List of spacewalks since 2015
This list contains all spacewalks performed since the beginning of 2015 where an astronaut has fully, or partially left the spacecraft.[1]
As of 19 August 2016, 215 astronauts have made spacewalks (out of 549 people who have gone into Earth orbit).[2][3][4][5]
Since 1981, NASA has measured spacewalk duration from when the suits went to internal power until the start of airlock re-pressurization. Roscosmos and China have always used the time from hatch opening to hatch closure.[1] These charts typically follow the agency's measurements of spacewalk duration, because those figures tend to be the most readily available, as they are most often provided by the agency.
2015–2019 spacewalks
[edit]Spacewalk beginning and ending times are given in Coordinated Universal Time (UTC).
2015 spacewalks
[edit]# | Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|---|
374 | 21 February 12:45 |
6 hours, 41 minutes | 19:26 | Expedition 42 ISS Quest |
Rigged and routed power and data cables at the forward end of the Harmony module as part of preparations for the installation of the International Docking Adapter at PMA-2.[6] | |
375 | 25 February 11:51 |
6 hours, 43 minutes | 18:34 | Expedition 42 ISS Quest |
Completed power and data cable routing at the forward end of the Harmony module. Removed launch locks from forward and aft berthing ports of Tranquility to prepare for relocation of the Permanent Multipurpose Module and the installation of the Bigelow Expandable Activity Module. Lubricated end effector of Canadarm2.[7][8] | |
376 | 1 March 11:52 |
5 hours, 38 minutes | 17:30 | Expedition 42 ISS Quest |
Finished cable routing, antenna and retro-reflector installation on both sides of the ISS truss and on other modules in preparation for the installation of the International Docking Adapter at PMA-2 and 3.[9][10] | |
377 | 10 August 14:20 |
5 hours, 31 minutes | 19:51 | Expedition 44 ISS Pirs |
Installed gap spanners on the hull of the station for facilitating movement of crew members on future spacewalks, cleaned windows of the Zvezda Service Module, installed fasteners on communications antennas, replaced an aging docking antenna, photographed various locations and hardware on Zvezda and nearby modules, and retrieved a space environment experiment.[11][12] | |
378 | 28 October 12:03 |
7 hours, 16 minutes | 19:19 | Expedition 45 ISS Quest |
Prepared a Main Bus Switching Unit for repair, installed a thermal cover on the Alpha Magnetic Spectrometer, lubricated elements of the Space Station Remote Manipulator System, and routed data and power cables to prepare for the installation of the International Docking Adaptor at PMA-2 and 3.[13] | |
379 | 6 November 11:22 |
7 hours, 48 minutes | 19:10 | Expedition 45 ISS Quest |
Worked to restore a portion of the ISS's cooling system to its primary configuration, returning ammonia coolant levels to normal in the primary and backup radiator arrays.[14] | |
380 | 21 December 13:45 |
3 hours, 16 minutes | 16:01 | Expedition 46 ISS Quest |
Released a brake on the Mobile Servicing System to allow it to be properly stowed prior to the arrival of a visiting Progress vehicle. Routed cables in preparation for the installation of the Nauka module and the International Docking Adapter, and retrieved tools from a toolbox.[15] |
2016 spacewalks
[edit]# | Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|---|
381 | 15 January 13:48 |
4 hours, 43 minutes | 18:31 | Expedition 46 ISS Quest |
Replaced a failed voltage regulator responsible for shutting down one of the station's eight power channels in November 2015, and routed cables in support of the installation of the International Docking Adaptor. EVA terminated two hours, early due to water leakage in Kopra's helmet, but the primary task was accomplished.[16] | |
382 | 3 February 12:55 |
4 hours, 45 minutes | 17:40 | Expedition 46 ISS Pirs |
Deployed a commemorative flash drive, took samples of module exteriors, installed handrails for use in future EVAs, retrieved an astrobiology experiment, deployed a materials science experiment, and tested a tool for applying coatings to module exteriors.[17] | |
383 | 19 August 12:04 |
5 hours, 58 minutes | 18:02 | Expedition 48 ISS Quest |
The astronauts installed the International Docking Adapter (IDA) which was delivered by Dragon CRS-9, allowing future commercial crew spacecraft to dock with the station. This first IDA was attached to Harmony's forward port, over the existing Pressurized Mating Adapter (PMA).[18][19] The EVA terminated after completing the primary objective, without completing the secondary objectives, due to a malfunction of the right earphone of Jeff Williams. | |
384 | 1 September 11:53 |
6 hours, 48 minutes | 18:41 | Expedition 48 ISS Quest |
The crew retracted a thermal radiator which is a backup, and then installed the first pair of several high definition cameras to monitor the traffic around the station. Then they performed some maintenance operations.[20] |
2017 spacewalks
[edit]Source:[21]
# | Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|---|
385 | 6 January 12:23 |
6 hours, 31 minutes | 18:54 | Expedition 50 ISS Quest |
The crew completed the installation of new batteries on the Station's power channel 3A, and then executed a series of tasks to get ahead for the next EVA. Kimbrough collected photos of the AMS-02, then they removed a broken light on the S3 truss and routed Ethernet cables on the Z1 truss. | |
386 | 13 January 11:22 |
5 hours, 58 minutes | 17:20 | Expedition 50 ISS Quest |
The crew completed the installation of new batteries on the Station's power channel 1A, and then executed a series of get ahead tasks. First they installed a new camera on the Mobile Transporter Relay Assembly, then Pesquet replaced a Worksite Interface Adapter on Canadarm-2 and collected photos of Z1 truss and S0 truss, meanwhile Kimbrough removed 2 handrails from the Destiny module. Then they picked up a bundle of covers and brought them to the Tranquillity module where will be installed when Pressurized Mating Adapter 3 will be moved from Node 3 to Node 2. When removed, the PMA's Common Berthing Mechanism will be covered up to protect it from the space environment. | |
387 | 24 March 11:24 |
6 hours, 34 minutes | 17:58 | Expedition 50 ISS Quest |
Kimbrough replaced the External Control Zone 2 (EXT-2) Multiplexer-Demultiplexer (MDM) with an upgraded "EPIC MDM" and prepared PMA-3 for its robotic relocation on Sunday. Pesquet inspected the Radiator Beam Valve Module for ammonia leaks, then lubricated one of the Latching End Effectors of Dextre. Kimbrough then replaced a pair of cameras on the Kibo module, and a light on one of the CETA carts. | |
388 | 30 March 11:29 |
7 hours, 4 minutes | 18:33 | Expedition 50 ISS Quest |
Kimbrough replaced the External Control Zone 1 (EXT-1) Multiplexer-Demultiplexer (MDM) with an upgraded "EPIC MDM" while Whitson connected heater power and heater feedback telemetry to enable PMA-3 to be repressurized, then released a series of straps to free up a cover that protected the APAS. The astronauts then installed 4 axial shields on PMA-3's former location on Tranquillity module and installed covers on PMA-3. | |
389 | 12 May 13:01[22] |
4 hours, 13 minutes | 17:21 | Expedition 51 ISS Quest |
| |
390 | 23 May 11:20[23] |
2 hours, 46 minutes | 14:06 | Expedition 51 ISS Quest |
Throughout this hurriedly planned ‘contingency’ spacewalk, both Fischer and Whitson successfully replaced a failed multiplexer-demultiplexer (MDM), and installed a pair of antennas on station to enhance wireless communication for future spacewalks.[24] | |
391 | 17 August 14:36[25] |
7 hours, 34 minutes | 22:10 | Expedition 52 ISS Pirs |
||
392 | 5 October 12:05 |
6 hours, 55 minutes | 19:00 | Expedition 53 ISS Quest |
||
393 | 10 October 11:56 |
6 hours, 26 minutes | 18:22 | Expedition 53 ISS Quest |
| |
394 | 20 October 11:47 |
6 hours, 49 minutes | 18:36 | Expedition 53 ISS Quest |
2018 spacewalks
[edit]Source:[26]
# | Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|---|
395 | 23 January 11:49 |
7 hours, 24 minutes | 19:13 | Expedition 54 ISS Quest |
| |
396 | 2 February 15:34 |
8 hours, 13 minutes | 23:47 | Expedition 54 ISS Pirs |
| |
397 | 16 February 12:00 |
5 hours, 57 minutes | 17:57 | Expedition 54 ISS Quest |
||
398 | 29 March 13:33 |
6 hours, 10 minutes | 19:43 | Expedition 55 ISS Quest |
| |
399 | 16 May 11:39 |
6 hours, 31 minutes | 18:10 | Expedition 55 ISS Quest |
| |
400 | 14 June 13:06 |
6 hours, 49 minutes | 19:55 | Expedition 56 ISS Quest |
| |
401 | 15 August 16:17 |
7 hours, 46 minutes | 00:03 on 16 August | Expedition 56 ISS Pirs |
||
402 | 11 December 15:59 |
7 hours, 45 minutes | 21:44 | Expedition 57 ISS Pirs |
|
2019 spacewalks
[edit]# | Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|---|
403 | 22 March 12:01 |
6 hours, 39 minutes | 18:40 | Expedition 59 ISS Quest |
||
404 | 29 March 11:42 |
6 hours, 45 minutes | 18:27 | Expedition 59 ISS Quest |
||
405 | 8 April 11:31 |
6 hours, 29 minutes | 18:00 | Expedition 59 ISS Quest |
| |
406 | 29 May 15:42 |
6 hours, 1 minute | 21:43 | Expedition 59 ISS Pirs |
| |
407 | 21 August 12:27 |
6 hours, 32 minutes | 18:59 | Expedition 60 ISS Quest |
