You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
sharkymark opened this issue
Jun 13, 2023
· 4 comments
· Fixed by #8513
Assignees
Labels
must-doIssues that must be completed by the end of the Sprint. Or else. Only humans may set this.s2Broken use cases or features (with a workaround). Only humans may set this.
What I'm seeing on my end is that audit build logs are labeled appropriately, but appear only after a subsequent build has been created.
So, for example, if I start a workspace, I will only see the audit start build log after I stop the workspace. To see the subsequent audit stop build log, I must spawn yet another build. Definitely buggy.
I will dig in some more this sprint to see what changed on the BE.
bpmct
added
the
must-do
Issues that must be completed by the end of the Sprint. Or else. Only humans may set this.
label
Jun 21, 2023
must-doIssues that must be completed by the end of the Sprint. Or else. Only humans may set this.s2Broken use cases or features (with a workaround). Only humans may set this.
Version:
v0.24.0+16ebe10
I have reproduced this in 2 separate deployments.
Workspace running, started 30-60 minutes ago

Audit logs

The text was updated successfully, but these errors were encountered: