Airport Line (Manchester Metrolink)

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Airport Line
Tram Across the Mersey, David Dixon, 4237015.jpg
A M5000 tram passing over the purpose built viaduct over the River Mersey on the Airport Line.
Overview
Type Tram/Light rail
System Manchester Metrolink
Locale South Manchester
Termini St Werburgh’s Road
Manchester Airport
Stations 15
Operation
Opened 3 November 2014
Character Reserved track and
street running
Rolling stock M5000
Technical
Line length 9 miles (14.5 km)[1]
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 volts DC overhead
Operating speed 50 mph (80km/h)
Route map
to Cornbrook
Trafford Bar
Firswood
Chorlton
St Werburgh's Road
to East Didsbury
Barlow Moor Road
Sale Water Park Parking
Northern Moor
Wythenshawe Park
Moor Road
Baguley
Roundthorn
Martinscroft
Benchill
Crossacres
Wythenshawe Town Centre BSicon BUS.svg
Robinswood Road
Peel Hall
Shadowmoss
Manchester Airport National Rail Airport interchange BSicon BUS.svg

The Airport Line is a tram line of the Manchester Metrolink in Greater Manchester running from Manchester city centre to Manchester Airport via the suburb of Wythenshawe. The line was opened in November 2014 as part of phase three of the system's expansion.

Route

The line runs mostly on reserved track alignments with short sections of street–running. The southern half of the route mostly uses the wide grass verges alongside roads.[2]

From Manchester city centre, the route is shared with the Altrincham Line as far as Trafford Bar, and then the South Manchester Line as far as St Werburgh's Road. The Airport Line proper starts at a junction just south of St Werburgh's Road stop, where the line leaves the former railway trackbed, and runs off to the south-west. It joins the Mauldeth Road, running along the central reservation to Barlow Moor Road stop. It then runs on street along Hardy Road for a short distance, before crossing onto a tram only viaduct crossing the River Mersey and the Mersey Valley flood plain.[2]

File:Metrolink Airport Line, Simonsway, David Dixon, Geograph 4235987.jpg
Tram running on tracks alongside Simonsway. Between Robinswood Road and Peel Hall.

The line then continues on a low embankment to Sale Water Park stop, serving the park of the same name; this stop is also near to Junction 6 of the M60 motorway and has park and ride facilities. The line then runs parallel to the M60 for a short distance before turning south-west and crossing it on a tram only bridge.[2]

After crossing the motorway, the line serves Northern Moor stop. Between Northern Moor stop and Wythenshawe Park stop the line runs on a strip of land which was originally reserved for a road scheme. The line then crosses onto Moor Road, where it serves Moor Road stop, before crossing onto a reserved track section alongside the road. A tram bridge takes the tracks over the Mid-Cheshire railway line and into Baguley stop. The line then runs alongside the road for the next few miles, serving stops at Roundthorn and Martinscroft, before crossing the M56 motorway on a purpose built bridge.[2]

The line then runs along Hollyhedge Road with other traffic, before turning onto a segregated section of track alongside Brownley Road, serving stops at Benchill and Crossacres. The route crosses to another segregated alignment on the south side of Poundswick Lane, crossing the northern end of Rowlandsway before turning left into Wythenshawe Town Centre stop.[2]

File:Metrolink Airport Line Map.png
Map of the Airport Line

The line then runs along segregated roadside track sections, for the next few miles, serving stops at Robinswood Road, Peel Hall and Shadowmoss, before passing under Ringway Road via an underpass, and into the terminus at Manchester Airport station: The two tram platforms at the Airport station were built alongside the mainline rail platforms allowing interchange between the trains and trams.[2]

The total distance, between St Werburgh's Road and Manchester Airport is 9 miles (14.5 km)[1]

History

The line was opened as part of the third phase of the system's development, which also included new lines to East Didsbury, Ashton-under-Lyne, and Rochdale.

Construction work for all Phase 3b lines began in March 2011.[3] On the Airport Line, a 580-tonne steel bridge was erected in Wythenshawe over the M56 motorway on 25 November 2012.[4] The Airport Line opened on 3 November 2014, more than one year early,[5] and at a cost of £368 million.[6]

Proposed future development

Wythenshawe Loop

The original plans for the line included a loop from Roundthorn tram stop to the existing line at Manchester Airport via the University Hospital of South Manchester (Wythenshawe Hospital) and Newall Green. The line would have had stops at Wythenshawe Hospital, Newall Green and Davenport Green.[7] Although axed in 2005 to control costs, the Wythenshawe Loop remains an aspiration of TfGM. The route could link with HS2 Manchester Interchange.[8]

Services

As of January 2016, trams operate from Manchester Airport every 12 minutes.[9] Due to capacity restraints, services currently terminate at Cornbrook on the edge of the city-centre, where passengers have to change tram for onward travel. It is planned however, that once the second city crossing is opened, Airport Line services will be extended to the city-centre and terminate at Manchester Victoria.[10] In March 2016, an early morning service was introduced between the airport and Firswood.[11] TfGM have indicated that there could also be a 6-minute service at peak times after 2017.[12]

See also

  • Styal Line; heavy-rail line also serving Manchester Airport.

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.

External links

Script error: No such module "Attached KML".