Jump to content

List of wind farms in the Republic of Ireland

From Wikipedia, the free encyclopedia

This is a list of wind farms in the Republic of Ireland.

Locations of all the wind farms which have coordinates below, may be seen on a map together by clicking "Map of all coordinates using OpenStreetMap" at the right side of this page.

Mountlucas Wind Farm in Co Offaly

Operating

[edit]

Onshore

[edit]
Wind Farm Capacity (MW) No. Turbine Vendor Model Size (MW) Operator Completed County Coordinates
Altagowlan 7. 65 9 Siemens Gamesa G52 0.85 B9 2005 Roscommon 54°07′17″N 8°08′43″W / 54.1215°N 8.1454°W / 54.1215; -8.1454 (Altagowlan Wind Farm)
Anarget 1.2 2 Enercon E-40 0.6 2004 Donegal 54°45′19″N 8°10′08″W / 54.7553°N 8.1689°W / 54.7553; -8.1689 (Anarget Wind Farm)
Anarget Extension 0.9 1 Enercon E-44 0.9 2007 Donegal 54°45′19″N 8°10′08″W / 54.7553°N 8.1689°W / 54.7553; -8.1689 (Anarget Wind Farm Extension)
Ardderroo 101 22 Nordex N149 4 & 5 2023 Galway 53°20′54″N 9°18′50″W / 53.3484°N 9.3138°W / 53.3484; -9.3138 (Ardderroo Wind Farm)
Astellas 0.8 1 Enercon E-53 0.8 2011 Kerry 52°06′42″N 9°46′37″W / 52.1116°N 9.7769°W / 52.1116; -9.7769 (Astellas Wind Farm)
Athea 34 16 GE SSE Renewables[1] 2014 Limerick 52°26′27″N 9°17′27″W / 52.4408°N 9.2909°W / 52.4408; -9.2909 (Athea Wind Farm)
Ballincollig Hill 13.3 16 Enercon E-44
E-48
0.9
0.8
2009 Kerry 52°18′37″N 9°35′09″W / 52.3104°N 9.5857°W / 52.3104; -9.5857 (Ballincollig Hill Wind Farm)
Ballinlough/Ikerrin 2.55 3 Vestas V52 0.85 2006 Tipperary 52°49′48″N 9°00′41″W / 52.8300°N 9.0113°W / 52.8300; -9.0113 (Ballinlough/Ikerrin Wind Farm)
Ballinveny 2.55 3 Vestas V52 0.85 2006 Tipperary 52°49′10″N 7°57′04″W / 52.8194°N 7.9510°W / 52.8194; -7.9510 (Ballinveny Wind Farm)
Ballybane 29.9 13 Enercon E-70 2.3 Windprospect 2008 Cork 51°37′58″N 9°22′34″W / 51.6329°N 9.3762°W / 51.6329; -9.3762 (Ballybane Wind Farm)
Ballymartin 6.9 3 Enercon E-82 2.3 Ørsted[2] 2010 Kilkenny 52°23′18″N 7°06′24″W / 52.3882°N 7.1067°W / 52.3882; -7.1067 (Ballymartin Wind Farm)
Ballywater 42 21 Enercon E-70 2 2006 Wexford 52°32′07″N 6°14′23″W / 52.5353°N 6.2396°W / 52.5353; -6.2396 (Ballywater Wind Farm)
Bawnmore 1 11.5 5 Enercon E-82 2.3 2011 Cork 51°57′12″N 8°54′50″W / 51.9533°N 8.9138°W / 51.9533; -8.9138 (Bawnmore 1 Wind Farm)
Bawnmore 2 (Carriganima) 13.8 6 Enercon E-82 2.3 2011 Cork 51°59′26″N 9°01′15″W / 51.9905°N 9.0207°W / 51.9905; -9.0207 (Bawnmore 2 (Carriganima) Wind Farm)
Barnesmore 15 25 Vestas V42 0.60 ScottishPower Renewables 1997 Donegal 54°41′48″N 7°56′09″W / 54.6966°N 7.9358°W / 54.6966; -7.9358 (Barnesmore Wind Farm)
Beal Hill 1 1.65 1 Vestas V66 1.65 2000 Kerry 52°33′51″N 9°37′57″W / 52.5643°N 9.6326°W / 52.5643; -9.6326 (Beal Hill 1 Wind Farm)
Beal Hill 2 2.55 3 Vestas V52 0.85 2003 Kerry 52°33′51″N 9°37′57″W / 52.5643°N 9.6326°W / 52.5643; -9.6326 (Beal Hill 2 Wind Farm)
Beallough 1.7 2 Vestas V52 0.85 2008 Waterford 52°16′18″N 7°20′53″W / 52.2718°N 7.3480°W / 52.2718; -7.3480 (Beallough Wind Farm)
Beam Hill 14 8 Vestas V66 1.75 2008 Donegal 55°11′54″N 7°26′25″W / 55.1982°N 7.4402°W / 55.1982; -7.4402 (Beam Hill Wind Farm)
Beenageeha 3.96 6 Vestas V47 0.66 B9 2000 Kerry 52°19′51″N 9°33′40″W / 52.3307°N 9.5610°W / 52.3307; -9.5610 (Beenageeha Wind Farm)