Hague and Morgan installed the final International Docking Adapter on the Harmony Module. Task for this spacewalk was identical to Spacewalk 194 and required work by both spacewalkers and Dextre to get the docking port installed in preparation for its test by the Boeing CST-100 Starliner which will occur at the end of October. The crew also routed cables and installed Wi-Fi routers for upcoming experiments.[34] | |
408 | 6 October 11:39 |
7 hours, 1 minute | 18:40 | Expedition 61 ISS Quest |
This spacewalk was the first of Expedition 61 and the first of a series of 5 to replace and improve ISS batteries on the P6 truss.[35] | |
409 | 11 October 11:38 |
6 hours, 45 minutes | 18:23 | Expedition 61 ISS Quest |
This spacewalk was the second of Expedition 61 and the second of a series of 5 to replace and improve ISS batteries on the P6 truss. Before they went out the hatch Mission Control Moscow relayed to the crew Alexei Leonov had passed away and this spacewalk is dedicated to him. As the crew came in and took off their suits each gave a choice of words before station commander Luca Parmitano said "Farewell Alexei, and ad astra."[36][37] | |
410 | 18 October 11:38 |
7 hours, 17 minutes | 18:55 | Expedition 61 ISS Quest |
This spacewalk was to be the third of Expedition 61 and the third of a series of five to replace and improve ISS batteries on the P6 truss. Some of the battery swaps were delayed to EVA 222 because of a failure in a Battery Charge Discharge Unit on the P6 Truss taking the 4B battery channel partially offline. Koch and Meir replaced the failed unit and brought it inside. They wrapped up the spacewalk by installing a stanchion on the Columbus Module and routing a cable on the Destiny Lab module.[38] This was the first all-female spacewalk. During the spacewalk President Trump called the station and congratulated Koch and Meir on this milestone.[39] | |
411 | 15 November 11:39 |
6 hours, 39 minutes | 18:18 | Expedition 61 ISS Quest |
First of a series of four spacewalks to repair the Alpha Magnetic Spectrometer which suffered a power failure last year in one of its four cooling pumps limiting the operation of the experiment. Parmitano and Morgan went outside and removed a cover plate from AMS and jettisoned it into space to make way for a cryo pump that they will assemble between spacewalks. Some of the bolts put up a fight but Parmitano got them all out. The highlight of the spacewalk is when Andrew Morgan threw the cover plate overboard and it drifted off aft of the station into the vacuum of space. The plate will stay in orbit for a few days until the end of December when it enters the atmosphere and burns up. The crew also removed several carbon fiber strips around fluid lines and installed handrails and grapple bars as get-ahead task.[40] | |
412 | 22 November 12:02 |
6 hours, 33 minutes | 18:35 | Expedition 61 ISS Quest |
The second in a series of four spacewalks to repair the AMS. Parmitano and Morgan cut fluid lines and installed a vent on the AMS Experiment to prep the old cooling pump for removal on the third spacewalk. Parmitano and Morgan also routed cables and installed a new power supply to power the pumps when they are installed on the third spacewalk.[41] | |
413 | 2 December 11:31 |
6 hours, 2 minutes | 17:33 | Expedition 61 ISS Quest |
The third in a series of four spacewalks to repair the AMS. Parmitano and Morgan went out on the third spacewalk and installed the cryo pump and routed fluid and electrical lines to power the pump. Flight controllers in Houston, Huntsville, and at CERN activated the experiment and radioed to the crew that AMS passed with flying colors. The crew finished the spacewalk by doing a get-ahead task by covering AMS with thermal blanket.[42] |
-
Jessica Meir during first all female spacewalk in history on October 18, 2019
2020–2024 spacewalks
[edit]Spacewalk beginning and ending times are given in Coordinated Universal Time (UTC).
2020 spacewalks
[edit]# | Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|---|
414 | 15 January 11:35 |
7 hours, 29 minutes | 19:04 | Expedition 61 ISS Quest |
The fourth in a series of five spacewalks to replace the batteries on the P6 Truss. Spacewalk suffered a 15- minute delay when Koch lost her helmet lights and camera. Meir managed to attach a hook onto the camera to prevent it from floating away and stowed it in Koch's tool bag. The spacewalkers managed to replace two batteries plus a third as a getahead task and had to stay in signal range of the WETA antennas so Meir could check on Koch at night who did not have any helmet lights. The spacewalkers will replace the camera between spacewalks and will head back out to replace the final three batteries on the next spacewalk.[43] | |
415 | 20 January 11:35 |
6 hours, 58 minutes | 18:33 | Expedition 61 ISS Quest |
The fifth and final in a series of five spacewalks to replace the batteries on the P6 Truss. Koch and Meir managed to get all the batteries replaced and stored two old ones on the exposed pallet to return to earth on HTV-9 where they will be incinerated on reentry. Koch and Meir finished the day by sending down a message to commemorate Martin Luther King Jr. Day. This spacewalk moved Koch up to third place and Meir up to fourth place on the all-time female spacewalker list.[44] | |
416 | 25 January 12:04 |
6 hours, 16 minutes | 18:20 | Expedition 61 ISS Quest |
The fourth and final in a series of four spacewalks to repair the AMS. Spacewalk suffered a 10- minute delay when a strap got stuck in the hatch preventing depressurization of the airlock. The two spacewalkers completed all the task and at 17:30 hours, Luca Parmitano opened a valve to start the flow of CO2 gas to AMS and contacted CERN to turn the experiment on. AMS passed all test and worked flawlessly. A leak was found in a cooling line but Parmitano patched it and the spacewalk resumed without incident. As a getahead task Parmitano and Morgan cleaned and replaced glare filters on the NASA TV cameras used to film the spacewalk.[45] | |
417 | 26 June 11:32 |
6 hours, 7 minutes | 17:39 | Expedition 63 ISS Quest |
Behnken and Cassidy removed five of six nickel-hydrogen batteries for one of two power channels for the starboard 6 (S6) truss, installed two of three new lithium-ion batteries, and installed two of three associated adapter plates that are used to complete the power circuit to the new batteries.[46] | |
418 | 1 July 10:13 |
6 hours, 1 minute | 16:14 | Expedition 63 ISS Quest |
Behnken and Cassidy removed the last of six nickel-hydrogen batteries for disposal. They also connected the last of the three lithium-ion batteries and its adapter plate to complete the circuit to the new battery for the starboard 6 (S6) truss.[47] | |
419 | 16 July 11:10 |
6 hours | 17:10 | Expedition 63 ISS Quest |
Cassidy and Behnken replaced batteries that provide power for the International Space Station's solar arrays on the starboard truss of the complex. They removed six aging nickel-hydrogen batteries, and installed three new lithium-ion batteries that are more efficient. This work nearly completes a three-and-a-half-year effort to upgrade the International Space Station's power system.[48] | |
420 | 21 July 11:12 |
5 hours, 29 minutes | 16:41 | Expedition 63 ISS Quest |
Cassidy and Behnken installed a protective housing with two robotic external leak locator units (RELL). They also removed two lifting fixtures at the base of the station's solar arrays. They then prepared for the installation of the Nanorax airlock, arriving in November. Finally, they routed Ethernet cables and removed a lens filter cover from an external camera.[49] | |
421 | 18 November 15:12 |
6 hours, 47 minutes | 21:59 | Expedition 64 ISS Poisk |
The first spacewalk from the Poisk module. Ryzhikov and Kud-Sverchkov completed the first set of tasks to prepare for the decommissioning, undocking, and disposal of the Pirs module, and for the arrival of a new Russian research module called Nauka. The work completed included an attempted replacement of a flow control regulator panel on the Functional Cargo Block (FGB) module, re-routing cables, retrieving hardware that measures space debris impacts, repositioning an instrument used to measure the residue from orientation thruster firings, and removing an experiment. The cosmonauts were unable to replace the flow control regulator panel because a bolt would not release on the transfer container of the new regulator.[50] |
2021 spacewalks
[edit]# | Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|---|
422 | 27 January 11:28 |
6 hours, 56 minutes | 18:24 | Expedition 64 ISS Quest |
Spacewalk to activate and install the Airbus Bartolomeo exposed experiment platform and the Columbus Ka band Terminal (COL-Ka) onto Columbus. Remove H fixtures from the P-6 Truss in preparation for installation of upgrades to the solar arrays. Due to issues with the installation of Bartolomeo, only four out of the six cables could be installed. The platform is "partially operational and in a safe configuration" according to NASA; the final two cables will be installed on a future spacewalk. | |
423 | 1 February 12:56 |
5 hours, 20 minutes | 18:16 | Expedition 64 ISS Quest |
US EVA-70. Spacewalk to replace batteries that store power from the station’s solar arrays and upgrade several of the station’s external cameras.[51] | |
424 | 28 February 11:12 |
7 hours, 4 minutes | 18:33 | Expedition 64 ISS Quest |
US EVA-71. Installation of a modification kit onto the 2B Mast Canister Assembly where a future Roll out solar array will be mounted.[52] | |
425 | 5 March 11:37 |
6 hours, 56 minutes | 18:33 | Expedition 64 ISS Quest |
