Norwegian railway signaling

From Infogalactic: the planetary knowledge core
(Redirected from Railway signaling in Norway)
Jump to: navigation, search

The signalling system used on the rail transport in Norway is regulated by the Regulations of December 4, 2001 no. 1336 about signals and signs on the state's railway network and connected private tracks.

The first signalling system on the Norwegian railway system was a mechanically operated semaphore system introduced at Drammen station in 1893. The first electrically operated light signal system was delivered by AEG in 1924. Today, only electrically operated light signals are used.

Train radio

Between 1993 and 1996, NSB rolled out the analog train radio system Scanet. Developed by Ascom Radiocom, it was only installed on the primary railway lines. The system allows radio communication between a train dispatcher, and train drivers and other users involved in railway operations. Scanet was also connected to the automatic train control system.[1] However, several lines lack the system, including the Arendal Line, the Flåm Line, the Meråker Line, the Nordland Line, the Rauma Line, the Røros Line, the Inner Østfold Line, the northern part of the Gjøvik Line, and several tunnels along the Bergen Line and the Sørland Line. The Åsta accident in 2000 spurred the need to give all parts of the railway coverage with train radio.[2] On these lines, the dispatcher and drivers had to communicate using the Nordic Mobile Telephone (NMT 450) standard, a system which the operator Telenor discontinued in 2002.[3]

Scanet was replaced by Global System for Mobile Communication – Railway (GSM-R) between 2004 2007, with the systems first being installed on the lines without Scanet.[4] The system, delivered by Nokia Siemens Networks, was on time and on budget, and made Norway one of the first countries to fully implement the system throughout Europe.[5] After GSM-R was fully implemented on 1 November, Scanet was gradually closed.[6] The new system has been characterized as simpler to use and giving better audio quality than Scanet.[7] The implementation cost 1.8 billion Norwegian krone and covers the entire network.[4]

Means of signalling

The following means of signalling are used:

  • Signal flags
  • Hand-held signal lamps
  • Signal whistle
  • Arm signals
  • Fixed light signals
  • Fixed sound signals
  • Signal signs
  • Orientation posts
  • Locomotive whistle
  • Locomotive and train signal lamps

The fundamental meaning of the signal colors

  • Red always indicates "stop".
  • Violet indicates that the associated level crossing signal shows "Stop short of the level crossing".
  • Yellow indicates "caution".
  • Green indicates "permission to run".
  • White indicates "clear line".

Light signals

Light signals show one of the following aspects:

Main signals

Signal Meaning Used in
55px Signal 20A – Stop – flashes The train must stop short of the signal. Station entry signals, block signals.
50px 50px Signal 20B – Stop The train must stop short of the signal. Station exit signals, inner signals.
50px 50px Signal 21 – Proceed (to diverging route) The train can proceed, usually via one or more diverging switches. Station entry signals, station exit signals, inner signals, block signals.
50px Signal 22 – Proceed The train can proceed, not via diverging switches. Station entry signals, station exit signals, inner signals, block signals.

Fail safe

If one of the green lights in signal 22 fails, the indication becomes the lower speed signal 21 – this is fail-safe. Other nearby countries reverse the role of the single green aspect and double green aspect.

Distant signals

Image Signal Meaning
55px Signal 23 – Expect stop – flashes The associated main signal shows signal 20A or 20B.
55px Signal 24 – Expect to proceed (to diverging route) – flashes The associated main signal shows signal 21.
55px Signal 25 – Expect to proceed – flashes The associated main signal shows signal 22.

Wrong-side failure

If the yellow light in signal 24 fails, the signal displays a higher speed indication, which would be a wrong-side failure. To prevent this, the yellow light would be proved to be operating before the green light is displayed (that is, the yellow is shown before the green, if the yellow fails, the green isn't shown and the signal stays totally dark).

Warning systems

Norway uses the Ericsson ATP warning system, also used on Perth's suburban railway network.

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.

External links

Norwegian signalling rulebook