Bellacorick 6.45 21 Nordtank NTK300 0.3 Bord na Móna[3] 1992 Mayo 54°06′45″N 9°35′13″W / 54.1125°N 9.5870°W / 54.1125; -9.5870 (Bellacorick Wind Farm)
Bindoo 48 32 GE 1.5s 1.5 SSE Renewables[4] 2007 Cavan 54°00′44″N 7°06′25″W / 54.0121°N 7.1070°W / 54.0121; -7.1070 (Bindoo Wind Farm)
Blackbanks/1 3.4 4 Vestas V52 0.85 ESBI 2001 Leitrim 54°08′40″N 8°11′28″W / 54.1444°N 8.1911°W / 54.1444; -8.1911 (Blackbanks Wind Farm)
Blackbanks/2 6.8 8 Vestas V52 0.85 ESBI 2005 Leitrim 54°08′40″N 8°11′28″W / 54.1444°N 8.1911°W / 54.1444; -8.1911 (Blackbanks Wind Farm)
Boggeragh 57 19 Vestas V90 3 2009 Cork 52°03′02″N 8°53′53″W / 52.0505°N 8.8980°W / 52.0505; -8.8980 (Boggeragh Wind Farm)
Booltiagh 1 18 12 GE 1.5s 1.5 Ørsted[2] 2005 Clare 52°46′56″N 9°14′46″W / 52.7822°N 9.2462°W / 52.7822; -9.2462 (Booltiagh Wind Farm)
Booltiagh 2 12 6 2 Ørsted[2] 2013 Clare
Boolynagleragh 40 18 Nordex N90 2.5 Invis Energy[5] 2020 Clare
Bruckana 42 14 Siemens Gamesa 3.0DD-101 3 Bord na Móna[3] 2014 Tipperary
Kilkenny
Laois
52°46′56″N 7°40′08″W / 52.7823°N 7.6688°W / 52.7823; -7.6688 (Bruckana Wind Farm)
Burtonport 0.66 1 Vestas V47 0.66 Burtonport Fisheries 2003 Donegal 54°58′48″N 8°26′25″W / 54.9800°N 8.4403°W / 54.9800; -8.4403 (Burtonport Wind Farm)
Caherdowney 9.2 4 Enercon E-70 2.3 2012 Cork 52°00′04″N 9°07′01″W / 52.0011°N 9.1170°W / 52.0011; -9.1170 (Caherdowney Wind Farm)
Cappawhite 51 17 Vestas V112 3 ESB[6] 2017 Tipperary 52°36′27″N 8°09′39″W / 52.6076°N 8.1609°W / 52.6076; -8.1609 (Cappawhite Wind Farm)
Cark 15 25 NEG Micon NM43 0.6 B9 1997 Donegal 54°53′11″N 7°52′49″W / 54.8865°N 7.8803°W / 54.8865; -7.8803 (Cark Wind Farm)
Carnsore 11.9 14 Vestas V52 0.85 ESB[6] 2002 Wexford 52°10′43″N 6°21′44″W / 52.1787°N 6.3623°W / 52.1787; -6.3623 (Carnsore Wind Farm)
Carrane Hill 3.4 4 Siemens Gamesa G52 0.85 ESB[6] 2006 Sligo 54°08′03″N 8°13′47″W / 54.1342°N 8.2298°W / 54.1342; -8.2298 (Carrane Hill Wind Farm)
Carrigcannon 23 10 Enercon E-70 2.3 2010 Cork 52°04′13″N 8°53′56″W / 52.0703°N 8.8990°W / 52.0703; -8.8990 (Carrigcannon Wind Farm)
Carrigdangan 54.3 9 6.03 2021 Cork 51°48′10″N 9°08′19″W / 51.8029°N 9.1387°W / 51.8029; -9.1387 (Carrigdangan Wind Farm)
Carrig 2.55 3 Vestas V52 0.85 2006 Tipperary 53°01′54″N 7°58′40″W / 53.0318°N 7.9777°W / 53.0318; -7.9777 (Carrig Wind Farm)
Carrons 4.6 2 Enercon E-82 2.3 2010 Limerick 52°32′27″N 9°04′11″W / 52.5409°N 9.0696°W / 52.5409; -9.0696 (Carrons Wind Farm)
Carrowleagh 36.8 16 Enercon E-70 2.3 2012 Mayo 54°08′19″N 8°57′01″W / 54.1386°N 8.9503°W / 54.1386; -8.9503 (Carrowleagh Wind Farm)
Castledockrell 41.4 18 Enercon E-70 2.3 Castledockrell Wind Group Limited 2011 Wexford 52°35′11″N 6°38′46″W / 52.5865°N 6.6460°W / 52.5865; -6.6460 (Castledockrell Wind Farm)
Castlepook 33.3 14 Nordex N90 2.5 ESB[6]
Coillte
2018 Cork 52°17′38″N 8°33′48″W / 52.2938°N 8.5634°W / 52.2938; -8.5634 (Castlepook Wind Farm)
Cloghboola 48 16 Enercon E82 3 2015 Kerry 52°20′09″N 9°26′17″W / 52.3358°N 9.4380°W / 52.3358; -9.4380 (Cloghboola Wind Farm)
Cloncreen 75 21 Vestas V136 3.45 Bord na Móna[3] 2022 Offaly
Clydaghroe 4.6 2 Enercon E70 2 2012 Cork 51°59′22″N 9°09′29″W / 51.9894°N 9.1580°W / 51.9894; -9.1580 (Clydaghroe Wind Farm)
