Raft foundation detail drawing

Discover Pinterest’s best ideas and inspiration for Raft foundation detail drawing. Get inspired and try out new things.
1k people searched this
·
Last updated 4d
Raft Foundation, Mat Foundation, Raft Building, Basic Human Needs, Building Types, Human Needs, Building Foundation, Concrete Column, Elements And Principles

A raft column footing, also known as a mat foundation, is a continuous slab that supports multiple columns, spreading the loads over a large area. It's used when soil bearing capacity is low, and individual footings would be too close, making a combined foundation impractical. Raft Building Foundations are constructed with typical slab depths between 4”-12” (10-30 cm). Column widths are commonly 8”-12” (20-30 cm) with column spacings from 9’10”-24’6” (3-7.5 m).

10
Raft Foundation Construction Plan download AutoCAD Drawing Architecture Drawing Plan Autocad, Raft Foundation, Raft Foundation Detail Drawing, Foundation Construction, Autocad Elevation Drawings, Autocad Free, 2d Plan Autocad, 2d Plan Autocad Elevation, Plan Elevation Section Of House Autocad

CAD drawing details of the footing plan that shows the typical layout of raft footing construction details along with footing spacing details, dimension details, footing size, and other RCC structural blocks detailing download file.

17
This construction article provides the detail construction methods for raft foundation of a building. The raft foundation is conducted for the multistory buildings or building having heavy loads.  Step 1: Initially, the surveyor should begin exaction and as soon as the survey is completed then exaction is carried out to the desired level on the basis of the validated shop drawings. Raft Foundation Detail Drawing, Multistory Buildings, Raft Foundation, Foundation Construction, Mat Foundation, Foundation Plan, Last Option, Foundation Design, Architecture Render

This construction article provides the detail construction methods for raft foundation of a building. The raft foundation is conducted for the multistory buildings or building having heavy loads. Step 1: Initially, the surveyor should begin exaction and as soon as the survey is completed then exaction is carried out to the desired level on the basis of the validated shop drawings.

20

Related interests