Kitimat
Kitimat | ||
---|---|---|
District municipality | ||
District of Kitimat[1] | ||
|
||
Location in British Columbia | ||
Coordinates: Lua error in package.lua at line 80: module 'strict' not found. | ||
Country | Canada | |
Province | British Columbia | |
Regional District | Kitimat-Stikine | |
Government | ||
• Mayor | Philip Germuth | |
Area | ||
• Total | 242.63 km2 (93.68 sq mi) | |
Elevation | 40 m (130 ft) | |
Population (2011)[2] | ||
• Total | 8,335 | |
• Density | 34.7/km2 (90/sq mi) | |
Time zone | PST (UTC-8) | |
• Summer (DST) | PDT (UTC-7) | |
Area code(s) | 250 / 778 / 236 | |
Website | http://www.kitimat.ca |
Kitimat is a district municipality in the North Coast region of British Columbia, Canada. It is a member municipality of the Regional District of Kitimat-Stikine regional government. The Kitimat Valley is part of the most populous urban district in Northwest British Columbia, which includes Terrace to the north along the Skeena River valley. The city was planned and built by the Aluminum Company of Canada (Alcan) during the 1950s.
Kitimat's municipal area is 242.63 km² (93.69 sq mi). It is located on tidewater in one of the few wide, flat valleys on the coast of British Columbia. The 2011 census recorded 8,335 citizens.[2]
The District of Kitimat Development Services situates the port of Kitimat as an integral part of the Northwest Corridor connecting North America to the Pacific Ocean and the Pacific Rim.[3]
Contents
History
"Kitimat" in the Tsimshian language refers to the Haisla First Nation as the "People of the Snow". Before 1950 the Kitimat township was a small fishing village at the head of the Kitimat Arm of the Douglas Channel, a deepwater fjord.[4]
The municipal town of Kitimat came into existence in the 1950s after the Provincial Government of British Columbia invited Alcan to develop hydroelectric facilities to support one of the most power-intensive of all industries — the aluminum smelting industry. The company built a dam, 16 km (10 mi) tunnel, powerhouse, 82 km (51 mi) transmission line, a deep sea terminal and smelter. The company also designed, laid out and assisted with the initial construction of the city. At the time, the combined development was considered "the most expensive project ever attempted by private industry."[4]
Alcan employed the services of city planner Clarence Stein in order to ensure the community design facilitated an environment that would attract and retain workers, although Alcan intended it to not be a company town.[5] Today, Kitimat benefits from the quality of planning resulting from the Garden City design concept. Stein's design kept industry well separated from the community with large areas for expansion. He also created looped streets surrounding an urban City Centre Mall and linked by over 45 km (28 mi) of walkways connecting to all areas of the community. The substantial greenspace areas and future expansion concepts designed by Stein have been upheld to this day by the city planners.
Economy
Aluminum producer Rio Tinto Alcan is the main employer in the municipality. Local government, schools, small manufacturing and service/retail are secondary contributors. Secondary core activities include engineering, import of petrochemical products (methanol and condensate), and metal fabrication. Approximately $5 billion in manufacturing investment is anticipated in the 2010-2015 period with a further $5 plus billion in the investigative stage over the next decade.[citation needed] Anticipated investment includes an approximately $2 billion modernization to the Rio Tinto Alcan facilities and $3 billion in the Kitimat liquefied natural gas export development on Haisla Industrial Land at Bish Creek. The export facility would see natural gas piped in from the Western Canadian Sedimentary Basin (particularly from shale gas developments such as the Montney and Horn River) and shipped to Asian markets.[6] The LNG Canada project, a joint venture between Shell and affiliates of Mitsubishi Corp., Korea Gas Corp., and PetroChina Investment Ltd. would, if permitted, begin construction in 2015 of a gas pipeline from northeastern BC and a LNG export terminal with an expected lifespan of 30 years. The terminal, located on the Douglas Channel near the aluminum refinery, would be able to accommodate two LNG vessels at a time. Annual volume would be 24 million tonnes.[7] In July 2014 the Financial Post reported that Apache Corp. will “completely exit” the Kitimat LNG mega-project planned for B.C.’s West Coast. The U.S. hedge fund Jana Partners LLC has pressured Houston-based Apache to sell its 50% stake in the BC shale gas plays.[8]
Pending energy projects that have identified Kitimat as a strategic gateway include Pacific Northern Gas's Pacific Trail Pipeline (federal and provincial environmental assessments issued) and the Enbridge Northern Gateway Pipelines (currently being reviewed by the National Energy Board).