Coomacheo 41.4 18 Siemens Gamesa 2.3VS 2.3 SSE Renewables[7] 2008 Cork 52°00′52″N 9°08′42″W / 52.0144°N 9.145°W / 52.0144; -9.145 (Coomacheo Wind Farm)
Coomatallin 6 4 GE 1.5SE 1.5 SSE Renewables[8] 2005 Cork 51°39′03″N 9°05′39″W / 51.6508°N 9.0942°W / 51.6508; -9.0942 (Coomatallin Wind Farm)
Cornacahan Hill 2.7 3 Enercon E-44 0.9 2007 Donegal 54°39′36″N 8°27′30″W / 54.6600°N 8.4584°W / 54.6600; -8.4584 (Cornacahan Hill Wind Farm)
Corneen 3 2 GE 1.5S 1.5 SSE Renewables[9] 2001 Cavan 54°08′36″N 7°38′39″W / 54.1432°N 7.6443°W / 54.1432; -7.6443 (Corneen Wind Farm)
Corry Mountain 4.8 8 Vestas V42 0.6 Eco Wind Power 1997 Leitrim 54°07′48″N 8°09′10″W / 54.1300°N 8.1528°W / 54.1300; -8.1528 (Corry Mountain Wind Farm)
Crocane 1.6 2 Enercon E-48 0.8 2010 Cork 51°50′35″N 8°09′24″W / 51.8431°N 8.1566°W / 51.8431; -8.1566 (Crocane Wind Farm)
Crockahenny 5.0 10 Enercon E-40 0.5 ESB[6] 1998 Donegal 55°08′41″N 7°16′13″W / 55.1447°N 7.2704°W / 55.1447; -7.2704 (Crockahenny Wind Farm)
Cronalaght 1&2 4.8 8 Vestas V39 0.6 1997 Donegal 55°03′52″N 8°12′58″W / 55.0645°N 8.2160°W / 55.0645; -8.2160 (Cronalaght Wind Farm)
Cronelea 6.9 3 Enercon E-70 2.3 2007 Wicklow 52°46′45″N 6°33′17″W / 52.7791°N 6.5548°W / 52.7791; -6.5548 (Cronelea Wind Farm)
Cronelea Upper 1.8 2 Enercon E-44 0.9 Wicklow
Cronelea Upper 2.55 3 Vestas V52 0.85 2005 Wicklow
Cuillalea 3.4 4 Vestas V52 0.85 2004 Mayo 53°50′55″N 9°04′16″W / 53.8485°N 9.07122°W / 53.8485; -9.07122 (Cuillalea Wind Farm)
Culliagh 12 18 Vestas V47 0.66 SSE Renewables[10] 2000 Donegal 54°52′08″N 7°53′24″W / 54.8689°N 7.8899°W / 54.8689; -7.8899 (Culliagh Wind Farm)
Curragh 18 8 Siemens Gamesa 2.3VS 2.3 SSE Renewables[11] 2009 Cork 52°00′29″N 9°06′40″W / 52.0081°N 9.1111°W / 52.0081; -9.1111 (Curragh Wind Farm)
Curraghgraigue Upper 5.1 6 Vestas V52 0.85 2004 Tipperary 52°47′49″N 8°06′16″W / 52.7969°N 8.1044°W / 52.7969; -8.1044 (Curraghgraigue Upper Wind Farm)
Derrybrien 60 70 Vestas V52 0.85 ESBI 2006 Galway 53°05′36″N 8°36′22″W / 53.0933°N 8.6060°W / 53.0933; -8.6060 (Derrybrien Wind Farm)
Derrynadivva 8 10 Enercon E-48 0.8 2009 Mayo 53°54′37″N 9°20′27″W / 53.9104°N 9.3408°W / 53.9104; -9.3408 (Derrynadivva Wind Farm)
Derrysallagh 32 10 GE 3.2 Energia[12] 2020 Sligo 54°05′48″N 8°11′27″W / 54.0968°N 8.1908°W / 54.0968; -8.1908 (Derrysallagh Wind Farm)
Dromada 28.5 19 GE 1.5s 1.5 SSE Renewables[13] 2010 Limerick 52°26′46″N 9°12′43″W / 52.4462°N 9.2120°W / 52.4462; -9.2120 (Dromada Wind Farm)
Dromadda Beg 10.2 3 Siemens Gamesa SWT-3.4-101 3.4 Innogy 2018 Kerry 52°19′51″N 9°27′10″W / 52.3309°N 9.4528°W / 52.3309; -9.4528 (Dromadda Beg Wind Farm)
Drumlough 4.8 8 Windmaster 0.6 B9 1997 Donegal 55°12′19″N 7°26′51″W / 55.2052°N 7.4474°W / 55.2052; -7.4474 (Drumlough Wind Farm)
Drybridge/Dunmore 1.7 2 Vestas V52 0.85 2006 Louth
Dundalk IT 0.85 1 Vestas V52 0.85 DIT 2005 Louth
Dunmore 1.8 2 Enercon E-44 0.9 2009 Louth
Dunneill 11.1 13 0.85 SSE Renewables[14] 2010 Sligo 54°12′35″N 8°50′56″W / 54.2098°N 8.8489°W / 54.2098; -8.8489 (Dunneill Wind Farm)
Esk 23.2 8 Nordex N90 2.5 Invis Energy[5] 2020 Cork
