Huaihejieshenyieryuan station

Huaihejieshenyieryuan (Chinese: 淮河街沈医二院站; pinyin: Huáihéjiēshěnyīèryuàn Zhàn) is an interchange station on lines 9 and 10 of the Shenyang Metro.[1] The Line 9 station opened on 25 May 2019,[2] and the Line 10 station opened on 29 April 2020.[3]

Huaihejieshenyieryuan

淮河街沈医二院
 metro 
General information
LocationIntersection of Huaihe St. and Chongshan West Rd.
Huanggu District, Shenyang
China
Coordinates41°49′41″N 123°23′05″E / 41.82819°N 123.38462°E / 41.82819; 123.38462
Operated byShenyang Metro
Line(s)     Line 9
     Line 10
Platforms4
Construction
Structure typeUnderground
AccessibleYes
History
Opened25 May 2019;
5 years ago
 (2019-05-25) (Line 9)
29 April 2020;
4 years ago
 (2020-04-29) (Line 10)
Services
Preceding station Shenyang Metro Following station
Nujianggongyuan
Terminus
Line 9 Huanggutunzhan
towards Jianzhudaxue
Tawanjie
towards Dingxianghu
Line 10 Bainiaogongyuan
towards Zhangshabu

Station Layout

edit
G Entrances and Exits Exits B-G
B1 Concourse Faregates, Station Agent
B2 Northbound      Line 10 towards Dingxianghu (Tawanjie)
Island platform, doors open on the left
Southbound      Line 10 towards Zhangshabu (Bainiaogongyuan)
B3 Northbound      Line 9 towards Nujianggongyuan (Terminus)
Island platform, doors open on the left
Southbound      Line 9 towards Jianzhudaxue (Huanggutunzhan)

References

edit
  1. ^ "沈阳地铁线网图". Shenyang Metro. Retrieved 12 October 2020.
  2. ^ "沈阳地铁集团有限公司运营分公司". Shenyang Metro. Retrieved 12 October 2020.
  3. ^ "沈阳地铁十号线一期工程定于4月29日开通运营". Shenyang Metro. Retrieved 13 October 2020.