Waterloo to Reading Line

From Infogalactic: the planetary knowledge core
(Redirected from Waterloo to Reading line)
Jump to: navigation, search
Waterloo to Reading Line
Egham Juniper Train.jpg
Overview
Type
System National Rail
Status Operational
Locale
Termini London Waterloo
Reading
Stations 26
Operation
Owner Network Rail
Operator(s) South West Trains
Depot(s) Clapham Junction
Rolling stock
Technical
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V DC third rail
Waterloo to Reading Line
0m 00ch London Waterloo London Underground London River Services
Vauxhall London Underground
Queenstown Road
West London Line
enlarge… Clapham Junction London Overground
South Western Main Line
Wandsworth Town
River Wandle
Point Pleasant Junction
District line routing used
by SWT main line diversions
District line (LU)
to Earl's Court • to Wimbledon
Putney
Barnes
Barnes Junction
Vine Lane
Barnes Inner Link lifted
Hounslow Loop Line
White Hart Lane
Sheen Lane
Mortlake
North Sheen
North Sheen (Manor Road)
District line (LU) &
North London Line (LO )
link lifted
London Underground & Overground
share tracks Richmond to Gunnersbury
Richmond London Underground London Overground
Richmond Railway Bridge
over River Thames
St Margarets
Twickenham
Kingston Loop Line
River Crane
Duke of Northumberland's River
(Eastern section)
Whitton
Hounslow Loop Line
Whitton Junction
Hounslow Junction
Feltham Junction
River Crane
Feltham marshalling yard
(1917-1967)
14m 68ch
Feltham
for bus to Heathrow Airport
Bus interchange Heathrow Airport
Longford River
Bedfont Lane
17m 40ch Ashford
19m 02ch Staines
Staines to Windsor & Eton Line
Staines Railway Bridge
over River Thames
Thorpe Lane
Pooley Green
M25 motorway
21m 02ch Egham
Rusham Lane
Virginia Water cutting
23m 15ch Virginia Water
Chertsey Branch
25m 11ch Longcross
London Road
26m 71ch Sunningdale
28m 79ch Ascot
Ascot to Guildford Line
Ascot West Race Platform
31m 09ch Martins Heron
32m 24ch Bracknell
Waterloo Road
Star Lane
36m 34ch
61m 74ch
Milepost change
original westward mileage from Charing †
North Downs Line
62m 08ch Wokingham
M4 motorway
64m 10ch Winnersh
64m 72ch Winnersh Triangle
River Loddon
66m 01ch Earley
River Kennet
Great Western Main Line
to Paddington
Reading Southern(1855-1965)
43m 28ch
68m 68ch
Reading
Great Western Main Line

The Waterloo to Reading Line is a National Rail mainly suburban electric railway line between London Waterloo station and Reading railway station, running westwards from Central London to Reading, in central Berkshire. Its passenger operation is by South West Trains (SWT) which also manage its stations.

The Waterloo to Reading line is the core of a group of lines and branches heading generally westwards from Waterloo, providing predominantly passenger services into London. All of the branches and connecting lines have direct services into a dedicated group of platforms at Waterloo, so most of the services using the line do not run the whole length of the line. After leaving Waterloo, the line runs parallel to the South West Main Line before diverging at Clapham Junction and heading westwards. Within Greater London, the Hounslow Loop Line diverges at Barnes and reconnects again near Feltham, whilst the Kingston Loop Line diverges at Twickenham to join up with the South West Main Line at New Malden. At Staines, the original route carries onto Windsor, whilst the 1853 route to Reading diverges towards Egham. At Virginia Water, the Chertsey Branch Line provides another connection to the South West Main Line whilst at Ascot, the Ascot to Guildford Line heads southwards towards Aldershot and Guildford. At Wokingham, the line joins the North Downs Line and carries on into Reading, to terminate in platforms 4, 5 and 6. The line also sees some freight services and occasional special charters, which usually use the connecting line at Reading to join the Great Western Main Line.

Due the predominantly suburban nature of the line, services between Reading and Waterloo are relatively slow compared to the mainline from Reading to Paddington. The line is predominantly used for commuter traffic into London with most of the traffic being generated by the intermediate stations. To ease over-crowding, future plans are to extend services from 8-coach trains to 10-coach trains and there have been calls to change the service patterns to provide some additional and faster services, cutting out some of the intermediate stops.

History

The London and Southampton Railway opened the first stretch of railway between Nine Elms and Woking Common on the 12 May 1838, and renamed itself as the London and South Western Railway (L&SWR) one month later. As the L&SWR continued extending its railway towards Southampton, the first branch was opened by the Richmond and West End Railway (R&WER) to Richmond on 27 July 1846.[1] This branch line started at what is now Clapham Junction, although the station itself did not open until 2 March 1863. The terminus at Nine Elms was replaced on 11 July 1948 with a new station at Waterloo, originally named as Waterloo Bridge. The Richmond branch was extended further west by the Windsor, Staines and South Western Railway (WS&SWR) opening as far as Datchet on 22 August 1848 and to Windsor on 1 December 1849. Both the R&WER and WS&SWR were purchased by the L&SWR before their respective lines had been completed.