Flughland 9.2 4 Enercon E-70 2.3 Ørsted[2] 2009 Donegal 55°08′19″N 7°16′09″W / 55.1385°N 7.2691°W / 55.1385; -7.2691 (Flughland Wind Farm)
Galway Wind Park 174 58 Siemens Gamesa SWT-3-0-101 3 SSE Renewables[15]
Greencoat Renewables
2017 Galway 53°21′19″N 9°22′11″W / 53.3554°N 9.3698°W / 53.3554; -9.3698 (Galway Wind Park)
Garracummer 42.5 17 Nordex N90 2.5 Ørsted[2] 2013 Tipperary 52°38′37″N 8°08′49″W / 52.6437°N 8.1470°W / 52.6437; -8.1470 (Garracummer Wind Farm)
Gartnaneane 15 10 GE 1.5S 1.5 SSE Renewables[16] 2004 Cavan 53°56′45″N 6°56′06″W / 53.9458°N 6.9350°W / 53.9458; -6.9350 (Gartnaneane Wind Farm)
Garvagh Glebe 26 13 Vestas V80 2 ESB[6] 2010 Leitrim 54°08′27″N 8°11′38″W / 54.1409°N 8.1938°W / 54.1409; -8.1938 (Garvagh Glebe Wind Farm)
Geevagh 5 6 Siemens Gamesa G52 0.85 B9 2006 Sligo 54°08′30″N 8°16′03″W / 54.1418°N 8.2676°W / 54.1418; -8.2676 (Geevagh Wind Farm)
Gibbet Hill 15 6 Nordex N90 2.5 2013 Wexford 52°40′28″N 6°35′53″W / 52.6744°N 6.5980°W / 52.6744; -6.5980 (Gibbet Hill Wind Farm)
Glackmore 2.3 1 Enercon E-70 2.3 2008 Donegal 55°07′28″N 7°16′23″W / 55.1244°N 7.2731°W / 55.1244; -7.2731 (Glackmore Wind Farm)
Glenmore 34.2 12 Nordex N90 2.5 Invis Energy[5] 2019 Clare
Glenough 35 14 Nordex N80/N90 2.5 ABO Wind 2011 Tipperary 52°38′31″N 8°03′18″W / 52.6419°N 8.055°W / 52.6419; -8.055 (Glenough Wind Farm)
Gneeves 9.4 11 Vestas V52 0.85 Ørsted[2] 2006 Cork 52°00′46″N 9°07′23″W / 52.0127°N 9.1230°W / 52.0127; -9.1230 (Gneeves Wind Farm)
Gortahile 20 8 Nordex N90 2.5 ABO Wind 2011 Laois 52°48′53″N 7°03′43″W / 52.8147°N 7.0620°W / 52.8147; -7.0620 (Gortahile Wind Farm)
Grouselodge 15 6 Nordex N90 2.5 ESB[6] 2011 Limerick 52°31′17″N 9°06′10″W / 52.5213°N 9.1028°W / 52.5213; -9.1028 (Grouselodge Wind Farm)
Grousemount 114 38 Siemens Gamesa SWT-3.4DD
SWT-2.3-82 VS
3.4
2.3
ESB[6][17] 2019 Kerry 51°52′37″N 9°19′52″W / 51.8770°N 9.3310°W / 51.8770; -9.3310 (Grousemount Wind Farm)
Greenoge 7.7 5 Nordex 4 N60
1 N90
1.3
2.5
Greenoge Windfarm Ltd 2005 Carlow 52°39′32″N 6°43′41″W / 52.6589°N 6.7280°W / 52.6589; -6.7280 (Greenoge Wind Farm)
Hollyford 9 3 Siemens Gamesa SWT-3.0-101 3 Energia[18] 2014 Tipeperary 52°38′47″N 8°04′09″W / 52.6465°N 8.0693°W / 52.6465; -8.0693 (Hollyford Wind Farm)
Inverin 1&2 (Knock South) 3.3 5 Vestas V47 0.66 1999 Galway 53°15′53″N 9°22′11″W / 53.2647°N 9.3697°W / 53.2647; -9.3697 (Inverin 1&2 Wind Farm)
Kealkill (Dismantled) 8.5 10 Siemens Gamesa V52 0.85 2006 Cork
Kilathmoy 23 7 Nordex N100 3.3 Statkraft 2020 Limerick / Kerry 52°29′27″N 9°19′57″W / 52.4909°N 9.3325°W / 52.4909; -9.3325 (Kilathmoy Wind Farm)
Kilgarvan 45 15 Vestas V90 3 Ørsted[2] 2007 Kerry 51°56′03″N 9°19′18″W / 51.9341°N 9.3218°W / 51.9341; -9.3218 (Inchincoosh Wind Farm)
Kilgarvan II (Inchincoosh) 32.5 13 Nordex N90 2.5 Ørsted[2] 2009 Kerry 51°56′12″N 9°20′55″W / 51.9367°N 9.3486°W / 51.9367; -9.3486 (Lettercannon Wind Farm)
Killaveenoge 25 10 Nordex N90 2.5 Invis Energy[5] 2017 Cork
Killybegs 13.8 6 Enercon E-70 2.3 2008 Donegal
Kilronan 5 10 Vestas V39 0.5 1998 Roscommon 54°25′50″N 8°50′31″W / 54.4306°N 8.8420°W / 54.4306; -8.8420 (Kilronan Wind Farm)
Kilvinane 4.5 3 Siemens Gamesa G850 0.85 2006 Cork
Kingsmountain 25 10 Nordex N80 2.5 SSE Renewables[19] 2003 Sligo 54°11′56″N 8°47′35″W / 54.1989°N 8.7930°W / 54.1989; -8.7930 (Kingsmountain Wind Farm)
