30, 2022 Elevated Side
6 Doordarshan Kendra દૂરદર્શન કેન્દ્ર  Blue Line  September 30, 2022 Elevated Side
7 Gandhigram ગાંધીગ્રામ  Red Line  September 30, 2022 Elevated Side
8 Gheekanta ઘીકાંટા  Blue Line  September 30, 2022 Underground Island
9 Gujarat University ગુજરાત યુનિવર્સિટી  Blue Line  September 30, 2022 Elevated Side
10 Gurukul Road ગુરુકુળ રોડ  Blue Line  September 30, 2022 Elevated Side
11 Jivraj Park જીવરાજ પાર્ક  Red Line  September 30, 2022 Elevated Side
12 Kalupur Railway Station કાલુપુર રેલ્વે સ્ટેશન  Blue Line  September 30, 2022 Underground Island
13 Kankaria East કાંકરિયા પૂર્વ  Blue Line  September 30, 2022 Underground Island
14 Motera Stadium મોટેરા સ્ટેડિયમ  Red Line  Yellow Line  September 30, 2022 Elevated Side
15 Nirant Cross Road નિરાંત ક્રોસ રોડ  Blue Line  March 4, 2019 Elevated Side [13]
16 Old High Court જૂની હાઇ કોર્ટ  Blue Line 
 Red Line 
September 30, 2022 Elevated Side & Island
17 Paldi પાલડી  Red Line  September 30, 2022 Elevated
18 Rabari Colony રબારી કોલોની  Blue Line  March 4, 2019 Elevated Side [14]
19 Rajiv Nagar રાજીવ નગર  Red Line  September 30, 2022 Elevated
20 Ranip રાણીપ  Red Line  September 30, 2022 Elevated
21 Sabarmati સાબરમતી  Red Line  September 30, 2022 Elevated
22 Sabarmati Railway Station સાબરમતી રેલવે સ્ટેશન  Red Line  September 30, 2022 Elevated
23 Shahpur શાહપુર  Blue Line  September 30, 2022 Underground
24 Shreyas શ્રેયસ  Red Line  September 30, 2022 Elevated
25 SP Stadium એસ પી સ્ટેડિયમ  Blue Line  September 30, 2022 Elevated
26 Thaltej થલતેજ  Blue Line  September 30, 2022 Elevated
27 Usmanpura ઉસ્માનપુરા  Red Line  September 30, 2022 Elevated
28 Vadaj વાડજ  Red Line  September 30, 2022 Elevated
29 Vastral વસ્ત્રાલ  Blue Line  March 4, 2019 Elevated Side [15]
30 Vastral Gam વસ્ત્રાલ ગામ  Blue Line  March 4, 2019 Elevated Side [16]
31 Vijay Nagar વિજય નગર  Red Line  September 30, 2022 Elevated
32 Sector-1 (Gandhinagar)  Yellow Line  September 17, 2024 Elevated
33 Infocity  Yellow Line  September 17, 2024 Elevated
34 Dholakuva Circle  Yellow Line  September 17, 2024 Elevated
35 Randesan  Yellow Line  September 17, 2024 Elevated
36 GNLU  Yellow Line  Violet Line  September 17, 2024 Elevated
37 Raysan  Yellow Line  September 17, 2024 Elevated
38 Koba Gam  Yellow Line  September 17, 2024 Elevated
39 Juna Koba  Yellow Line  September 17, 2024 Elevated
40 Koba Circle  Yellow Line  September 17, 2024 Elevated
41 Narmada Canal  Yellow Line  September 17, 2024 Elevated
42 Tapovan Circle  Yellow Line  September 17, 2024 Elevated
43 Vishwakarma College  Yellow Line  September 17, 2024 Elevated
44 Koteshwar Road  Yellow Line  September 17, 2024 Elevated
45 PDPU  Violet Line  September 17, 2024 Elevated
46 GIFT City  Violet Line  September 17, 2024 Elevated

Statistics

[edit]
Total number of metro stations 54
Number of interchange stations 3
Number of Elevated stations 50
Number of underground stations 4
Number of stations At-Grade 0

See also

[edit]

References

[edit]
  1. ^ "PM Narendra Modi inaugurates Ahmedabad Metro first phase, takes a ride". livemint.com. 4 March 2019. Retrieved 8 March 2019.
  2. ^ "Ahmedabad Metro to open for public on Wednesday". Times of India. 5 March 2019. Retrieved 6 March 2019.
  3. ^ "Ahmedabad Metro to open for public on Wednesday - Times of India". The Times of India. 5 March 2019. Retrieved 10 March 2019.
  4. ^ "3 new metro stations in Ahmedabad likely to open later this year". DeshGujarat. 28 April 2023. Retrieved 28 May 2023.
  5. ^ "Ten firms bid for last section of Phase-2 of Ahmedabad Metro". The Indian Express. 15 May 2022. Retrieved 11 June 2022.
  6. ^ "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. 11 July 2022. Retrieved 13 July 2022.
  7. ^ "Ahmedabad Metro receives CMRS clearance". The Indian Express. 17 September 2022. Retrieved 30 September 2022.
  8. ^ "PM Modi to launch Ahmedabad Metro Phase 1, flag off Vande Bharat Express during two-day Gujarat visit". 28 September 2022.
  9. ^ "મેટ્રો ટ્રેનની સવારી: અમદાવાદમાં થલતેજ-વસ્ત્રાલ મેટ્રો ગાંધી જયંતીથી, એપીએમસી-મોટેરા 6 ઓક્ટોબરથી શરૂ થશે". Divya Bhaskar (in Gujarati). 30 September 2022. Retrieved 30 September 2022.
  10. ^ "Ahmedabad Metro Route Map, Station List, Progress and Latest Updates - Infra Info Hub". 13 September 2024. Retrieved 28 November 2024.
  11. ^ "No parking at 60% metro stations in Ahmedabad". DNA. 4 January 2019. Retrieved 5 January 2019.
  12. ^ "Metro Tunnel from apparel park to kalupur ready". Times of India. 26 February 2019. Retrieved 27 February 2019.
  13. ^ "Ahmedabad Metro gains traction with over 1k passengers daily". DNA. 6 May 2019. Retrieved 7 May 2019.
  14. ^ "Wait for Metro just got longer by 2 Years". Ahmedabad Mirror. 7 November 2019. Retrieved 8 November 2019.
  15. ^ "Ahmedabad Metro train faces technical glitch again operation hampered for around half an hour". UNI. 13 March 2019. Retrieved 14 March 2019.
  16. ^ "Trial run of Ahmedabad Metro on Vastral Gam-Apparel Park stretch to start in January 2019". Times of India. 22 August 2018. Retrieved 23 August 2018.