Yards Creek Generating Station
Yards Creek Generating Station | |
---|---|
Location of Yards Creek Generating Station in Warren County, New Jersey
|
|
Country | United States |
Location | Blairstown, New Jersey |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Owner(s) | PSEG FirstEnergy |
Pumped-storage power station | |
Upper reservoir | Upper Yards Creek Reservoir |
Upper res. capacity | 5,013 acre⋅ft (6,183,000 m3) |
Lower reservoir | Lower Yards Creek Reservoir |
Lower res. capacity | 5,452 acre⋅ft (6,725,000 m3) |
Pump-generators | 3 x 140 MW reversible Francis-type |
Power generation | |
Nameplate capacity | 420 MW |
Annual generation | 753.7 GWh |
Yards Creek Generating Station is pumped-storage hydroelectric plant in Blairstown and Pahaquarry in Warren County, New Jersey The facility is jointed owned by subsidiaries of Public Service Enterprise Group[1] and LS Power, which purchased the FirstEnergy share in 2014.[2] It has an installed capacity of 420 MW.
Contents
Location
The facility is located in the Delaware Water Gap region of the New Jersey Skylands. When built the complex stretched in Pahaquarry, which got its name from the word Pahaquarra, which was a derivation of the Native American word Pahaqualong, which meant "the place between the mountains beside the waters". The township dissolved in 1997, becoming part of Hardwick Township[3]
Operations
Commercial operation began in 1965 and the power station was upgraded in the 1990s. Yards Creek consists of two reservoirs created by earth-fill embankment dams. The upper and lower reservoirs are separated by an elevation of 700 ft (210 m).[4] Water is conveyed between the plant & the Upper Reservoir via an 18’ diameter 1,800’ long exposed steel pipe At full station load, approximately 4 million gpm of water is released (9000 cfs). The full upper reservoir will last 5.7 hours at Hydraulic Turbine nameplate capacity. The storage facility provides energy regulation and spinning reserve during on-peak hours, and it provides an energy sink off-peak (11P.M. -7 A.M.) to allow fossil and nuclear plants to remain more fully loaded.[5][6]
See also
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Bewley, Joel. "Lost to merger, a town vanished Tiny Pahaquarry Township gave up in 1997.", The Philadelphia Inquirer, October 23, 2006. access date 2014-12-31 "Pahaquarry, a Lenni-Lenape word that means 'the place between the mountains beside the waters,' rested between the Delaware River and the Kittatinny Ridge.... It lost steam and funding and was finally deauthorized by Congress in 1992."
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- Blairstown, New Jersey
- Buildings and structures in Warren County, New Jersey
- Hydroelectric power plants in New Jersey
- Pumped-storage hydroelectric power stations in the United States
- Energy infrastructure completed in 1965
- 1965 establishments in New Jersey
- Dams in New Jersey
- Earth-filled dams
- Dams completed in 1965
- Public Service Enterprise Group