US EVA-72. Installation of a modification kit onto the 4B Mast Canister Assembly where a future Roll Out Solar Array will be mounted.[52] | |
426 | 13 March 13:14 |
6 hours, 47 minutes | 20:01 | Expedition 64 ISS Quest |
US EVA-73. Spacewalk to service the station’s cooling system and communications gear.[53] | |
427 | 2 June 5:53 |
7 hours, 19 minutes | 13:12 | Expedition 64 ISS Poisk |
Decommissioning of Pirs module. It will be removed from the ISS no earlier than 17 July 2021 to make room for the new Nauka science module. First spacewalks for Novitsky and Dubrov.[54] | |
428 | 16 June 12:11 |
7 hours, 15 minutes | 19:26 | Expedition 65 ISS Quest |
US EVA-74. Installation of the new ISS Roll Out Solar Arrays (IROSA) delivered on CRS-22.[55] | |
429 | 20 June 11:42 |
6 hours, 28 minutes | 18:10 | Expedition 65 ISS Quest |
US EVA-75. Installation of the new ISS Roll Out Solar Arrays (IROSA) (continued).[55] | |
430 | 25 June 11:52 |
6 hours, 45 minutes | 18:37 | Expedition 65 ISS Quest |
US EVA-76. Installation of the second set of IROSAs.[56] | |
431 | 4 July 00:11 |
6 hours, 46 minutes | 06:57 | Shenzhou 12 TSS Tianhe |
First EVA from the Tiangong space station. The taikonauts tested an updated version of the Feitian space suit, completed installation of the station's robotic arm, and installed exterior equipment for use on future missions, including a camera lifting bracket..[57][58] | |
432 | 20 August 00:38 |
5 hours, 55 minutes | 06:33 | Shenzhou 12 TSS Tianhe |
Second EVA from the Tiangong space station. Taikonauts tested spacecraft equipment, installed a backup thermal control pump, and installed and raised panoramic camera D on the Tianhe core module.[59][60] | |
433 | 3 September 14:41 |
7 hours, 54 minutes | 22:35 | Expedition 65 ISS Poisk |
Integration of the new Nauka science module.[61] | |
434 | 9 September 14:51 |
7 hours, 25 minutes | 22:16 | Expedition 65 ISS Poisk |
Integration of the new Nauka science module (continued).[61] | |
435 | 12 September 12:15 |
6 hours, 54 minutes | 19:09 | Expedition 65 ISS Quest |
US EVA-77. Installation of a support bracket onto which a future solar array will be mounted.[62] | |
436 | 7 November 10:51 |
6 hours, 25 minutes | 17:16 | Shenzhou 13 TSS Tianhe |
Third EVA from the Tiangong space station. Taikonauts installed a dual-arm connector to the station's robotic arm along with testing EVA equipment. Wang Yaping became the first Chinese woman to perform an EVA.[63] | |
437 | 2 December 11:15 |
6 hours, 32 minutes | 17:47 | Expedition 66 ISS Quest |
US EVA-78. EVA to replace a faulty S-Band Antenna Subassembly (SASA).[64] | |
438 | 26 December 10:44 |
6 hours, 11 minutes | 16:55 | Shenzhou 13 TSS Tianhe |
Fourth EVA from the Tiangong space station. Taikonauts deployed panoramic camera C, installed a foot restraint platform, and tested various methods of moving objects outside the station.[65] |
2022 spacewalks
[edit]# | Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|---|
439 | 19 January 12:17 |
7 hours, 11 minutes | 19:28 | Expedition 66 ISS Poisk |
Spacewalk to configure Prichal to support visiting vehicles. The EVA (Russian EVA-51) was the first of six spacewalks over 2022 to fully integrate Nauka into the ISS.[66] | |
440 | 15 March 12:11 |
6 hours, 54 minutes | 19:06 | Expedition 66 ISS Quest |
First spacewalk to install the IROSA mounting brackets on the S4 Truss. Tasks included installing the struts, mounting brackets, and triangles at the 3A Array in preparation for the delivery of the IROSA solar arrays on SpaceX CRS-25 at the end of May. The astronauts also tied back insulation on S6 so Dextre can replace the Battery Charge Discharge Modules at this location which has shown signs of decay and will be replaced at a later date. As a get ahead the astronauts photographed a worn keel pin cover which has come loose on one of the pins that were used to secure the airlock in the shuttle bay when it was launched.[67][68][69] | |
441 | 23 March 12:32 |
6 hours, 54 minutes | 19:26 | Expedition 66 ISS Quest |
The astronauts will install and vent ammonia jumpers on the P1 Truss and reposition a radiator beam valve module which has been giving them trouble. The astronauts will also route cables, install cable clamps on the Bartolomeo platform, tie back thermal insulation on the Kibo Exposed Facility Berthing Mechanism, break torque on the P4 electronics boxes, replace Camera 8 on the truss which has a bad filter and light, outfit the radiator grapple bars for a future spacewalk, and also do other maintenance task outside the station.[70] | |
442 | 18 April 15:01 |
6 hours, 37 minutes | 21:37 | Expedition 67 ISS Poisk |
Third spacewalk in a series to activate Nauka and Prichal and to commission ERA. During the spacewalk the cosmonauts will remove covers and install electrical cables so ERA can be activated at the end of the spacewalk. They will also install handrails, experiments, and work platforms outside, and break torque on bolts that secure ERA to the lab.[71] | |
443 | 28 April 14:58 |
7 hours, 42 minutes | 22:40 | Expedition 67 ISS Poisk |
Oleg Artemyev Denis Matveev |
Fourth spacewalk in a series to activate Nauka and Prichal and to commission ERA. During the spacewalk the cosmonauts jettisoned thermal covers, released launch locks, and walked off the arm to its stowage point at worksite 2 on the forward face of the lab where it was latched in place. Because of time they did not release the grapple at worksite 1 and the arm is bent over the solar arrays. The cosmonauts also installed handrails on Nauka and the arm and deployed a banner for Victory Day on the side of the station. ERA will be checked out inside before it moved remotely to its grapple point at worksite 3 where it will be secured until the next spacewalk when it will be moved to worksite 4. During the spacewalk a cable got snagged which was deployed during EVA 50 back in January which caused issues with the KURS antennas on Prichal which forced Soyuz MS-21 to be flown in manually. Artemyev tied down the cables with wire ties and the antenna was redeployed into a safe configuration.[71][72][73][74][75] |
444 | 21 July 14:50 |
7 hours, 5 minutes | 21:55 | Expedition 67 ISS Poisk |
Oleg Artemyev Samantha Cristoforetti |
Russian cosmonaut Oleg Artemyev and Italian astronaut Samantha Cristoforetti worked on the ERA robotic arm as part of the work scheduled to commission the Nauka module and robotic arm. They launched two Tsiolkovsky-Ryazan (No. 1-2) and eight YUZGU-55 (No. 5-12) satellites, installed an ERA grapple point on Poisk to facilitate future relocation of the experiment airlock on the next spacewalk, translated a work platform over to Nauka, reconfigured ERA and set the control panel from grapple mode to stowed, replaced a camera port window on ERA that prevented grappling on the previous spacewalk, replaced MLI blankets on Nauka that were knocked loose by the thruster firings when the module arrived, and installed retainers on Strela 1 on Poisk. The final task to relocate Strela 2 on Zarya over to Poisk and install its retainer was deferred to the next spacewalk because they ran out of time and they had a late start. Cristoforetti become the first female European astronaut to perform a spacewalk, and only the third woman to perform a spacewalk using the Russian Orlan spacesuit (after Svetlana Savitskaya and Peggy Whitson).[76][77][78][79] |
445 | 17 August 13:53 |
4 hours, 1 minute | 17:54 | Expedition 67 ISS Poisk |
Oleg Artemyev Denis Matveev |
Sixth spacewalk in a series to outfit Nauka and to prepare the Russian Segment for module transfers which will take place in the fall. The primary task to install cameras on the elbow joint was completed on time and both cameras passed their telemetry checkouts. The final tasks to relocate the ERA control panel, set the arm back to "grapple mode", and remove the launch rings from the wrist of ERA will be moved to the next spacewalk. Artemyev was in the process of removing the launch ring at worksite 2 from ERA when he suffered a voltage drop in his spacesuit batteries. Mission Control Moscow ordered him back inside the airlock where he connected to internal power to recharge his suit. Because they were ahead and then behind the timeline, in light of the battery issue Mission Control Moscow gave the order to terminate the EVA at 16:34 GMT and the spacewalk concluded at 17:54 GMT, 4 hours, and 1 minute into the spacewalk.[80] Artemyev was never in any danger and they will be replacing the battery before the next spacewalk. Because of the early EVA termination, the getahead task to relocate Strela 2 over to Poisk was also moved to the next spacewalk along with the other tasks.[81][82][83][84] |
446 | 1 September, 10:26 |
6 hours, 7 minutes | 16:33 | Shenzhou 14 TSS Wentian |
Chen Dong Liu Yang |
Fifth EVA from the Tiangong space station and first EVA from Wentian's airlock. Taikonauts installed an extended pump set on the exterior of Wentian, raised panoramic camera B, installed an exterior workbench, and tested procedures for an emergency return to the station.[85] |
447 | 2 September 13:25 |
7 hours, 47 minutes | 21:12 | Expedition 67 ISS Poisk |
Oleg Artemyev Denis Matveev |