The South Eastern Railway (SER) opened its line from Wokingham to Reading on 15 October 1849 under the auspices of the Reading, Guildford and Reigate Railway (RG&RR), which was then taken over by the SER in 1852.[2] This was part of the SER line from London to Reading via Guidlford and terminated at Reading Southern railway station, which was adjacent to, but separate from the Great Western Railway station at Reading.

The line linking Staines with Wokingham was authorised in 1853 and built by the Staines, Wokingham and Woking Junction Railway, opening from Staines to Ascot on 4 June 1856 and onwards to Wokingham on the 9 July 1856.[2] Initial services on the line was 6 trains a day between Waterloo and Reading (2 on Sundays), building up to 14 trains a day (7 on Sunday) by 1928.The line was operated by the L&SWR from the outset, who leased it from the owning company in 1858 for 50% of the gross profits, before purchasing it outright in 1878.[3]

There were now three competing routes to Reading: the GWR from Paddington at 36 miles; the LSWR from Waterloo at 43.5 miles and the SER from Charing Cross at 69 miles. Despite the disparity, the GWR was not the obvious choice due to relative position of Paddington station, west of the City of London. This allowed intense competition between the three companies until in 1858 a new agreement between the three companies was made to fix prices and share fares. The agreement led to a connecting spur between the SER and GWR railways in Reading being opened for goods traffic on 1 December 1858 and to passenger traffic on 17 January 1859. A better placed link was opened on 17 December 1899, and a third link on 1 June 1941.[3] The link is today used by special services such as luxury steam services.

The line was electrified on the DC third rail system, initially at 660 volts, in sections:

  • Waterloo to Twickenham flyover (for Kingston Loop) 30 January 1916
  • Twickenham to Whitton Junction (for Hounslow Loop) 12 March 1916
  • Whitton Junction to Windsor 6 July 1930[4]
  • Staines to Virginia Water 3 January 1937 as part of the electrification of lines to Portsmouth[2]
  • Virginia Water to Ascot and Reading South 1 January 1939.[2]
Reading station with Southern Region trains in 1979.

Early on Sunday 15 November 2009 the bridge carrying the line over the River Crane, London partly collapsed leading to service suspension. They were restored eight days later on a temporary diversionary line with a 20 mph speed limit laid across the site of the disused Feltham Marshalling yard. The defective bridge was demolished and rebuilt.

Passenger Services and rolling stock

In the timetable based on a certain amount of time-honoured custom, there are two trains per hour between Waterloo and Reading, every day of the week, the Reading service calls at major stations Clapham Junction, Richmond, Twickenham, Feltham (with a short bus link to Heathrow Airport), Staines and then all 10 through stations to Reading, excluding Longcross. During peak hours, additional trains are run which skip Winnersh, Winnersh Triangle and Earley, and add stops at Vauxhall and Ashford (Surrey). Longcross is served by an irregular peak hours only service, Monday to Friday.

Connecting lines add additional services on this line -

For many years, the rolling stock used on the direct Waterloo to Reading services was the class 458 4-coach units, marshalled in pairs, providing 8 coaches on all services. This stock is being replaced by class 450, also providing 8 coaches, as the Class 458 units are being converted to 5 coaches, using redundant class 460 units for use on the Waterloo to Windsor line. Failures of units sometimes result in 4-coach trains and there are also occasional substitutions using class 455 units.

Future

Due to over-crowding on the line, a number of enhancements are underway to improve services. Most stations between Waterloo and Windsor are having platforms lengthened to allow the operation of 10 coach trains, using converted class 458 units.[5] Platform 20 at the former Waterloo International Terminal, came back into service in October 2013 to provide additional capacity [6] and additional trains have been ordered from Siemens to improve services,[7] although the exact services covered have not yet been detailed. On 20 November 2014, Network Rail published its Wessex Route Study for consultation,[8] which includes aspirations are to introduce 10 coach trains on services to Reading, and to open more of the platforms at Waterloo International, but neither of these are detailed schemes yet and will not be implemented before 2019.

On 24 March 2014, The Thames Valley Local Enterprise Partnership published a report showing the economic benefits of improvements to the Waterloo to Reading line.[9] This looked at the economic benefits of increasing services, speeding up services (timetabling more semi-fast and fast services to improve access to major stops from London and from Reading) and adding access to Heathrow Airport, and concluded that the benefits exceeded the costs of such improvements.

References

  1. Mitchell, Vic and Smith, Keith (1988) Waterloo to Windsor, 1st ed, Middleton Press, Midhurst
  2. 2.0 2.1 2.2 2.3 Mitchell, Vic and Smith, Keith (1989) Branch lines around Ascot, 1st ed, Middleton Press, Midhurst
  3. 3.0 3.1 Maggs, Colin C. (1993) Branch Lines of Berkshire, 1st ed, Alan Sutton Publishing, Stroud
  4. Marshall, C.F.D (1963) History of the Southern Railway, 2nd ed, Ian Allan, London p.413
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.