Additional investigations into clean energy developments include a Kitimat port development project featuring break-bulk port facilities and consideration of the best uses for the former Eurocan Wharf.[citation needed] In addition, the decommissioning of the former Eurocan pulp and paper facilities or a slimmed down operation are still under consideration. There is also renewed interest in mineral development potential in the Kitimat area. The neighbouring community of Terrace is also in advanced stages of approval for a number of clean energy projects along with the associated infrastructure for linking those projects to the provincial electrical grid.
Air services for the community are provided through Northwest Regional Airport, with connections to Prince George, Smithers, and Vancouver.
Kemano hydroelectric project
External media | |
---|---|
Kemano-Kitimat transmission line | |
Images | |
Catenary | |
Video | |
Helicopter landing on catenary |
In the 1920s, the Provincial Government of British Columbia extensively evaluated the province's hydroelectric generating potential. In the late 1940s, the Canadian Government sought to tap the untapped resources of northwest British Columbia. All this led to the identification of the Eutsuk/Ootsa/Nechako River drainage basin as a potential site for a sizable reservoir. The potential of this vast system of rivers and lakes prompted British Columbia to invite Alcan to conduct a detailed investigation of the area. Alcan was searching for a site for a large aluminum smelter, an activity requiring vast amounts of electricity. Alcan concluded that the site was more than adequate to generate the required electricity, and decided to build a smelter there. The timing was right because the post-World War II boom saw a rising demand for aluminum.
Between 1951 and 1954, after signing the agreement with the British Columbia government for land and water rights, Alcan undertook the Kitimat - Kemano Project, one of the most ambitious Canadian engineering projects of the 20th century.[4] The project required not only building the Kenney Dam to reverse the Nechako River, but also boring a 16 km (10 mi) tunnel under Mt. Dubose, within the Coast Range, to the large hydroelectric Kemano Generating Station, built under Mt. Dubose. Electricity from Kemano is transported 80 km (50 mi) across mountains via a custom built twin circuit transmission line. After avalanches tore away transmission towers, a catenary system was built.[9]
In three years, 6,000 construction workers built the dam, tunnel, powerhouse, transmission line, smelter, and town. There was no road to Kemano before and after the project; everything had to be brought in by air or river.[10]
Further up the Kitimat River, the town of Kitimat was carved out of old growth forest. The company invested over CA$500 million (equivalent to CA$3.3 billion) and employed over 35,000 workers over the five years required to build the Kenney Dam, and the hydropower plant under Mt. Dubose, at the small community of Kemano, a 250,000 tpy aluminum smelter, a deepwater port open year round, a complete townsite designed for a population of 50,000, and a paved highway to the outside world. As a result of this large project, other companies saw the potential of the area, resulting in further industrial development in the Kitimat valley.
Directions
The only highway accessing Kitimat is Highway 37. Kitimat is located 63 km (39 mi) south of Terrace. Prince Rupert is 207 km (129 mi) northwest, and Prince George is 629 km (391 mi) to the east.
Climate
Kitimat has a very wet oceanic climate, albeit close to continental with significant temperature difference between winters and summers. The winters hover around the freezing mark, bringing snow.