Seventh in a series of spacewalks to outfit Nauka and to prepare ERA for operations. The spacewalkers completed the task that were moved from the previous two spacewalks and installed two payload adapters on Nauka. Because of time and the lack of consumables the task to break torque on bolts that secure the airlock and the radiator to Rassvet was deferred to the next spacewalk. This was the longest EVA of Expedition 67 and the final one of this mission.[86][87][88] |
448 | 17 September 05:35 |
4 hours, 12 minutes | 09:47 | Shenzhou 14 TSS Wentian |
Chen Dong Cai Xuzhe |
Sixth EVA from the Tiangong space station. Taikonauts completed the installation of foot restraints and extravehicular workbenches with support from the station's small robotic arm, performed further work on the extended pump set, and further verified EVA emergency rescue procedures.[89] |
449 | 15 November 14:14 |
7 hours, 11 minutes | 21:25 | Expedition 68 ISS Quest |
Josh Cassada Frank Rubio |
Cassada and Rubio installed the final IROSA mounting bracket on the S6 Truss at Array 1B. As part of get-ahead tasks, they prepared the 3A mounting bracket at P4 for the delivery of 2 IROSAs on the 18th and routed cables along the truss to be mated at the end of EVA 3. Because of time the they did not install the slip collars on S6 and the cable routing was partly completed. The S6 cables will be routed on a later spacewalk when IROSA arrives.[90][91][92] |
450 | 17 November 03:16 |
5 hours, 34 minutes | 08:50 | Shenzhou 14 TSS Wentian |
Chen Dong Cai Xuzhe |
Seventh EVA from the Tiangong space station. Taikonauts installed an inter-chamber connection device between Tianhe and Mengtian, raised panoramic A on Wentian, and installed a small mechanical arm power-assisted handle.[93] |
451 | 17 November 14:39 |
6 hours, 25 minutes | 21:07 | Expedition 68 ISS Quest |
Eighth in a series of spacewalks to outfit Nauka and to prepare ERA for operations. The spacewalkers change a grapple fixture so the airlock can be used as a base point for the arm, broke torque on bolts that secure the airlock and radiator to Rassvet, removed launch restraints from the radiator, vented nitrogen jumpers, replaced a retainer on Strela 2 with one that has a stop, and transferred a MLM outfitting work platform called the SKKO that is, the Nauka Means of attachment of large payloads over to Nauka and installed it at the ERA base point facing aft where ERA use to be when it was launched.[94][95][96] | |
452 | 3 December 12:16 |
7 hours, 5 minutes | 19:21 | Expedition 68 ISS Quest |
Assisted by Canadarm 2, Cassada and Rubio installed an IROSA at Array 3A and connected it to the US power system. The spacewalkers undid bolts and installed cables and at 17:37 GMT the array was deployed and is receiving power. As part of get-ahead tasks, they prepared the 4A array for the next spacewalk, demated the 1B array, broke torque on the P4 electronic boxes, and installed cables along the truss to be mated at the end of EVA 5.[90] Spacewalk faced a delay when Cassada's suit did not power up. Troubleshooting steps were done and power was restored to Cassada's suit so they could continue the spacewalk. Nick Hague was ground IV.[97][98] | |
453 | 22 December 13:19 |
7 hours, 8 minutes | 20:27 | Expedition 68 ISS Quest |
Assisted by Canadarm 2, Rubio and Cassada will install the fourth IROSA at Array 4A. Tasks include releasing bolts, installing cables, and deploying the array and connecting it to the US power system. Once these task are complete Rubio and Cassada will stow the array stowage beams on the carrier and remove their foot restraints from the arm in perpetration for astronaut Nicole Mann to grapple the carrier and load it into the trunk of SpaceX CRS-26 for disposal. If they have time they will photograph Soyuz MS-22 which has suffered a cooling leak in its primary radiator.[90] |
2023 spacewalks
[edit]# | Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|---|
454 | 20 January 13:14 |
7 hours, 21 minutes | 20:35 | Expedition 68 ISS Quest |
First spacewalk of 2023 to finish installation of the IROSA mounting brackets on the starboard side of the station. Wakata and Mann installed cables on the 1B Array at the S6 truss, which was not completed on the last spacewalk, tightened bolts and installed a terminator on a cable along with its connected jumper on the SSDCDC converter box to isolate the 1B array until the IROSA solar arrays are installed following the arrival of SpaceX CRS-28 in June. They also assembled and installed the IROSA mounting bracket onto the 1A array, which was also left incomplete on the last spacewalk. Wakata and Mann were unable to secure the final strut on the 1A solar array because of debris in the guide track of the mounting pad and only one of the jumpers was installed. The astronauts returned the strut to the Quest Airlock and will use special tools to clean the tracks before it is remounted on the next spacewalk. They were also unable to connect the cables for 1A due to time constraints. NASA astronaut Zena Cardman was Ground IV, assisted by JAXA astronaut Akihiko Hoshide, who was the Capcom for the astronauts inside the ISS during the spacewalk.[99][100][101] | |
455 | 2 February 12:45 |
6 hours, 41 minutes | 19:26 | Expedition 68 ISS Quest |
Final spacewalk to install the mounting brackets for the 1A solar array in preparation for the delivery of IROSA on SpaceX CRS-28. Tasks included installing the final strut, securing the bolts on the 1A solar array, relocating foot restraints that were left on P6 inboard, and routing cables. NASA astronaut Zena Cardman was Ground IV.[102][103] | |
456 | 9 February 9:10 |
7 hours, 6 minutes | 16:16 | Shenzhou 15 TSS Wentian |
Eighth EVA from the Tiangong space station. Tasks included the installation of a fourth external pump (Z01-04) on Mengtian and other tasks related to Mengtian's payload airlock.[104] | |
457 | 2 March ~09:00 |
~7 hours, 49 minutes | ~16:50 | Shenzhou 15 TSS Wentian |
Ninth EVA from the Tiangong space station. Tasks completed were not revealed publicly and no announcement was given prior to the spacewalk. Rumors suggest it took place on February 28, but no date was officially given.[104] Taikonauts installed electrical equipment, according to some Chinese-language sources.[5] | |
458 | 30 March ~09:00 |
~7 hours, 30 minutes | ~16:30 | Shenzhou 15 TSS Wentian |
Tenth EVA from the Tiangong space station. Tasks completed were not revealed publicly and no announcement was given prior to the spacewalk. Rumors suggest it took place on March 30, but no date was officially given. Taikonauts installed and connected cables across the cabin.[104][5] | |
459 | 15 April ~09:00 |
~7 hours, 30 minutes | ~16:30 | Shenzhou 15 TSS Wentian |
Eleventh EVA from the Tiangong space station. Tasks completed were not revealed publicly and no announcement was given prior to the spacewalk. Rumors suggest it took place on 15 April, but no date was officially given. Taikonauts disposed of trash bags, completed the installation of the fifth extended pump (Z02-01) set on Mengtian, installed and connected cross-cabin cables, and installed the external load exposure platform and support brackets for later science and technology experiments.[104][5] | |
460 | 19 April 01:40 |
7 hours, 55 minutes | 09:35 | Expedition 69 ISS Poisk |
Ninth in a series of spacewalks to outfit Nauka and to prepare ERA for operations. The spacewalkers used ERA to pick up the radiator with the arm where it was relocated at the end of the spacewalk. They spacewalkers closed valves on the nitrogen jumpers, removed covers over the nitrogen jumpers, disconnected the radiator heater cable and capped it, removed bolts and launch restraints, and transferred the radiator over to Nauka and installed it into a socket on the forward face where it will be deployed at the end of EVA 4. As part of get-ahead tasks, they will prepared the airlock for transfer to Nauka on the next spacewalk and stowed the ERA adapter on the airlock. Because of time and issues with matting the radiator the task to jettison the covers was moved to the next spacewalk. This was the longest spacewalk of this expedition and a critical one to get the lab activated.[105] | |
461 | 28 April 13:11 |
7 hours, 1 minute | 20:12 | Expedition 69 ISS Quest |
Bowen and Al Neyadi, who become the first Arab astronaut to perform a spacewalk, finished routing cables and secured the struts with MLI at the 1B and 1A solar arrays in preparation for the arrival of the IROSA arrays in June. The primary task to retrieve the Space to Ground Antenna (SASA) was deferred to the next spacewalk because a stuck bolt on the electronics box prevented the antenna from being released from the FRAM. NASA Astronaut Anne McClain was Ground IV CAPCOM.[106][107][108] | |
462 | 4 May 20:00 |
7 hours, 11 minutes | 03:11 | Expedition 69 ISS Poisk |
Tenth in a series of spacewalks to outfit Nauka and to prepare ERA for operations. The spacewalkers removed bolts, removed covers, disconnected cables, and used ERA to transfer the airlock over to Nauka where it was installed on the forward facing port. Once the airlock was installed they mated cables and jettisoned their trash which included hardware and covers from the previous spacewalks and this spacewalk. Spacewalk faced a delay when ERA entered an uncontrolled roll placing the airlock out of alinement. Prokopyev and Petelin improvised with a little elbow grease and got the airlock rotated into the correct position and got it latched in place. Spacewalk faced another delay when tape was found on the electrical connectors requiring Prokopyev to cut it before the cables were connected.[109][110][111][112] | |