Knockacummer 100 40 Nordex N90 2.5 Greencoat Renewables 2013 Cork 52°15′34″N 9°06′40″W / 52.2594°N 9.1110°W / 52.2594; -9.1110 (Knockacummer Wind Farm)
Knockalough 35.2 11 Nordex N90 2.5 Invis Energy[5] 2018 Galway 53°18′24″N 9°15′33″W / 53.3066°N 9.2593°W / 53.3066; -9.2593 (Knockalough Wind Farm)
Knockastanna 6 4 GE 1.5 1.5 SSE Renewables[20] 2009 Limerick
Knockawarriga 1 22.5 9 Nordex N90 2.5 Ørsted[2] 2008 Limerick
Knockawarriga 2 7.5 3 2.5 Ørsted[2] 2020 Limerick
Knockduff 65 26 Nordex N90 2.5 Invis Energy[5] 2016 Cork 52°01′54″N 8°49′48″W / 52.0316°N 8.8300°W / 52.0316; -8.8300 (Knockduff Wind Farm)
Knocknagoum 44.4 26 Vestas 4 V90
5 V90
6 V80
11 V52
2
3
2
0.85
Invis Energy[5] 2013 Kerry
Lacka Cross 4.6 2 Enercon E-82 2.3 2009 Kerry
Lackan 6.9 3 Enercon E-70 2.3 2006 Sligo
Lahanaght Hill 4.25 5 Vestas V52 0.85 2006 Cork
Largan Hill 5.9 9 Vestas V47 0.66 B9 2000 Roscommon 53°33′52″N 8°19′59″W / 53.5645°N 8.3331°W / 53.5645; -8.3331 (Largan Hill Wind Farm)
Leanamore 18 9 2 SSE Renewables[21] 2018 Kerry
Leitir Guingaid (LGLP) 23 10 Enercon E82 2.3 Invis Energy[5] 2014 Galway
Leitir Peic (LGLP) 21 7 Enercon E82 3 Invis Energy[5] 2014 Galway
Lenanavea 4.5 5 Enercon E-44 0.9 2010 Mayo 53°55′26″N 9°21′02″W / 53.9240°N 9.3505°W / 53.9240; -9.3505 (Lenanavea Wind Farm)
Lisheen 1 36 18 Vestas V90 2 Ørsted[2] 2009 Tipperary
Lisheen 2 24 12 2 Ørsted[2] 2013 Tipperary
Lisheen 3 28.8 8 3.6 Ørsted[2] 2023 Tipperary
Loughderryduff 7.65 9 Vestas V52 0.85 2008 Donegal
Lurganboy 5.4 6 Enercon E-44 0.9 2008 Donegal
Mace Upper 2.4 3 Enercon E-48 0.8 2009 Mayo 53°46′15″N 8°58′11″W / 53.7708°N 8.9697°W / 53.7708; -8.9697 (Mace Upper Wind Farm)
Magheramore 43.2 16 Nordex N90 2.5 Invis Energy[5] 2019 Mayo
Meenachullalan 13.8 6 Enercon E70 2.3 2008 Donegal
Meenadreen 3.4 4 Vestas V52 0.85 B9 2003 Donegal
Meenadreen II 95 38 Nordex N90 2.5 Energia[22] 2017 Donegal
Meenanilta 2.55 3 Vestas V52 0.85 2004 Donegal
Meenanilta 3 3.2 4 Enercon E-48 0.80 2004 Donegal
Meentycat 88.2 45 Siemens Gamesa 2
2.3
SSE Renewables[23] 2004 Donegal 54°51′53″N 7°51′06″W / 54.8646°N 7.8516°W / 54.8646; -7.8516 (Meentycat Wind Farm)
Meenwaun 11 4 GE 2.75-120 2.75 Stratkraft 2018 Offaly
Midas 32.24 23 Vestas V90
V52
3
0.85
2007 Kerry
Mienvee 0.9 1 Vestas V52 0.85 Ørsted[2] 2004 Tipperary
Milane Hill 5.94 9 Vestas V47 0.66 B9 2000 Cork
Monaincha 36 15 Nordex N117 2.4 Greencoat Renewables 2014 Tipperary
Moanmore 14 7 Enercon E-70 E4 2 2006 Clare
Moneenatieve 4.25 2 Siemens Gamesa G52 0.85 B9 2005 Leitrim
Moneypoint 17.25 5 Vestas V112 3.45 ESB[6] 2017 Clare
Mount Eagle 6.8 8 Vestas V52 0.85 ESB[6] 2005 & 2008 Kerry
Mountlucas 84 28 Siemens Gamesa 3.0DD-101 3 Bord na Móna[3] 2014 Offaly 53°16′17″N 7°14′10″W / 53.2713°N 7.2360°W / 53.2713; -7.2360 (Mountlucas Wind Farm)
Mountain Lodge 34.5 23 GE 1.5s 1.5 ESBI 2008 Cavan
Mountain Lodge II 3 2 GE 1.5s 1.5 ESBI 2009 Cavan
Mullananalt 7.5 5 GE 1.5s 1.5 SSE Renewables[24] 2007 Monaghan 54°04′37″N 6°54′34″W / 54.0769°N 6.9094°W / 54.0769; -6.9094 (Mullananalt Wind Farm)
Muingnaminnane 14.8 18 Enercon E-44
E-48
0.9
0.8
Saorgus 2008 Kerry
Oweninny 192 60 Siemens Gamesa