Climate data for Kitimat | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Year |
Record high °C (°F) | 12.2 (54) |
13.0 (55.4) |
18.0 (64.4) |
27.5 (81.5) |
32.8 (91) |
37.0 (98.6) |
36.1 (97) |
36.0 (96.8) |
33.3 (91.9) |
25.0 (77) |
13.3 (55.9) |
10.0 (50) |
37.0 (98.6) |
Average high °C (°F) | 0.5 (32.9) |
3.1 (37.6) |
6.7 (44.1) |
11.7 (53.1) |
16.2 (61.2) |
19.5 (67.1) |
21.6 (70.9) |
21.4 (70.5) |
16.8 (62.2) |
10.1 (50.2) |
3.9 (39) |
1.2 (34.2) |
11.1 (52) |
Daily mean °C (°F) | −1.7 (28.9) |
0.3 (32.5) |
3.2 (37.8) |
7.1 (44.8) |
11.0 (51.8) |
14.5 (58.1) |
16.7 (62.1) |
16.5 (61.7) |
12.6 (54.7) |
7.2 (45) |
1.8 (35.2) |
−0.8 (30.6) |
7.4 (45.3) |
Average low °C (°F) | −4.0 (24.8) |
−2.5 (27.5) |
−0.3 (31.5) |
2.4 (36.3) |
5.7 (42.3) |
9.5 (49.1) |
11.7 (53.1) |
11.5 (52.7) |
8.3 (46.9) |
4.3 (39.7) |
−0.3 (31.5) |
−2.8 (27) |
3.6 (38.5) |
Record low °C (°F) | −25.0 (−13) |
−23.9 (−11) |
−19.4 (−2.9) |
−10.0 (14) |
−6.7 (19.9) |
−0.6 (30.9) |
3.9 (39) |
2.0 (35.6) |
−2.0 (28.4) |
−13.0 (8.6) |
−24.0 (−11.2) |
−25.0 (−13) |
−25.0 (−13) |
Average precipitation mm (inches) | 288.4 (11.354) |
186.8 (7.354) |
160.7 (6.327) |
128.3 (5.051) |
89.5 (3.524) |
73.1 (2.878) |
62.4 (2.457) |
95.7 (3.768) |
190.2 (7.488) |
323.5 (12.736) |
320.3 (12.61) |
291.8 (11.488) |
2,210.7 (87.035) |
Average rainfall mm (inches) | 195.7 (7.705) |
133.6 (5.26) |
134.5 (5.295) |
123.0 (4.843) |
88.7 (3.492) |
73.1 (2.878) |
62.4 (2.457) |
95.7 (3.768) |
190.2 (7.488) |
319.9 (12.594) |
266.6 (10.496) |
202.7 (7.98) |
1,886.1 (74.256) |
Average snowfall cm (inches) | 92.7 (36.5) |
53.2 (20.94) |
26.3 (10.35) |
5.4 (2.13) |
0.8 (0.31) |
0.0 (0) |
0.0 (0) |
0.0 (0) |
0.0 (0) |
3.5 (1.38) |
53.7 (21.14) |
89.1 (35.08) |
324.6 (127.8) |
Average precipitation days (≥ 0.2 mm) | 19.7 | 15.5 | 18.5 | 17.2 | 15.8 | 14.8 | 13.2 | 13.7 | 16.9 | 22.1 | 21.7 | 21.5 | 210.5 |
Average rainy days (≥ 0.2 mm) | 14.5 | 12.0 | 16.7 | 17.0 | 15.8 | 14.8 | 13.2 | 13.7 | 16.9 | 21.9 | 18.8 | 14.8 | 190.1 |
Average snowy days (≥ 0.2 cm) | 9.2 | 6.3 | 5.0 | 1.2 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 1.0 | 7.0 | 11.4 | 41.2 |
Mean monthly sunshine hours | 48.5 | 75.9 | 103.8 | 153.9 | 199.6 | 189.5 | 214.3 | 196.5 | 129.7 | 69.2 | 38.1 | 30.9 | 1,449.9 |
Percent possible sunshine | 19.5 | 27.7 | 28.3 | 36.6 | 40.3 | 37.1 | 41.7 | 42.7 | 33.9 | 21.1 | 14.8 | 13.3 | 29.7 |
Source: [11] |
Demographics
Historical population | ||
---|---|---|
Year | Pop. | ±% |
1991 | 11,305 | — |
1996 | 11,136 | −1.5% |
2001 | 10,285 | −7.6% |
2006 | 8,987 | −12.6% |
2011 | 8,335 | −7.3% |
[2][12][13] |
Canada 2011 Census | Population | % of Total Population | |
---|---|---|---|
Visible minority group Source:[14] |
South Asian | 135 | 1.6% |
Chinese | 45 | 0.5% | |
Black | 0 | 0% | |
Filipino | 120 | 1.4% | |
Latin American | 10 | 0.1% | |
Arab | 0 | 0% | |
Southeast Asian | 35 | 0.4% | |
West Asian | 0 | 0% | |
Korean | 0 | 0% | |
Japanese | 75 | 0.9% | |
Other visible minority | 0 | 0% | |
Mixed visible minority | 0 | 0% | |
Total visible minority population | 470 | 5.6% | |
Aboriginal group Source:[15] |
First Nations | 730 | 8.8% |
Métis | 170 | 2% | |
Inuit | 0 | 0% | |
Total Aboriginal population | 920 | 11% | |
White | 6,950 | 83.3% | |
Total population | 8,340 | 100% |
Controversies
The Alcan project has not been free of controversy. Politicians, aboriginal groups, and farmers and residents of the Nechako lakes district have long opposed the contractual release of provincial resources with the profits going to a private firm. Many individuals and groups protested the flooding caused by the creation of the new reservoir, with the destruction of homesteads, villages, burial grounds, and millions of board feet of prime timber, and the disruption of prime fish habitat on the Nechako River.