463 | 12 May 15:47 |
5 hours, 14 minutes | 23:01 | Expedition 69 ISS Poisk |
Eleventh and final spacewalk to outfit Nauka and to prepare ERA for operations. To wrap up work on Nauka, the cosmonauts deployed the radiator, and installed nitrogen and ammonia jumpers to cool the Russian Segment and connected the radiator to electrical power, hydraulics, and mechanical connections. As a getahead task while the radiator was being filled with coolant the cosmonauts installed gap spanners on ERA's boom to allow for translation on future spacewalks.[113][114] | |
464 | 9 June 13:15 |
6 hours, 3 minutes | 19:18 | Expedition 69 ISS Quest |
NASA astronauts Steve Bowen and Woody Hoburg exited the station’s Quest airlock and installed an upgraded IROSA (International Space Station Roll-Out Solar Array) on the 1A power channel on the starboard truss of the station. Tasks included removing bolts, deploying the rollers, and installing cables before the solar array was picked up by Hoburg with assistance from Canadarm 2 and installed on the 1A solar array on the S4 Truss. The array was deployed at 16:32 hours, and is receiving power.[115][116] | |
465 | 15 June 12:42 |
5 hours, 35 minutes | 18:17 | Expedition 69 ISS Quest |
NASA astronauts Steve Bowen and Woody Hoburg exited the station’s Quest airlock to install the final upgraded IROSA (International Space Station Roll-Out Solar Array) on the 1B power channel on the starboard truss of the station. Tasks included removing bolts, deploying the rollers, and installing cables before the solar array was picked up by Hoburg with assistance from Canadarm 2 and installed on the 1B solar array on the S6 Truss. The array was deployed at 16:51 hours, and is receiving power. As part of getahead task they covered the cables in MLI and secured the struts, relocated their foot restraints inboard, and stowed the support beams on the flight support structure for disposal.[117][118] | |
466 | 22 June 14:24 |
6 hours, 24 minutes | 20:48 | Expedition 69 ISS Poisk |
Prokopyev and Petelin exited the Poisk airlock and routed an Ethernet cable to the port experiment frame on the Zvezda Service Module, jettisoned experiment hardware including the TMTC Monoblock antennas, the highspeed data transmission antenna, and the Seismo Prognos payload, installed a data transmission radio onto the port frame, removed experiments from the Zvezda Service Module, photographed Zvezda including the thrusters so they can patch the leak, inspected an antenna, and retrieved the Biorisk containers. As a getahead they cleaned the windows on the Russian segment, repositioned the Plume Measurement Unit, and jettisoned a towel.[119][120] | |
467 | 20 July 05:45 |
7 hours, 55 minutes | 13:40 | Shenzhou 16 TSS Wentian |
Twelfth EVA from the Tiangong space station. Taikonauts installed & lifted the bracket for Tianhe panoramic camera B and unlocked & lifted panoramic camera A/B on Mengtian. Zhu Yangzhu became first Chinese flight engineer to conduct an extravehicular activity.[121] The EVA set a new duration record for a Chinese spacewalk. | |
468 | 9 August 14:44 |
6 hours, 35 minutes | 21:19 | Expedition 69 ISS Poisk |
Twelfth and final spacewalk to outfit Nauka and to prepare ERA for operations. Both cosmonauts ventured outside the station’s Poisk Airlock to attach three debris shields to the Rassvet module. They also tested the sturdiness of the last MLM outfitting called the ERA portable workpost, that will be affixed to the end of the European robotic arm attached to the Nauka multipurpose laboratory module.[122][123][124] | |
469 | 25 October 17:49 |
7 hours, 41 minutes | 01:30 (next day) | Expedition 70 ISS Poisk |
The cosmonauts ventured outside and installed a mini radar experiment on Nauka, launched a CubeSat which will test solar sails, and photographed the RTOd radiator and closed valves to isolate the radiator and vented residual coolant so plans can be done to fix a leaking cooling line that delayed two US spacewalks. During one of the vents, Kononenko got sprayed and the coolant got on one of his tethers. The tether was placed in a trash bag and stowed externally to decontaminate it, while Kononenko's suit was wiped down to prevent coolant from entering the station. During the radar deployment, one of the hinges got stuck. The cosmonauts will go out on the next spacewalk with a pole and lock the hinges so it can be deployed. During the satellite deployment, the telescoping booms did not come out and ground controllers are working to manually deploy them so the satellite can track the sun.[125][126][127] | |
470 | 1 November 12:05 |
6 hours, 42 minutes | 18:47 | Expedition 70 ISS Quest |
Moghbeli and O'Hara ventured outside and removed an H fixture from the 3B mass canister on the P4 truss in preparation for the arrival of the struts and the IROSA solar arrays in 2025. They also replaced a damaged Trundle Bearing under Cover 2 which had been giving them trouble in the past and greased the tracks before the new Trundle Bearing was installed on the port SARJ, secured a cable on Camera 8 which was shorting out a light used for dockings, and released wedge clamps on the SASA antenna. The primary task to retrieve the SASA antenna from ESP2 so it can be returned to Earth on SpaceX CRS-29 was moved to the next spacewalk because of issues removing the covers from the SARJ. O'Hara was not secured properly during the removal and had to be assisted by Moghbeli to get the cover stowed. During the spacewalk, the bag containing the grease gun was lost, but the tools were not needed and the bag posed no collision risk to the station. This was the fourth all-female spacewalk on the station, following Christina Koch and Jessica Meir's three spacewalks during Expedition 61.[128][129][130] | |
471 | 21 December 06:10 |
7 hours, 25 minutes | 13:35 | Shenzhou 17 TSS Wentian |
Thirteenth EVA from the Tiangong space station. Tasks included a repair test of the Tianhe core module's solar panels, which have sustained minor damage caused by impacts of space debris and micrometeoroids.[131] |
2024 spacewalks
[edit]# | Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|---|
472 | 1 March 21:30 |
7 hours, 52 minutes | 05:32 (next day) | Shenzhou 17 TSS Wentian |
Fourteenth EVA from the Tiangong space station. Tasks included maintenance of the solar panels of the Tianhe core module, which have sustained minor damage caused by impacts of space debris and micrometeoroids; evaluation and analysis of the performance status of the solar panel power generation and also inspection of the status of the space station modules.[132] | |
473 | 25 April 14:57 |
4 hours, 36 minutes | 19:33 | Expedition 71 ISS Poisk |
The cosmonauts ventured out and released launch locks on the Mini Radar Unit to get it deployed and installed a series of experiments TKK and Kvartz onto Poisk including a monoblock payload adapter and boom and photograph the Russian Segment.The Cosmonauts also repositioned the Plume Measurement Unit, removed an ion radiation probe and jettisoned it, and retrieved the Biorisk canisters for return to Earth. The cosmonauts also wiped down the handrails on Nauka and Poisk to check for microbial growth and contamination from the radiator leak and from visiting vehicles and hydrazine from Nauka's arrival.[133][134] | |
474 | 28 May 02:35 |
8 hours, 23 minutes | 10:58 | Shenzhou 18 TSS Wentian |
Longest Chinese spacewalk to date. Tasks included installing space debris protection devices and conducting inspections of extravehicular equipment and facilities.[135] | |
475 | 24 June 12:46 |
31 minutes | 13:17 | Expedition 71 ISS Quest |
Dyson and Barratt were intended to venture out and retrieve the SASA Antenna and bring it inside, collect samples from the station's hull to look for signs of microbial growth that could be present on the modules either after launch or exposed to space, and prep the LEE A Wrist Joint Replacement Module for installation on an upcoming spacewalk. However, the spacewalk was terminated shortly after depress due to a water leak in the service and cooling umbilical unit on Dyson’s spacesuit.[136] | |
476 | 3 July 08:20 |
6 hours, 31 minutes | 14:51 | Shenzhou 18 TSS Wentian |
Tasks included installing space debris protection devices and conducting inspections of extravehicular equipment and facilities. | |
477 | 12 September 10:44 |
32 minutes[137] | 11:17 | Polaris Dawn Crew Dragon Resilience |
|
Stand-up EVA to test the capability of Dragon and a new suit designed by SpaceX. Isaacman left the capsule for 7 minutes and 56 seconds followed by Gillis, who left the capsule for 7 minutes and 15 seconds.[138] The other two crew members were exposed to the vacuum of space in the capsule, but did not leave it. First all-private crew spacewalk with commercially developed hardware, procedures, and the EVA suit.[139] |
478 | 18 December 2024 04:51 |
9 hours, 6 minutes | 13:57 | Shenzhou 19 EVA 1 ^ |
Ye Guangfu Li Guangsu | |
The two astronauts completed the longest spacewalk in human history with the assistance of the space station's robotic arms and ground-based scientific personnel, completed tasks such as the installation of space debris protection devices, inspection, and maintenance of external equipment and facilities.[140] |
See also
[edit]Notes
[edit]References
[edit]- ^ a b McDowell, Jonathan (2024-09-12). "List of spacewalks". planet4589.org. Retrieved 2024-09-12.
