Gloucester and Sharpness Canal

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
A map of the canal from 1933
Gloucester and Sharpness Canal
River Severn
Gloucester Dock Lock (with lift bridge over)
Gloucester Docks
Victoria Dock
Dry Dock
Barge Arm
Llanthony Bridge
Llanthony Wharf, Bakers Quay
High Orchard Bridge
Monk Meadow Dock
Hempstead Bridge
Old section of Two Mile Bend
Netheridge Bridge
Old section of Two Mile Bend
Simms Bridge
Rea Bridge
Sellars Bridge
Parkend Bridge
River Frome
Saul Junction Foot Bridge
Stroudwater Navigation (Saul Junction)
Saul Junction Marina
Sandfield Bridge
Fretherne Bridge
Splatt Bridge
River Cam
Cambridge Arms Bridge
Patch Bridge
Purton Upper Bridge
Purton Lower Bridge
Sharpness Barge Arm (from old entrance)
High Level Bridge
Low Level Bridge
Sharpness Dock
Sharpness Lock
Tidal Basin
Tidal Basin Gates
River Severn

The Gloucester and Sharpness Canal or Gloucester and Berkeley Canal is a canal in the west of England, between Gloucester and Sharpness; for much of its length it runs close to the tidal River Severn, but cuts off a significant loop in the river, at a once-dangerous bend near Arlingham. It was once the broadest and deepest canal in the world. The canal is 26.5km[1] (16.5 miles) long.

18th century conception

Conceived in the Canal Mania period of the late 18th century, the Gloucester and Berkeley Ship Canal scheme (as it was originally named) was started by architect and civil engineer Robert Mylne. In 1793 an Act of Parliament was obtained authorising the raising of a total of £200,000.[2] The project rapidly encountered financial difficulties - to such an extent that Mylne left the project in 1798. By half way through 1799 costs had reached £112,000 but only 5½ miles of the canal had been completed.[3] Robert Mylne's role was taken over by James Dadford who had originally been engaged as resident engineer on the project in 1795.[4] Lack of funds resulted in the company ceasing to employ Dadford in 1800.[3]

Decade of capital raising

Between 1800 and 1810 various attempts were made to raise money to allow further building but they came to nothing.[3] Moneys from tolls and rents allowed for some improvements to be made to the basin at Gloucester in 1813.[5]

Eventual completion

From 1817 onwards the Poor Employment Act meant it was possible for the company to borrow money from the Exchequer Bill Loan Commission. This along with further share issues provided enough money to bring the scheme to completion.[6] After these significant delays, the canal opened in April 1827. In the course of its construction the canal had cost £440,000.[7] As opened the canal was 86½ feet wide, 18 feet (5.5 m) deep and could take craft of up to 600 tons. The longer of the two locks onto the canal proper was 115 feet (35 m) long.[7]

Eventual dividends

The canal at Patch Bridge, near the Wildfowl Reserve at Slimbridge

By the middle of the nineteenth century it proved possible to pay a small dividend, the debt to the Exchequer Bill Loan Commission having been repaid with the help of a loan of £60,000 from the Pelican Life Assurance Company.[7] In 1871 the last of the debts incurred in the course of funding the canal including the Pelican Life Assurance Company loan were paid off.[8] Where the Severn Railway Bridge (completed in 1879) passed over the canal a swing section was constructed [9] to avoid restricting headroom.

Early 20th century

In 1905 traffic exceeded 1 million tons for the first time.[10] Oil was added to the list of cargoes carried by the canal, with bulk oil carriers taking fuel to storage tanks sited to the south of Gloucester.[11] In 1937 the canal was navigated by the submarines HMS H33 and HMS H49.[12]

The canal was nationalized in 1948.[13] At the same time the Sharpness Dock Police which had policed the dock since 1874 were absorbed into the British Transport Police.[14] In 1955 the Board of Survey of Canals and Inland Waterways released a report that, among other things, described the Gloucester and Sharpness Canal as carrying substantial traffic and offering scope for commercial development.[15]

The Purton Hulks

The Sea Cadet training ship T.S. John Jerwood passes through Patch Bridge on the Gloucester & Sharpness Canal, on its way to the River Severn

In 1909, following a collapse in the bank of the river, the canal company's chief engineer Mr A. J. Cullis called for old vessels to be run aground along the bank of the Severn, near Purton, to create a makeshift tidal erosion barrier to reinforce the narrow strip of land between the river and canal.[16] Barges, trows and schooners were "hulked" at high tide, and have since filled with silt. More boats have been added, including the schooner Katherine Ellen which was impounded in 1921 for running guns to the IRA, the Kennet Canal barge Harriett, and ferrocement barges built in World War II.[17] 1999 saw Paul Barnett commence a privately funded research project which saw the site's 81 vessels recorded and recognized as the largest ships' graveyard in mainland Britain.[18] In 2010 British Waterways took control of the site in an attempt to protect it.[19]

Recent history

Today the canal can be used by boats up to 64m in length, 9.6m in beam and 32m in height. The maximum draft is 3.5 m.[1] By the mid 1980s commercial traffic had largely come to a halt with the canal being given over to pleasure cruisers with the exception of a few passages by grain barges.[11] The oil trade ceased in 1985 with the closure of the petroleum depot at Quedgeley.[9] In order to allow the A430 south-west bypass to be built the canal had to be diverted. The new section of channel was opened on 6 May 2006.[20] In January 2009 a project began to replace the Patch Bridge swing bridge with a motor powered design instead of the former hand cranked system.[21]

The canal links directly to the Stroudwater Navigation at Saul junction.

See also

References

The Gloucester and Sharpness Canal at Saul Junction
The Gloucester and Sharpness Canal at the entrance to Gloucester docks
  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Hadfield (1969), p.342
  3. 3.0 3.1 3.2 Hadfield (1969), p.344
  4. Hadfield (1969), p.343
  5. Hadfield (1969), p.345
  6. Hadfield (1969), p.346
  7. 7.0 7.1 7.2 Hadfield (1969), p.348
  8. Hadfield (1969), p.351
  9. 9.0 9.1 Paget-Tomlinson (2006), pp.124–125
  10. Hadfield (1969), p.352
  11. 11.0 11.1 Green (1999), p.27
  12. Tall and Kemp (1996), p.64
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.

Bibliography

  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.

External links

Lua error in package.lua at line 80: module 'strict' not found.