Enercon

SWT-3.2-113

N117/3600

3.2

3.6

ESB[6]
Bord na Móna[25]
2023 Mayo 54°09′05″N 9°32′58″W / 54.1514°N 9.5495°W / 54.1514; -9.5495
Pallas 40 20 Enercon E-70 2.0 Pallas Wind Farms Ltd 2008 Kerry
Raheen Barr 18.7 22 Vestas V52 0.85 2003 Mayo 53°53′57″N 9°21′16″W / 53.8993°N 9.3544°W / 53.8993; -9.3544 (Raheen Barr Wind Farm)
Raheenleagh 35.2 11 Siemens Gamesa 108-DD 3.2 ESB[6]
Coillte
2016 Wicklow
Rahora 4 5 Enercon E-48 0.8 2008 Cork
Raragh 12 5 Mainstream Renewable Power 2019 Cavan 53°55′33″N 6°49′27″W / 53.9259°N 6.8241°W / 53.9259; -6.8241 (Raragh Wind Farm)
Rathcahill 12.5 5 2.5 SSE Renewables[26] 2011 Limerick
Rathmooney 0.8 1 Enercon E-48 0.8 2009 Dublin 53°33′00″N 6°10′30″W / 53.5499°N 6.1751°W / 53.5499; -6.1751 (Rathmooney Wind Farm)
Reenascreena 4.0 5 Enercon E-48 0.8 2009 Cork
Richfield 27 18 GE 1.5s 1.5 SSE Renewables[27] 2006 Wexford 52°12′55″N 6°35′28″W / 52.2153°N 6.5910°W / 52.2153; -6.5910 (Richfield Wind Farm)
Seltannaveeny 4.6 2 Enercon E-70 2.3 2010 Leitrim
Shannagh 2.7 3 Enercon E-44 0.9 2009 Donegal
Sheeragh 4.6 2 Enercon E-70 2.3 2008 Donegal
Sillahertane 8.5 10 0.85 Ørsted[2] 2009 Kerry
Skehanagh 4.25 5 Vestas V52 0.85 2006 Tipperary
Skrine 4.6 2 Enercon E-70 2.3 2011 Roscommon
Sliabh Bawn 64 20 Siemens Gamesa SWT-3.2-101 3.2 Bord na Móna[3]
Coillte
2017 Roscommon
Slievecallan West 45 18 Nordex N90 2.5 Invis Energy[5] 2017 Clare
Smithstown 8 4 2 Ørsted[2] 2013 Kilkenny
Snugborough 13.5 9 GE 1.5s 1.5 2003 Louth
Sonnagh Old 7.65 9 Vestas V52 0.85 2004 Galway 53°07′51″N 8°38′21″W / 53.1309°N 8.6391°W / 53.1309; -8.6391 (Sonnagh Old Wind Farm)
Sorne Hill 1 32 16 Enercon E-70 2 Ørsted[2] 2006 Donegal
Sorne Hill 2 6.9 3 2.3 Ørsted[2] 2009 Donegal
Spion Kop 1.2 2 Vestas V42 0.6 1997 Leitrim
Slievereagh 2.3 1 Enercon E-70 2.3 2009 Limerick
Taurbeg 25.3 11 Siemens Gamesa SWT-2.3 2.3 B9 2006 Cork
Teevurcher 10.25 5 Senvion MM82 2.05 NTR 2018 Meath 53°53′09″N 6°54′58″W / 53.8857°N 6.9160°W / 53.8857; -6.9160 (Teevurcher Wind Farm)
Tournafulla 27 18 GE 1.5s 1.5 SSE Renewables[28] 2007 Limerick
Tullahennel 37 13 GE 26 MW Statkraft battery 2019 Kerry
Tullynahaw 22 11 Vestas V80 2 ESB[6] 2010 Roscommon
Tullynamoyle 9.2 4 Enercon E-70 2.3 Tullynamoyle Wind Farm Limited 2011 Leitrim
Tursillagh/1 15.8 23 Vestas V47 0.66 Saorgus 2000 Kerry 52°18′52″N 9°35′51″W / 52.3144°N 9.5975°W / 52.3144; -9.5975 (Tursillagh Wind Farm)
Tursillagh/2 6.8 8 Vestas V52 0.85 Saorgus 2004 Kerry 52°18′52″N 9°35′51″W / 52.3144°N 9.5975°W / 52.3144; -9.5975 (Tursillagh Wind Farm)
Woodhouse 20 8 Nordex 5 N100
3 N90
2.5 ESB[6] 2015 Waterford