- ^ William Harwood (2007). "Current Space Demographics". CBS News. Retrieved 2007-10-26.
- ^ National Aeronautics and Space Administration (2008-09-29). "Extravehicular Activities (EVA) Statistics Current as of 2/23/08". NASA Office of Space Operations. Archived from the original on August 8, 2007. Retrieved August 12, 2007.
- ^ Alexander, Anikeev (2006-09-11). "Manned astronautics: facts and figures". Archived from the original on 2006-09-08. Retrieved 2006-09-15.
- ^ a b c d "官方|神舟十五号乘组刷新中国航天员单个乘组出舱活动纪录 工程全线加紧备战空间站应用与发展阶段首次飞行任务". Weixin Official Accounts Platform. Retrieved 2023-04-16.
- ^ "First of Three Spacewalks Complete | Space Station". Blogs.nasa.gov. 2015-02-21. Retrieved 2015-04-04.
- ^ "Wilmore and Virts Begin Their Second Spacewalk". NASA. 2015-02-25. Retrieved 2015-02-25.
- ^ Pete Harding (2015-02-25). "EVA-30 concluded latest ISS commercial crew preparations". NASASpaceflight.com. Retrieved 2015-02-25.
- ^ "Spacewalkers Install C2V2 Cables". NASA. 2015-03-01. Retrieved 2015-03-01.
- ^ Chris Bergin (2015-03-01). "Spacewalkers install new comms system for future vehicles". NASASpaceflight.com. Retrieved 2015-03-01.
- ^ "Cosmonauts Complete Russian Spacewalk". NASA. 2015-08-10. Retrieved 2015-08-11.
- ^ David Štula (2015-08-10). "RS-41: Cosmonaut duo complete the only Russian spacewalk of 2015". NASASpaceflight.com. Retrieved 2015-08-11.
- ^ "NASA Astronauts Complete Their First Spacewalk – Space Station". blogs.nasa.gov. 28 October 2015.
- ^ "Pair of NASA Astronauts Wrap Up Second Spacewalk – Space Station". blogs.nasa.gov. 6 November 2015.
- ^ "Astronauts Make Quick Work of Short Spacewalk – Space Station". blogs.nasa.gov. 21 December 2015.
- ^ Garcia, Mark (2016-01-15). "Spacewalk Ends Early After Water Detected in Helmet | Space Station". Blogs.nasa.gov. Retrieved 2017-03-21.
- ^ Garcia, Mark (2016-02-03). "Second Spacewalk of Year Complete | Space Station". Blogs.nasa.gov. Retrieved 2017-03-21.
- ^ "Spacewalk Concludes After Commercial Crew Port Installation". NASA. 19 August 2016.
- ^ "First Commercial Crew Docking Port established aboard ISS in challenging Spacewalk". Spaceflight101. 19 August 2016.
- ^ "NASA TV to Air U.S. Spacewalk, Briefing | NASA". Nasa.gov. 22 August 2016. Retrieved 2017-03-21.
- ^ "Space Station Spacewalks". NASA. 20 October 2017. Retrieved 2 December 2017.
- ^ Clark, Stephen. "Astronauts complete shortened spacewalk outside International Space Station – Spaceflight Now".
- ^ Harwood, William. "Hurriedly planned 'contingency' spacewalk on tap Tuesday – Spaceflight Now".
- ^ "Short Spacewalk Complete After Successful Installation Work – Space Station". blogs.nasa.gov. 23 May 2017.
- ^ "Russian Spacewalkers Collect Overtime in Busy EVA for Satellite Release, Sampling & External Outfitting – Spaceflight101 – International Space Station". 17 August 2017.
- ^ "Space Station Spacewalks". NASA. 21 August 2018. Retrieved 23 August 2018.
- ^ "Spacewalkers Complete HD Camera Installation Work – Space Station". blogs.nasa.gov. 14 June 2018.
- ^ Clark, Stephen (August 15, 2018). "Spacewalkers toss nanosatellites into orbit, hook up bird migration monitor". Spaceflight Now. Retrieved August 23, 2018.
- ^ "Russian Spacewalkers Complete Crew Vehicle Inspection – Space Station". blogs.nasa.gov. 11 December 2018.
- ^ a b c "Spacewalkers Complete Battery Swaps for Station Power Upgrades – Space Station". blogs.nasa.gov. 22 March 2019. Retrieved 2019-03-30.
- ^ Weitering, Hanneke (March 22, 2019). "Spacewalking Astronauts Swap Space Station Batteries in Power Upgrade". Space.com. Retrieved March 29, 2019.
- ^ Weitering, Hanneke (March 29, 2019). "Spacewalking Astronauts Replace Old Batteries on Space Station". Space.com. Retrieved March 29, 2019.
- ^ "U.S. and Canadian Astronauts Wrap Up Power Upgrades Spacewalk – Space Station". blogs.nasa.gov. 8 April 2019. Retrieved 2019-04-09.
- ^ "Spacewalkers Complete Installation of Second Commercial Docking Port – Space Station". blogs.nasa.gov. 21 August 2019.
- ^ "First of Five Power Upgrade Spacewalks This Month Wraps Up – Space Station". blogs.nasa.gov. 6 October 2019.
- ^ "Second of Five Power Upgrade Spacewalks Wraps Up – Space Station". blogs.nasa.gov. 11 October 2019.
- ^ Malik, Tariq (11 October 2019). "Astronauts Mourn Alexei Leonov, the World's 1st Spacewalker, While On a Spacewalk of Their Own". Space.com.
- ^ Garcia, Mark (18 October 2019). "NASA Astronauts Wrap Up Historic All-Woman Spacewalk". NASA Space Station. NASA. Retrieved 21 November 2019.
- ^ Zraick, Karen (18 October 2019). "NASA Astronauts Complete the First All-Female Spacewalk". The New York Times. Retrieved 21 November 2019.
- ^ "Spacewalkers Complete First Excursion to Repair Cosmic Particle Detector – Space Station". blogs.nasa.gov. 15 November 2019. Retrieved November 15, 2019.
- ^ "Astronauts Complete Intricate Tasks During Second Cosmic Repair Spacewalk – Space Station". blogs.nasa.gov. 22 November 2019. Retrieved November 22, 2019.
