Priest Rapids Dam
Priest Rapids Dam | |
---|---|
File:PrstRpdsDam1.jpg
From the west side of the Columbia River
|
|
Location | Grant / Yakima counties, Washington |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Construction began | July 1956 |
Opening date | 1959 (First Generation) 1961 (Full Completion) |
Dam and spillways | |
Impounds | Columbia River |
Height | 178 ft (54 m) |
Length | 10,103 ft (3,079 m) |
Reservoir | |
Creates | Priest Rapids Lake |
Total capacity | 237,100 acre⋅ft (0.2925 km3) |
Power station | |
Turbines | 10[1] |
Installed capacity | 955.6 MW[2] |
Priest Rapids Dam is a hydroelectric, concrete gravity dam; located on the Columbia River, between the Yakima Firing Range and the Hanford Nuclear Reservation, and bridges Yakima County and Grant County, in the U.S. state of Washington. The dam is 24 miles south of the town of Vantage, and 47 miles northwest of the city of Richland. It is located at mile marker 397.1 from the mouth of the Columbia. It is owned by the Grant County Public Utility District. Priest Rapids, for which the dam was named, are now submerged beneath the dam's reservoir.
Priest Rapids Dam is part of the Columbia River Basin system of dams.
Contents
History
After the disaster of 1949 Vanport Flood on the lower Columbia River, around Vancouver, Washington, and Portland, Oregon, the federal government established the Priest Rapids Project under the Flood Control Act of 1950 (Public Law 81-516; May 17, 1950). The U.S. Army Corps of Engineers decided the project would not be a top priority, so the Grant PUD began looking at taking over the project from the USACE in 1952. With the passage of Public Law 83-544 in 1955, Congress gave Grant PUD the right to proceed. Revenue bonds were issued for construction to began in July 1956, first generation occurred in 1959, and the dam was completed in 1961. Its reservoir is named Priest Rapids Lake, and extends 18 miles upstream to spillway of Wanapum Dam. Downriver from Priest Rapids Dam is Hanford Reach, the only free-flowing, non-tidal stretch of the Columbia River in the United States.
The initial license expired in 2005, after which the Grant County PUD operated the dam on yearly license extensions while negotiations for license extension proceeded. The Federal Energy Regulatory Commission approved a license extension of 44 years for both this dam and the upstream Wanapum dam on April 17, 2008. The license extension was conditioned upon programs to:[3][4][5]
-
- modernize the power generation capability of the dam
- monitor water quality
- improve wildlife habitat
- protect nearly 700 Wanapum Tribe archaeological sites in the vicinity
- enhance recreation with new campsites, picnic areas and trails
See also
References
- ↑ Priest Rapids Dam at Grant County PUD
- ↑ Grant County PUD
- ↑ Pratt, Christine. - "Feds approve new license for Grant PUD dams" - Wenatchee World - April 18, 2008
- ↑ "New license OK'd for Priest Rapids, Wanapum dams on Columbia" - Associated Press - (c/o Tri-City Herald) - April 19, 2008
- ↑ "FERC Live Video & Audio Webcasts and Archives" - FERC - April 17, 2008 - FERC Open Meeting - Video with Audio Webcast Archive: Windows Media or RealPlayer; Downloadable MP3 format audio files
External links
- Pages with broken file links
- Dams on the Columbia River
- Dams in Washington (state)
- Buildings and structures in Grant County, Washington
- Hydroelectric power plants in Washington (state)
- Buildings and structures in Yakima County, Washington
- United States local public utility dams
- Dams completed in 1959
- Energy infrastructure completed in 1959
- Energy infrastructure completed in 1961
- Gravity dams