Offshore

[edit]
Wind Farm Capacity (MW) No. Turbine Vendor Model Size (MW) Operator Completed County Coordinates
Arklow Bank 25 7 GE 3.6xl 3.6 SSE Renewables 2004 Wicklow 52°47′20″N 5°56′56″W / 52.789°N 5.949°W / 52.789; -5.949 (Arklow Bank Wind Park)

Proposed

[edit]

Onshore

[edit]
Wind Farm Capacity (MW) No. Turbine Vendor Model Size (MW) Developer Proposed County Coordinates Notes
Ballinagree[29] 125.4 Ørsted[2]
FuturEnergy Ireland
2026 Cork
Cloghercor[30] 125.4 Ørsted[2]
FuturEnergy Ireland
2027 Donegal
Coole[31] 50 13 Statkraft Westmeath
Coom Green Energy Park[32] 105.6 Ørsted[2]
FuturEnergy Ireland
2027 Cork
Cummennabuddoge[33] 114 19 SSE Renewables
FuturEnergy Ireland
2027 Kerry
Cushaling[34] 55 9 Vestas V162 6.2 Statkraft 2024 Offaly [35]
Gortyrahilly[36] 90 15 SSE Renewables
FuturEnergy Ireland
Cork
Inchamore[37] 36 6 SSE Renewables
FuturEnergy Ireland
Cork
Mount Callan 90 30 3.0 West Clare Renewable Energy Clare [38]
Shragh 135 45 Enercon E82 3.0 Clare Coastal Wind Power Ltd Clare [39]

Offshore

[edit]
Wind Farm Capacity (MW) No. Turbine Vendor Model Size (MW) Developer Proposed County Coordinates Notes
Arklow Bank 2[40] 800 36 - 60 SSE Renewables 2029 Wicklow 52°47′27″N 5°56′51″W / 52.7907°N 5.9474°W / 52.7907; -5.9474 (Arklow Bank Wind Park) A Maritime Area Consent (MAC) which grants seabed rights was granted in December 2022.
Clarus Offshore Wind Farm[41] 1,000 70 15 DP Energy
Iberdrola
2030 Clare
Kerry
52°38′14″N 10°40′48″W / 52.6373°N 10.6801°W / 52.6373; -10.6801 (Clarus Offshore Wind Farm)
Codling[42] 1,300 100 Fred Olsen Seawind
EDF Renewables
2025 - 2027 Wicklow 53°04′05″N 5°46′39″W / 53.0680°N 5.7774°W / 53.0680; -5.7774 (Codling Wind Park) Winning bid in ORESS-1[43]
Dublin Array[44][45][46] 600 - 900 45 - 61 RWE
Saorgus[47]
2028 Dublin 53°15′59″N 5°58′18″W / 53.2665°N 5.9718°W / 53.2665; -5.9718 (Dublin Array) Winning bid in ORESS-1 [43]
Inis Ealga Marine Energy Park[48] 1,000 70 DP Energy
Iberdrola
2030 Cork
Waterford
51°32′14″N 7°33′01″W / 51.5371°N 7.5504°W / 51.5371; -7.5504 (Inis Ealga Marine Energy Park)
North Irish Sea Array[49] 500 35 - 46 Statkraft Dublin
Meath
Louth
53°40′54″N 5°48′40″W / 53.6817°N 5.8111°W / 53.6817; -5.8111 (North Irish Sea Array) Winning bid in ORESS-1 [43]
Oriel[50] 330 55 Oriel Windfarm Ltd 2030 Louth 53°55′23″N 6°03′35″W / 53.9230°N 6.0596°W / 53.9230; -6.0596 (Parkwind Oriel Wind Farm)
Shelmalere Offshore Wind Farm[51] 1,000 70 15 DP Energy
Iberdrola
2030 Wicklow
Wexford
52°23′21″N 6°05′06″W / 52.3892°N 6.0851°W / 52.3892; -6.0851 (Shelmalere Offshore Wind Farm)
Skerd Rocks[52] 450 Fuinneamh Sceirde Teoranta 2030 Galway 53°15′59″N 9°59′04″W / 53.2665°N 9.9845°W / 53.2665; -9.9845 (Skerd Rocks Wind Farm) Winning bid in ORESS-1[43]