- ^ "Astronauts Wrap Up Third Spacewalk for Cosmic Particle Detector Repairs – Space Station". blogs.nasa.gov. 2 December 2019. Retrieved December 2, 2019.
- ^ "Astronauts Wrap Up First Spacewalk of 2020 – Space Station". blogs.nasa.gov. 15 January 2020. Retrieved 2020-01-15.
- ^ "Meir, Koch Complete Battery Swaps to Upgrade Station Power Systems – Space Station". blogs.nasa.gov. 20 January 2020. Retrieved 2020-01-20.
- ^ "Astronauts Wrap Up Spacewalk Repair Job on Cosmic Ray Detector – Space Station". blogs.nasa.gov. 25 January 2020. Retrieved 2020-01-25.
- ^ "Cassidy and Behnken Conclude Spacewalk to Replace Batteries". 26 June 2020. Retrieved 30 June 2020.
- ^ "Cassidy and Behnken Wrap up Battery Spacewalk". nasa.gov. July 2020. Retrieved 5 July 2020.
- ^ "NASA Astronauts Conclude Today's Spacewalk". nasa.gov. 16 July 2020. Retrieved 21 July 2020.
- ^ "Behnken and Cassidy Conclude Ten Spacewalks Each". nasa.gov. 16 July 2020. Retrieved 21 July 2020.
- ^ "Cosmonauts complete first spacewalk to prepare for Nauka's arrival". nasaspaceflight.com. 18 Nov 2020.
- ^ "Astronauts complete second spacewalk to upgrade Space Station". www.nasaspaceflight.com. 1 February 2021. Retrieved 1 February 2021.
- ^ a b "Station power upgrade preparations continued with EVA-72". www.nasaspaceflight.com. 12 September 2021. Retrieved 12 September 2021.
- ^ "NASA Astronauts Complete Year's Fifth Spacewalk at Station". blogs.nasa.gov. 13 March 2021.
- ^ "Russian duo complete decommissioning of Pirs ahead of removal from Station". www.nasaspaceflight.com. 2 June 2021. Retrieved 2 June 2021.
- ^ a b "ESA/NASA complete ISS spacewalk to install first new solar array". www.nasaspaceflight.com. 20 June 2021. Retrieved 20 June 2021.
- ^ "Pesquet & Kimbrough complete new solar array installation on ISS". www.nasaspaceflight.com. 25 June 2021. Retrieved 25 June 2021.
- ^ "Chinese astronauts carry out country's second spacewalk". South China Morning Post. 4 July 2021. Retrieved July 4, 2021.
- ^ "Chinese astronauts complete first space walk outside new Tiangong space station". nbcnews.com. 4 July 2021. Retrieved July 4, 2021.
- ^ "神舟十二号航天员乘组圆满完成第二次出舱活动全部既定任务 计划9月中旬返回". xinhuanet.com. 20 August 2021.
- ^ "Astronauts conduct second Chinese space station spacewalk". SpaceNews. 20 August 2021.
- ^ a b "Russian cosmonauts begin series of spacewalks to integrate Nauka with the ISS". www.nasaspaceflight.com. 3 September 2021. Retrieved 3 September 2021.
- ^ "Astronauts finish spacewalk to prepare ISS for new solar arrays". www.nasaspaceflight.com. 12 September 2021. Retrieved 12 September 2021.
- ^ "China's Shenzhou-13 taikonauts complete first extravehicular mission". Xinhua News. 7 November 2021. Retrieved 7 November 2021.
- ^ "Astronauts complete spacewalk to replace faulty antenna". www.nasaspaceflight.com. 2 December 2021. Retrieved 2 December 2021.
- ^ Davenport, Justin (26 December 2021). "Shenzhou-13 crew conducts second spacewalk of mission". NASASpaceFlight.com. Retrieved 26 December 2021.
- ^ "Cosmonauts complete Russian spacewalk to integrate Prichal node". www.nasaspaceflight.com. 19 January 2022. Retrieved 19 January 2022.
- ^ Garcia, Mark (3 March 2022). "Spacewalks Preps Continue, NASA Astronaut Continues Record-Breaking Mission". blogs.nasa.gov. Retrieved 2022-03-04.
- ^ "Space Station – Off The Earth, For The Earth". blogs.nasa.gov. Retrieved 2022-03-15.
- ^ Lavelle, Heidi (15 March 2022). "NASA Astronauts Complete Spacewalk for Solar Array Work". blogs.nasa.gov. Retrieved 2022-03-15.
- ^ Dodson, Gerelle (2022-03-10). "NASA to Air Briefing, Spacewalks to Upgrade Space Station". NASA. Retrieved 2022-03-13.
- ^ a b Margetta, Robert (2022-04-13). "NASA Sets Coverage for Russian Spacewalks Outside Space Station". NASA. Retrieved 2022-04-14.
- ^ Garcia, Mark (28 April 2022). "Spacewalkers Exit Station to Activate New Robotic Arm". blogs.nasa.gov. Retrieved 2022-04-28.
- ^ "Cosmonauts Set Up Robotic Arm's First Motion, Wrap Up Spacewalk". blogs.nasa.gov. 28 April 2022. Retrieved 2022-04-28.
- ^ Rahman, Mahabubur (2022-04-28). "Russian cosmonauts deployed a copy of the Victory Banner in space". Oops Top. Retrieved 2022-04-28.
- ^ "The Astronaut Freed The Docking System Antenna Tangled In Wires". thenewsglory.com. 2022-04-29. Retrieved 2022-04-28.
- ^ "Space Station – Off The Earth, For The Earth". blogs.nasa.gov. Retrieved 2022-07-20.
- ^ "Экипаж МКС выйдет в открытый космос 21 июля" [The ISS crew will go into outer space on July 21]. www.roscosmos.ru (in Russian). Retrieved 9 July 2022.
- ^ Garcia, Mark (21 July 2022). "Spacewalkers Exit Station to Configure New Robotic Arm". blogs.nasa.gov. Retrieved 2022-07-21.
- ^ Garcia, Mark (21 July 2022). "Russian, European Spacewalkers Wrap Up Robotic Arm Excursion". blogs.nasa.gov. Retrieved 2022-07-22.
- ^ Garcia, Mark (17 August 2022). "Russian Spacewalk Ends Early After Battery Power Issue". blogs.nasa.gov. Retrieved 2022-08-18.
- ^ "Russian cosmonauts to perform spacewalk in middle of Aug – Roscosmos". interfax.com. Retrieved 2022-08-06.
- ^ "Russian Cosmonauts to Embark on Spacewalk in Mid-August". 2022-07-29. Retrieved 2022-08-06.
- ^ Lavelle, Heidi (17 August 2022). "Spacewalkers Exit Station to Continue Outfitting European Robotic Arm". blogs.nasa.gov. Retrieved 2022-08-17.
- ^ Garcia, Mark (17 August 2022). "Spacewalk Concludes After Abnormal Battery Readings". blogs.nasa.gov. Retrieved 2022-08-18.
- ^ Jones, Andrew (2022-09-02). "China's Shenzhou 14 astronauts perform 1st spacewalk out of new module (video)". Space.com. Retrieved 2023-12-12.
- ^ Bardan, Roxana (2022-09-01). "NASA Sets TV Coverage for Russian Spacewalk". NASA. Retrieved 2022-09-01.
- ^ Lavelle, Heidi (2 September 2022). "Spacewalkers Exit Station to Continue Outfitting European Robotic Arm". blogs.nasa.gov. Retrieved 2022-09-02.
- ^ Garcia, Mark (2 September 2022). "Cosmonaut Spacewalkers Complete Robotics Spacewalk". blogs.nasa.gov. Retrieved 2022-09-02.
- ^ Howell, Elizabeth (2022-09-17). "Chinese astronauts take 4- hour spacewalk outside new lab at Tiangong space station". Space.com. Retrieved 2023-12-12.
- ^ a b c Dodson, Gerelle (2022-11-03). "NASA to Provide Coverage of Preview Briefing, US Spacewalks". NASA. Retrieved 2022-11-04.
- ^ Garcia, Mark (15 November 2022). "NASA Astronauts Begin Spacewalk for Solar Array Work". blogs.nasa.gov. Retrieved 2022-11-15.
- ^ Lavelle, Heidi (15 November 2022). "NASA Astronauts Complete Spacewalk to Prep for Upcoming Solar Array Upgrades". blogs.nasa.gov. Retrieved 2022-11-16.
- ^ Jones, Andrew (2022-11-18). "China's Shenzhou 14 astronauts complete their 3rd and final spacewalk (video)". Space.com. Retrieved 2023-12-12.
- ^ Garcia, Mark (16 November 2022). "Cosmonauts Prep for Thursday Spacewalk, Dragon Targets Monday Launch". blogs.nasa.gov. Retrieved 2022-11-16.
