Jawaharpur Super Thermal Power Station: Difference between revisions
Appearance
Content deleted Content added
No edit summary Tags: Mobile edit Mobile web edit |
fixed unknown parameter in infobox |
||
(13 intermediate revisions by 7 users not shown) | |||
Line 14: | Line 14: | ||
| commissioned = 2021 |
| commissioned = 2021 |
||
| decommissioned = |
| decommissioned = |
||
| cost = Approx INR |
| cost = Approx INR 10500 Crore |
||
| ps_site_area = {{convert|350|hectare}} |
|||
| owner = Jawaharpur Vidyut Utpadan Nigam Limited |
| owner = Jawaharpur Vidyut Utpadan Nigam Limited |
||
| operator = UP Rajya Vidyut Utpadan Nigam Limited ([[UPRVUNL]]) |
| operator = UP Rajya Vidyut Utpadan Nigam Limited ([[UPRVUNL]]) |
||
Line 21: | Line 22: | ||
| extra = |
| extra = |
||
}} |
}} |
||
'''Jawaharpur Vidyut Utpadan Nigam Ltd''' is an upcoming thermal power plant coming up at Town Malawan district [[Etah]] in [[Uttar Pradesh]], India.<ref>https://www.sourcewatch.org/index.php/Jawaharpur_Thermal_Project</ref> The power plant is one of the [[coal]]-based power plants of Jawaharpur Vidyut Utpadan Nigam Ltd. (JVUNL), a 100% subsidiary of UP Rajya Vidyut Utpadan Nigam Limited ([[UPRVUNL]])<ref>http://apps.uprvunl.org/uprvunltender/tender/HeadOffice/HeadOffice20721c.pdf</ref> |
'''Jawaharpur Vidyut Utpadan Nigam Ltd''' is an upcoming thermal power plant coming up at Town Malawan district [[Etah]] in [[Uttar Pradesh]], India.<ref>{{cite web|url=https://www.sourcewatch.org/index.php/Jawaharpur_Thermal_Project|title=Jawaharpur Thermal Project - SourceWatch|website=www.sourcewatch.org|access-date=7 January 2019|archive-date=7 January 2019|archive-url=https://web.archive.org/web/20190107233418/https://www.sourcewatch.org/index.php/Jawaharpur_Thermal_Project|url-status=live}}</ref> The power plant is one of the [[coal]]-based power plants of Jawaharpur Vidyut Utpadan Nigam Ltd. (JVUNL), a 100% subsidiary of UP Rajya Vidyut Utpadan Nigam Limited ([[UPRVUNL]])<ref>{{Cite web |url=http://apps.uprvunl.org/uprvunltender/tender/HeadOffice/HeadOffice20721c.pdf |title=Archived copy |access-date=9 April 2016 |archive-date=12 May 2016 |archive-url=https://web.archive.org/web/20160512173051/http://apps.uprvunl.org/uprvunltender/tender/HeadOffice/HeadOffice20721c.pdf |url-status=live }}</ref> |
||
The Contract |
The Contract was awarded to Doosan Power Systems India (DPSI).<ref>{{Cite web |url=http://mengnews.joins.com/view.aspx?aId=3027886 |title=Doosan seals deal to build generators in India-INSIDE Korea JoongAng Daily |access-date=28 December 2016 |archive-date=27 December 2016 |archive-url=https://web.archive.org/web/20161227074828/http://mengnews.joins.com/view.aspx?aId=3027886 |url-status=dead }}</ref> |
||
==Capacity== |
==Capacity== |
||
The planned capacity of the power plant is 1320 MW (2x660MW). Expected commissioning in year 2021.<ref>{{Cite news|url=http://english.yonhapnews.co.kr/news/2016/12/26/0200000000AEN20161226005000320.html|title=Doosan Heavy lands 2.7 tln-won deal to build power plants in India|newspaper=Yonhap News Agency|language=en|access-date=2016-12-28}}</ref> |
The planned capacity of the power plant is 1320 MW (2x660MW). Expected commissioning in year 2021.<ref>{{Cite news|url=http://english.yonhapnews.co.kr/news/2016/12/26/0200000000AEN20161226005000320.html|title=Doosan Heavy lands 2.7 tln-won deal to build power plants in India|newspaper=Yonhap News Agency|language=en|access-date=2016-12-28|archive-date=28 December 2016|archive-url=https://web.archive.org/web/20161228200031/http://english.yonhapnews.co.kr/news/2016/12/26/0200000000AEN20161226005000320.html|url-status=live}}</ref> |
||
{| class="sortable wikitable" |
{| class="sortable wikitable" |
||
⚫ | |||
|- |
|- |
||
⚫ | |||
⚫ | |||
|- |
|- |
||
| 1st || |
| 1st || 1 || 660 ||29.04.2023 || Completed |
||
|- |
|- |
||
⚫ | |||
|} |
|} |
||
Line 51: | Line 52: | ||
[[Category:Coal-fired power stations in Uttar Pradesh]] |
[[Category:Coal-fired power stations in Uttar Pradesh]] |
||
[[Category:Etah district]] |
[[Category:Etah district]] |
||
[[Category:Energy infrastructure completed in 2021]] |
|||
[[Category:2021 establishments in Uttar Pradesh]] |
|||
Latest revision as of 04:06, 11 October 2023
Jawaharpur Super Thermal Power Station at Etah District in Uttar Pradesh | |
---|---|
Official name | Jawaharpur Super Thermal Power |
Country | India |
Location | Etah, Uttar Pradesh |
Coordinates | 27°29′48″N 78°49′36″E / 27.4966°N 78.8268°E |
Status | Under construction by Doosan Power Systems India (DPSI) |
Construction began | December 2016 |
Commission date | 2021 |
Construction cost | Approx INR 10500 Crore |
Owner | Jawaharpur Vidyut Utpadan Nigam Limited |
Operator | UP Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) |
Thermal power station | |
Primary fuel | Coal |
Site area | 350 hectares (860 acres) |
External links | |
Website | www |
Jawaharpur Vidyut Utpadan Nigam Ltd is an upcoming thermal power plant coming up at Town Malawan district Etah in Uttar Pradesh, India.[1] The power plant is one of the coal-based power plants of Jawaharpur Vidyut Utpadan Nigam Ltd. (JVUNL), a 100% subsidiary of UP Rajya Vidyut Utpadan Nigam Limited (UPRVUNL)[2]
The Contract was awarded to Doosan Power Systems India (DPSI).[3]
Capacity
[edit]The planned capacity of the power plant is 1320 MW (2x660MW). Expected commissioning in year 2021.[4]
Stage | Unit Number | power (MW) | Date of Commissioning | Status |
---|---|---|---|---|
1st | 1 | 660 | 29.04.2023 | Completed |
1st | 2 | 660 | Construction ongoing. |
Media
[edit]See also
[edit]References
[edit]- ^ "Jawaharpur Thermal Project - SourceWatch". www.sourcewatch.org. Archived from the original on 7 January 2019. Retrieved 7 January 2019.
- ^ "Archived copy" (PDF). Archived (PDF) from the original on 12 May 2016. Retrieved 9 April 2016.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Doosan seals deal to build generators in India-INSIDE Korea JoongAng Daily". Archived from the original on 27 December 2016. Retrieved 28 December 2016.
- ^ "Doosan Heavy lands 2.7 tln-won deal to build power plants in India". Yonhap News Agency. Archived from the original on 28 December 2016. Retrieved 28 December 2016.