See also

[edit]

References

[edit]
  1. ^ "Athea | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  2. ^ a b c d e f g h i j k l m n o p q r s t u "Our Onshore Wind Farms in Ireland | Ørsted". orsted.ie. Retrieved 2023-09-21.
  3. ^ a b c d e "Locations". Bord Na Mona. Retrieved 2023-09-21.
  4. ^ "Bindoo | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  5. ^ a b c d e f g h i j k "Assets overview". Invis Energy. Retrieved 2023-09-21.
  6. ^ a b c d e f g h i j k l m n "Generation Asset Map". ESB Corporate. Retrieved 2023-09-20.
  7. ^ "Coomacheo | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  8. ^ "Coomatallin | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  9. ^ "Corneen | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  10. ^ "Culliagh | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  11. ^ "Curragh | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  12. ^ "Derrysallagh Wind Farm". energiagroup.com. Retrieved 2023-09-20.
  13. ^ "Dromada | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  14. ^ "Dunneill | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  15. ^ "Galway Wind Park | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  16. ^ "Gartnaneane | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  17. ^ "Home". grousemountwindfarm.ie. Retrieved 2023-09-20.
  18. ^ "Hollyford Wind Farm". energiagroup.com. Retrieved 2023-09-20.
  19. ^ "Kingsmountain | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  20. ^ "Knockastanna | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  21. ^ "Leanamore | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-21.
  22. ^ "Meenadreen Wind Farm". energiagroup.com. Retrieved 2023-09-20.
  23. ^ "Meentycat | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  24. ^ "Mullananalt | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  25. ^ "Home". Oweninny Wind Farm. Retrieved 2023-09-20.
  26. ^ "Rathcahill | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  27. ^ "Richfield | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  28. ^ "Tournafulla | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-20.
  29. ^ "Ballinagree Wind Farm - Ballinagree Wind Farm". 2022-08-08. Retrieved 2023-09-22.
  30. ^ "Cloghercorwindfarm.com". cloghercorwindfarm.com. Retrieved 2023-09-22.
  31. ^ "Coole Wind Farm Project". www.coolewindfarm.ie. Retrieved 2023-09-22.
  32. ^ "Coomgreenenergypark.com". coomgreenenergypark.com. Retrieved 2023-09-22.
  33. ^ "Cummeennabuddoge Wind Farm - Cummeennabuddoge Wind Farm". 2022-08-08. Retrieved 2023-09-22.
  34. ^ "Home - Cushaling Wind Farm". Retrieved 2023-09-22.
  35. ^ "Natural Power begins managing Cushaling wind farm". 30 January 2023. Retrieved 22 September 2023.
  36. ^ "Gort Uí Rathaile Wind Farm - Gort Uí Rathaile Wind Farm". 2022-08-08. Retrieved 2023-09-22.
  37. ^ "Inse Mhór Wind Farm - Inchamore Wind Farm". 2022-08-08. Retrieved 2023-09-22.
  38. ^ "€200m wind farm planned for Co Clare". RTÉ News. 28 May 2009.
  39. ^ website Archived 2013-04-15 at the Wayback Machine
  40. ^ "Arklow Bank Wind Park | SSE Renewables". www.sserenewables.com. Retrieved 2023-09-22.
  41. ^ "Clarus Offshore Wind Farm – Clarus Offshore Wind Farm". Retrieved 2023-01-17.
  42. ^ "The Project". Codling Wind Park. Retrieved 2023-09-22.
  43. ^ a b c d "Ireland makes history with its first offshore wind auction". WindEurope. 2023-05-12. Retrieved 2023-09-22.
  44. ^ "Dublin Array Details". Archived from the original on 2015-02-28. Retrieved 2015-01-08.
  45. ^ "Key Facts – Dublin Array". Retrieved 2021-10-19.
  46. ^ https://dublinarray.com/wp-content/uploads/2023/09/Dublin-Array-Autumn-Newsletter-2023.pdf
  47. ^ company site
  48. ^ "Inis Ealga – Inis Ealga Marine Energy Park". Retrieved 2023-01-17.
  49. ^ "Project Details". NISA | North Irish Sea Array - Offshore Wind Farm. Retrieved 2023-09-22.
  50. ^ Oriel website
  51. ^ "Shelmalere Offshore Wind Farm – Energy is in our Nature". Retrieved 2023-01-17.
  52. ^ "Project info". Sceirde Rocks Windfarm. Retrieved 2023-09-22.
[edit]