Jump to content

Teck Ghee MRT station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Sni56996 (talk | contribs) at 05:48, 25 January 2019 (Reference). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

 CR 
Teck Ghee
Rapid transit
General information
Owned byLand Transport Authority
Line(s)
PlatformsIsland
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code CR 
History
Opening2029; 5 years' time (2029)

Teck Ghee MRT station (CRL) is a future underground Mass Rapid Transit station on the Cross Island MRT line in Chong Boon planning area, Singapore.

History

Teck Ghee station was first announced on 25 January, 2019 as part of the first stretch of the Cross Island Line (CRL).[1][2]

References

  1. ^ "Joint News Release by the Land Transport Authority (LTA) & SLA - Cross Island Line 1: New Links by 2029". Land Transport Authority. 25 January 2019.
  2. ^ "First phase of Cross Island Line to open by 2029 with 12 stations". Channel NewsAsia. 25 January 2019.

Template:Cross Island MRT Line navbox

Category:Proposed railway stations in Singapore Category:Mass Rapid Transit (Singapore) stations