Jump to content

Cooma Monaro Railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Siuhl10 (talk | contribs) at 14:42, 13 January 2023 (toursit->tourist - Correct typos in one click). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Cooma Monaro Railway
CPH6 at Chakola station in March 2012
Coordinates36°14′11″S 149°08′07″E / 36.2364744°S 149.1352844°E / -36.2364744; 149.1352844
Commercial operations
NameBombala line
Built byNSWGR
Original gauge4 ft 8+12 in (1,435 mm)
Preserved operations
Stations3
Length17.5 km (10.9 mi)
Commercial history
Opened1889
Closed1989
Preservation history
1992started
HeadquartersCooma
Website
Cooma Monaro Railway

The Cooma Monaro Railway is a heritage railway museum that is actively restoring the Cooma Railway Precinct while working on the restoration of tourist trains along the section of track on the Bombala line between Cooma and the terminus at Bombala in New South Wales, Australia. Restoration of the track within the yard at Cooma is currently being restored along with the section north to Snowy Junction.

The Cooma Monaro Railway Museum, including the Travel for Pleasure exhibit will open in December 2022 at Cooma Railway Station with tourist trains expected to return in 2023.

The railway also run a monthly fresh produce market on the second Sunday of the month at Cooma Railway Station.[1]

History

Regular services on the Bombala line ceased south of Queanbeyan with the withdrawal of the Canberra Monaro Express in September 1988.[2] Following a bridge carrying the line over the Numeralla River at Chakola being declared unsafe, freight services south of Queanbeyan ceased in May 1989.[3] However a steam special did operate through to Cooma a few weeks later, albeit without passengers over the bridge in question.[4]

In 1992, the Cooma Monaro Railway was formed with the aim of establishing a tourist railway. It set about negotiating a lease on the Bombala line from Cooma to Chakola with the State Rail Authority. In 1994, it purchased three CPH railmotors 6, 8 and 22 and accompanying trailer CTC55 from the Mountain High Railway, Tumut, and restoration at the former locomotive shed at Cooma commenced. After the line and railmotors were refurbished, operations commenced on 5 December 1998.[5][6][7]

Trains ceased operating in January 2014, with major repairs required to the line.[8][9][10] In January 2015, 620/720 class railcars 625/725 and 631/731 were purchased from RailCorp. FP Paybus FP11 is also in the collection.[11]

References

  1. ^ "Cooma Monaro Railway – NSW's Alpine Heritage Railway Museum". Retrieved 12 August 2021.
  2. ^ "Cooma" Railway Digest February 1989 page 55
  3. ^ "Last Cooma Freight" Railway Digest July 1989 page 237
  4. ^ "High Drama or Farce and Tragedy" Railway Digest August 1989 page 261
  5. ^ History Archived January 22, 2013, at the Wayback Machine Cooma Monaro Railway
  6. ^ "Rail Returns to Snowy Mountains" Railway Digest January 1999 page 42
  7. ^ "Cooma News" Railway Digest July 1999 page 44
  8. ^ Cooma Monaro Railway closed and in need of community muscle ABC Local Radio 12 February 2014
  9. ^ Railway stopped Cooma Monaro Express 13 February 2014
  10. ^ Efforts to get the Cooma Railway back on track Canberra Times 3 January 2015
  11. ^ Rolling Stock Archived 2007-04-08 at the Wayback Machine Cooma Monaro Railway