In the late 1980s, the company began work on the Kemano Completion Project which would have doubled the generating capacity of the Kemano plant. After Alcan had already bored a second tunnel through the mountain and extended the generating station within the mountain, the Provincial Government of the day called a halt to the project for a variety of reasons. Having invested over 500 million dollars in the project, Alcan took the provincial government to court. This controversy was settled when Alcan and the provincial government signed the 1997 KCP agreement.
Most of the first decade of the twenty-first century saw the District of Kitimat in court with the Provincial Government over the electricity rights granted to Alcan and its obligations to the Province and to the District.
Rio Tinto Alcan plans to increase the output of its Kitimat smelter from 250,000 MT/Yr to 400,000 MT/Yr and initially committed $300 Million to this effort. Since late 2008, relations between Rio Tinto Alcan and the District appear to have become more cordial, with the two parties working to achieve modernization of the aluminum facilities. In December 2011, Rio Tino Alcan announced its investment of $2.7 billion to complete the modernation of the smelter.[16]
Media
Newspapers
Radio
- FM 92.1 - CFNR-FM, First Nations community/ classic rock (Terrace)
- FM 92.9 - CJFW-FM-1, country (repeats CJFW-FM, Terrace)
- FM 97.7 - CKTK-FM, hot adult contemporary
- FM 100.3 - CFKI-FM, CBC Radio 2 (repeats CBU-FM, Vancouver)
- FM 101.1 - CBUK-FM, CBC Radio One (repeats CFPR, Prince Rupert)
- FM 105.1 - CBUF-FM-5, Première Chaîne (repeats CBUF-FM, Vancouver)
Television
- Channel 3 - CFTK-TV, CBC Television private affiliate (Terrace)
- DTBS cable channel 10
See also
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 4.0 4.1 4.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Press Release: Rio Tinto to invest US$2.7 billion to complete the modernisation of the Kitimat aluminium smelter in Canada. Online at http://www.kitimatworksmodernization.com/pages/posts/rio-tinto-to-invest-us2.7-billion-to-complete-the-modernisation-of-the-kitimat-aluminium-smelter-in-canada35.php
- ↑ Kitimat Northern Sentinel
- ↑ Kitimat Daily Online
External links
- District of Kitimat
- Haisla First Nation
- Northern Sentinel the local paper
- Kitimat Daily an online alternative news site
- Kitimat Tourism Website
- Regional District of Kitimat-Stikine
- Kitimat Historical Weather
- Rio Tinto Alcan BC
- Kitimat LNG Facility
- "Engineers Invade Another Wilderness - Huge Canadian Power Project Marks 20th Century Frontier Boom" , by Richard Neuberger detailed 1951 Popular Science article on the Kemano Hydro Project
|
Skeena Country | Terrace | New Hazelton | |
Prince Rupert | Kitimat Ranges | |||
|
||||
Hecate Strait | Kemano |
Lua error in package.lua at line 80: module 'strict' not found.