Koradi Thermal Power Station
Koradi Thermal Power Station | |
---|---|
Location of Koradi Thermal Power Station in Maharashtra
|
|
Country | India |
Location | Koradi near Nagpur, Maharashtra |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Commission date | 6 June 1974[1] |
Owner(s) | Mahagenco |
Thermal power station | |
Primary fuel | Coal |
Type | Closed cycle with cooling tower. |
Cooling source | Balancing Tank |
Power generation | |
Units operational | Zamech ELBLAG, Poland and BHEL manufactured |
Nameplate capacity | 1700 MW |
Source: Mahagenco[2] |
Koradi Thermal Power Station (KTPS) is located at Koradi near Nagpur, Maharashtra. The power plant is one of the four major power plants in Vidarbha – a power surplus region of India.[3] The power station began operations in 1974 and is one of the nine active power stations operated by Maharashtra State Power Generation Company Limited (Mahagenco), a subsidiary of Government of Maharashtra owned Maharashtra State Electricity Board (MSEB).[4] The plant operates 8 units and has a total power generation capacity of 1700 MW.[1] A proposed 440 kilovolt high power transmission line from Koradi to Bhusawal would join Nagpur with Mumbai.[5] KTPS campus also contains training institute of MahaGenco for middle and senior level engineers, technicians and other staff.[6]
Contents
Power station
KTPS is located on the northern side of Nagpur and is spread across an area of 30,337 km2. Coal for KTPS comes from various nearby collieries of Western Coalfields Limited (WCL) located at Silewara, Pipla, Patansavangi, Kamptee, Inder, Walni, Gondegaon and Saoner. These are at an average distance of 10 kilometres (6.2 mi) away. The plant approximately requires 16,000 to 17,000 tonnes of coal per day.[2]
The water for KTPS comes from water reservoir of nearby Totaladoh hydroelectric power station.[7] Also, Nagpur Municipal Corporation (NMC) provides treated water from its sewerage treatment plant.[8] According to MSEB, the average unit cost of power generation at KTPS is 6.28 paise/kWh at 70 percent load factor while it is 13.52 paise/kWh at 25 percent load factor. The average cost for transmitting this power to Mumbai is 1.26 paise/kWh.[9]
Since its commissioning, KTPS saw expansion in stages. First unit of 115 MW began in 1974. Later, three more units each of 115 MW, were added between 1975 and 1976 while 200 MW unit was added in 1978. Two more units, of 210 MW each, between 1982 and 1983.[1] MSEB has finalized further expansion by increasing the capacity of 3 units to 660 MW thereby taking the total capacity of KTPS to 1560 MW. The work is expected to finish by 2014.[10] Bharat Heavy Electricals Limited (BHEL) is expected to get equity participation by supplying important equipments in the ₹80 billion (US$1.2 billion) expansion plan.[11]
In order to reduce air pollution the plant's units are equipped with electrostatic precipitators.[12]
Capacity
Stage | Unit Number | Capacity (MW) | Date of Commissioning | Status |
---|---|---|---|---|
Stage 1 | 1 | 115 | 1974 June | Not Running |
Stage 1 | 2 | 115 | 1975 March | Not Running |
Stage 1 | 3 | 115 | 1976 March | Not Running |
Stage 1 | 4 | 115 | 1976 July | Not Running |
Stage 2 | 5 | 200 | 1978 July | Running |
Stage 3 | 6 | 210 | 1982 March | Running |
Stage 3 | 7 | 210 | 1983 January | Running |
Stage 4 | 8 | 660 | 2015 March | Running |
Stage 4 | 9 | 660 | Under development | |
Stage 4 | 10 | 660 | Under development | |
Total | Ten | 2600 |
MAHAGENCO has alredy decided to close Unit 5 and 6 and eventually also stop unit 7. All these units are more than 30 years old and prodciung with poor load factor.
Thermal Power Research Center
The Central Power Research Institute (CPRI) of Government of India, which serves as regulating body for testing of instruments and uploading of licenses in India, is going to set up a Thermal Research Centre (TRC) at Koradi. However, the KTPS expansion plans have created a problems in land acquisition for TRC.[13]
Disruptions
On February 27, 2005, a major fire broke out at KTPS and had to be shut down causing blackouts in most districts of Marathawada.[14] In May 2007, the power plant was shut down due a strike by workers.[15]
References
- ↑ 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.[dead link]
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.[dead link]
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
Mahagenco has sought permission from Maharashtra Electricity Regulatory Commission (MERC) to close down unit 5 and 6 of Koradi (200 MW and 210 MW). Genco wants to shut 1,040MW generation Ashish Roy | TNN | Jul 4, 2014