Category:Herrenknecht AG
Jump to navigation
Jump to search
German tunnel boring company | |||||
Upload media | |||||
Instance of |
| ||||
---|---|---|---|---|---|
Industry | |||||
Location |
| ||||
Headquarters location | |||||
Legal form |
| ||||
Founded by |
| ||||
Inception |
| ||||
official website | |||||
| |||||
Deutsch: Die Herrenknecht AG ist ein Hersteller von Tunnelvortriebsmaschinen.
English: Herrenknecht AG is a German manufacturer of tunnel boring machines.
Français : Herrenknecht AG est un constructeur allemand de tunneliers.
Subcategories
This category has the following 13 subcategories, out of 13 total.
C
E
- Élaine tunnel boring machine (Rennes) (1 P, 19 F)
- Elisa Tunneling Machine (22 F)
L
M
T
- TRUDE (20 F)
Media in category "Herrenknecht AG"
The following 48 files are in this category, out of 48 total.
-
Allmannsweier, Herrenknecht.jpg 3,996 × 1,804; 655 KB
-
Antriebsmotoren-Bohrschild-S833.jpg 3,000 × 2,000; 1.73 MB
-
Arroyo Vega - Tuneladora Pipe Jacking (03).jpg 6,000 × 4,000; 8.05 MB
-
Arroyo Vega - Tuneladora Pipe Jacking (07).jpg 6,000 × 4,000; 5.71 MB
-
Bauma Stand Herrenknecht 2.JPG 3,872 × 2,592; 2.69 MB
-
Bauma Stand Herrenknecht.JPG 3,872 × 2,592; 3 MB
-
Bohrkopf der TBM.JPG 4,608 × 3,456; 5.94 MB
-
DC Water-TBM cutting head-2014.jpg 4,288 × 2,848; 3.38 MB
-
Direct Pipe con Pipe thruster.jpg 3,333 × 2,062; 1.64 MB
-
Direct Pipe TBM scudata.jpg 4,160 × 2,336; 2.65 MB
-
DT8 Tan Kah Kee MRT 622448 10151221555909543 275209667 o Q4 2012.jpg 1,280 × 854; 345 KB
-
Durchmesserlinie Altstetten-ZHB-Oerlikon Tunnel-Bohrmaschine.jpg 1,600 × 1,200; 1,021 KB
-
Fildertunnel Südportal1.jpg 3,648 × 2,736; 2.73 MB
-
Finne Tunnel Shield Ceremony 1.jpg 3,456 × 2,304; 2.58 MB
-
Finne Tunnel Shield Ceremony 2.jpg 3,456 × 2,304; 2.24 MB
-
Finne Tunnel Shield Ceremony 3.jpg 2,304 × 3,456; 2.38 MB
-
Finnetunnel-Sept2008-2.jpg 3,456 × 2,304; 1.11 MB
-
GCBA - Cuenca Vega - Etapa 1 (01).jpg 2,448 × 3,264; 3.25 MB
-
GCBA - Cuenca Vega - Tuneladora (11).jpg 2,560 × 3,840; 3.21 MB
-
GCBA - Cuenca Vega - Tuneladora (12).jpg 3,840 × 2,560; 2.77 MB
-
Herrenknecht logo.svg 84 × 57; 12 KB
-
Herrenknecht Tunnelbohrmaschine Modellbeschreibung.JPG 3,872 × 2,592; 2.48 MB
-
Herrenknecht Tübbing Modell 2.JPG 3,872 × 2,592; 2.55 MB
-
Herrenknecht Tübbing Modell 3.JPG 3,872 × 2,592; 2.42 MB
-
Herrenknecht Tübbing Modell.JPG 3,872 × 2,592; 2.72 MB
-
Innenansicht-Herrenknecht-S833.jpg 3,000 × 2,000; 1.74 MB
-
Matilda TBM.jpg 2,048 × 1,536; 782 KB
-
Modell Herrenknecht Tunnelbohrung 1.JPG 3,872 × 2,592; 2.93 MB
-
Modell Herrenknecht Tunnelbohrung.JPG 3,872 × 2,592; 2.59 MB
-
OFS 04res.jpg 2,498 × 1,851; 3.38 MB
-
Pipe Thruster 01.jpg 4,608 × 3,456; 3.35 MB
-
Pipe Thruster 02.jpg 4,608 × 2,240; 3.88 MB
-
Pipe Thruster 03.jpg 4,608 × 3,456; 3.08 MB
-
Pipe Thruster morsa idraulica.jpg 3,264 × 2,448; 1.9 MB
-
Pipe Thruster pistoni martinetti.jpg 4,608 × 3,456; 2.65 MB
-
S21FildertunnelSusedurchschlag09092019.jpg 3,024 × 4,032; 3.37 MB
-
Santier Metrou - Academia Militara.jpg 1,620 × 1,080; 1.76 MB
-
Schneckenförderer-S833.jpg 3,000 × 2,000; 2.39 MB
-
Schönenwerd-Wöschnau Eppenbergtunnel 1K4A2198 (2).jpg 8,688 × 5,792; 14.96 MB
-
TBM - Santier Metrou - Academia Militara.jpg 1,440 × 1,080; 1.13 MB
-
TBM Warsaw Wileński 2.JPG 4,752 × 3,168; 4.36 MB
-
TBM Warsaw Wileński.JPG 4,752 × 3,168; 4.26 MB
-
Tunnelbohrmaschine EPB Käthchen am Boßlertunnel .JPG 4,608 × 3,456; 6.35 MB
-
Vortriebszylinder-Herrenknecht-S833.jpg 3,000 × 2,000; 1.66 MB
-
Westportal bei Chorherrn mit Tunnelbohrmaschine.jpg 2,048 × 1,536; 742 KB
-
Монтаж ротора ТПМК на Кожуховской линии метро.jpg 1,600 × 1,065; 1.42 MB
-
Монтажная камера для ТПМК на Кожуховской линии метро.jpg 1,600 × 1,065; 1.42 MB
-
Ротор ТПМК фирмы Herrenknecht на участке строительства Кожуховской линии метро.jpg 1,600 × 1,065; 1.3 MB