Kitchen remodel

We re-did our kitchen. We rearranged the pantry and desk(turned it into a wine fridge) and added Coronado stone(Lowes) for the backsplash and below the breakfast bar. We sanded/re-stained our cabinets Ebony. Our next goal is to make a kitchen island where the breakfast nook was and put an electric cooktop over in and replace our current oven/microwave with double ovens. Once our dining room and master bath are done, we'll see what project lurks after that.
14 Pins
·
12y
Last view, pretty close to 100% complete. It took us 7 days and we worked about 11-12 hours every single day. When we finished this, we realized why cabinets cost so much damn money. That was some hard freakin work! But, we love our kitchen now.
Better view of the pantry and wine fridge now.
Much more cabinet space now that the pantry and desk(wine fridge) were switched around.
The finished product(before cabinets were sealed and completed). You can see the wine fridge which was once my desk against the far wall.
Cabinet boxes are about done being stained
The rock backsplash is in, still working on cabinets.
You can see the layers of sawdust on our couch which was about a month old
And the sanding begins. What a mess my house was for the 7 days it took us to do this. :o/
View from the living room showing where the pantry and desk were before we switched them around for more counter space and turned the desk into a wine fridge.
Another before pic of the sink and raised bar.
Kitchen before, when we moved in.