- ^ Lavelle, Heidi (17 November 2022). "Cosmonauts Begin First in a Series of Spacewalks for Station Maintenance". blogs.nasa.gov. Retrieved 2022-11-17.
- ^ Garcia, Mark (17 November 2022). "Cosmonauts Finish Spacewalk for Work on Science Module". blogs.nasa.gov. Retrieved 2022-11-17.
- ^ Garcia, Mark (3 December 2022). "Spacewalkers Exit Station to Install Roll-Out Solar Array". blogs.nasa.gov. Retrieved 2022-12-03.
- ^ Garcia, Mark (3 December 2022). "Spacewalkers Complete New Solar Array Installation on Station". blogs.nasa.gov. Retrieved 2022-12-03.
- ^ Dodson, Gerelle (2023-01-13). "NASA to Provide Coverage of US Spacewalk, Preview News Conference". NASA. Retrieved 2023-01-14.
- ^ Lavelle, Heidi (20 January 2023). "Astronauts Begin Spacewalk to Prep for Station Power Upgrades". blogs.nasa.gov. Retrieved 2023-01-20.
- ^ Garcia, Mark (20 January 2023). "Spacewalkers Wrap Up First Spacewalk of 2023". blogs.nasa.gov. Retrieved 2023-01-20.
- ^ Lavelle, Heidi (2 February 2023). "Astronauts Begin Spacewalk to Continue Power System Upgrades". blogs.nasa.gov. Retrieved 2023-02-02.
- ^ Garcia, Mark (2 February 2023). "Spacewalkers Complete Construction Job to Upgrade Station Power". blogs.nasa.gov. Retrieved 2023-02-02.
- ^ a b c d "《面对面》揭秘神十五乘组四次出舱细节". Weixin Official Accounts Platform. Retrieved 2023-08-17.
- ^ Garcia, Mark (10 April 2023). "Botany, Heart Research Ahead of Dragon Departure and Spacewalks". blogs.nasa.gov. Retrieved 2023-04-11.
- ^ Donaldson, Abbey (17 April 2023). "NASA Sets Coverage of Spacewalk, News Conference for Station Upgrades". nasa.gov. NASA. Archived from the original on 18 April 2023. Retrieved 25 April 2023.
- ^ Garcia, Mark (28 April 2023). "Astronauts Begin Spacewalk to Upgrade Station Power". blogs.nasa.gov. Archived from the original on 28 April 2023. Retrieved 2023-04-28.
- ^ Garcia, Mark (28 April 2023). "Astronauts Wrap Up Spacewalk for Station Power Upgrades". blogs.nasa.gov. Archived from the original on 29 April 2023. Retrieved 2023-04-28.
- ^ Pearlman, Robert Z. (2023-04-24). "Russian spacewalk to move airlock outside space station postponed". Space.com. Archived from the original on 29 April 2023. Retrieved 2023-04-25.
- ^ Garcia, Mark (1 May 2023). "Cosmonauts Prep for Wednesday Spacewalk as Astronauts Relax". blogs.nasa.gov. Archived from the original on 1 May 2023. Retrieved 2023-05-01.
- ^ Garcia, Mark (3 May 2023). "Cosmonauts Begin Spacewalk to Move Experiment Airlock". blogs.nasa.gov. Retrieved 2023-05-03.
- ^ Garcia, Mark (3 May 2023). "Cosmonauts Move Experiment Airlock and Complete Spacewalk". blogs.nasa.gov. Retrieved 2023-05-04.
- ^ Graf, Abigail (12 May 2023). "Cosmonauts Begin Spacewalk to Deploy Radiator". blogs.nasa.gov. Retrieved 2023-05-12.
- ^ Garcia, Mark (12 May 2023). "Cosmonauts Deploy Radiator and Complete Spacewalk". blogs.nasa.gov. Retrieved 2023-05-12.
- ^ Garcia, Mark (2023-06-09). "NASA Astronauts Begin Spacewalk to Install Solar Array". blogs.nasa.gov. Retrieved 2023-06-10.
- ^ Garcia, Mark (2023-06-09). "NASA Spacewalkers Complete Solar Array Installation". blogs.nasa.gov. Retrieved 2023-06-10.
- ^ Garcia, Mark (2023-06-15). "Astronauts Begin Spacewalk to Install Roll-Out Solar Array". blogs.nasa.gov. Retrieved 2023-06-15.
- ^ Garcia, Mark (2023-06-15). "NASA Spacewalkers Finish Installing Roll-Out Solar Array". blogs.nasa.gov. Retrieved 2023-06-15.
- ^ Garcia, Mark (2023-06-22). "Cosmonauts Begin Spacewalk to Replace Station Hardware". blogs.nasa.gov. Retrieved 2023-06-22.
- ^ Garcia, Mark (2023-06-22). "Cosmonauts Finish Spacewalk After Replacing Station Hardware". blogs.nasa.gov. Retrieved 2023-06-22.
- ^ "China's Shenzhou 16 astronauts complete 1st spacewalk (video)". Space. 21 July 2023. Retrieved 26 July 2023.
- ^ Bardan, Roxana (2023-08-07). "NASA Sets Coverage of Roscosmos Spacewalk Outside Space Station". NASA. Retrieved 2023-08-07.
- ^ Garcia, Mark (2023-08-09). "Cosmonauts Begin Spacewalk for Station Upgrade Work". blogs.nasa.gov. Retrieved 2023-08-09.
- ^ Garcia, Mark (2023-08-09). "Cosmonauts Finish Spacewalk Installing Shields and Relocating Hardware". blogs.nasa.gov. Retrieved 2023-08-10.
- ^ Garcia, Mark (2023-10-16). "Spacewalk Dates Adjusted; Cargo Operations Begin the Crew's Week". blogs.nasa.gov. Retrieved 2023-10-18.
- ^ Graf, Abby (2023-10-25). "Cosmonauts Begin Spacewalk to Install Scientific Payloads and Inspect Radiator". blogs.nasa.gov. Retrieved 2023-10-25.
- ^ Graf, Abby (2023-10-25). "Cosmonauts Finish Spacewalk Following Hardware Installs and Inspections". blogs.nasa.gov. Retrieved 2023-10-26.
- ^ Garcia, Mark (3 October 2023). "Crew Preps for Spacewalks to Analyze Microbes, Replace Hardware". blogs.nasa.gov. NASA. Archived from the original on 18 October 2023. Retrieved 4 October 2023.
- ^ Garcia, Mark (1 November 2023). "Two Spacewalkers Exit Station for Communications, Solar Array Work". blogs.nasa.gov. NASA. Archived from the original on 2 November 2023. Retrieved 1 November 2023.
- ^ Garcia, Mark (1 November 2023). "Astronauts Complete Spacewalk, Dragon Launch Moves to Nov. 7". blogs.nasa.gov. NASA. Archived from the original on 8 November 2023. Retrieved 1 November 2023.
- ^ "Shenzhou-17 crew completes first spacewalk | english.scio.gov.cn". english.scio.gov.cn. Retrieved 2023-12-22.
- ^ "Shenzhou-17 crew completes in-orbit repairs during 2nd extravehicular mission". Xinhua. 2 March 2024. Retrieved 2 March 2024.
- ^ Garcia, Mark (2024-04-25). "Cosmonauts Begin Spacewalk for Hardware, Science Work". blogs.nasa.gov. Retrieved 2024-04-25.
- ^ "Cosmonauts Complete Spacewalk to Install Hardware, Science – Space Station". blogs.nasa.gov. 2024-04-25. Retrieved 2024-04-25.
- ^ "[24小时]约8.5小时!神十八乘组完成首次出舱". tv.cctv.com. Retrieved 2024-05-28.
- ^ Garcia, Mark (2024-06-24). "U.S. Spacewalk Update". blogs.nasa.gov. Retrieved 2024-06-24.
- ^ McDowell, Jonathan (September 12, 2024). "List of spacewalks". planet4589.org. Retrieved September 12, 2024.
- ^ McDowell, Jonathan [@planet4589] (12 September 2024). "The hatch open/close time was about 26 m 40s. Isaacman was outside hatch for 7 min 56 m; Gillis for about 7m15s" (Tweet). Retrieved 12 September 2024 – via Twitter.
- ^ "SpaceX Polaris Dawn astronauts perform historic 1st private spacewalk in orbit (video)". space.com. 12 September 2024. Retrieved 12 September 2024.
- ^ Jones, Andrew (2024-12-17). "Shenzhou-19 astronauts complete record-breaking 9-hour spacewalk". SpaceNews. Retrieved 2024-12-18.
External links
[edit]- NASA list of EVA statistics (may not be updated)
- U. S. Human Spaceflight History
- NASA JSC Oral History Project
- "Boomers collect artifacts, memories of NASA's heyday": Historical moonwalk information.