Leonardo (ISS module)

From Infogalactic: the planetary knowledge core
(Redirected from Leonardo MPLM)
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

Leonardo Permanent Multipurpose Module
Interior of Leonardo

The Leonardo Permanent Multipurpose Module (PMM) is a module of the International Space Station. It was flown into space aboard the Space Shuttle on STS-133 on 24 February 2011 and installed on 1 March. Leonardo is primarily used for storage of spares, supplies and waste on the ISS, which is currently stored in many different places within the space station. The Leonardo PMM was a Multi-Purpose Logistics Module (MPLM) before 2011, but was modified into its current configuration. It was formerly one of three MPLM used for bringing cargo to and from the ISS with the Space Shuttle. The module was named for Italian polymath Leonardo da Vinci.

Previous proposals

A European proposal suggested equipping the Donatello MPLM with enhanced micrometeoroid and orbital debris protection and cooling systems and leaving it attached to the ISS after the Space Shuttle fleet is retired. Costs for such MPLM modifications were estimated at $20M to $40M per unit. The MPLM would then be called a Permanent Multipurpose Module (PMM), and it would house spare parts and supplies, allowing longer times between resupply missions. The proposal was rejected by NASA because it would require changes to existing plans and would entail additional costs.[1] Internal discussions continued[2] and managers considered the possibility of STS-133, which at that time was planned to be the last Shuttle flight, leaving its MPLM permanently attached.[3] The United Launch Alliance also published a proposal for a system that could allow additional ISS modules to be launched on an EELV even after the retirement of the Shuttle.[4]

On August 5, 2009 it was announced that STS-133 would indeed leave one MPLM permanently attached to the station.[5] In October 2009, it was confirmed that Leonardo would be the MPLM converted to a PMM.[6] It was launched on February 24, 2011. The PMM was transferred to the station using the Shuttle robotic arm and mated to the nadir (Earth) facing port of Unity.

On May 27, 2015, at 13:08 UTC, the PMM was relocated from the nadir port of the Unity module to the forward-facing port of the Tranquility (Node 3) module. This was done in order to allow Unity's nadir port to serve as a berthing port for future U.S. Commercial Crew Development spacecraft. [7]

Modifications

PMM Leonardo at the Space Station Processing Facility (SSPF).

After returning to Earth on April 20, 2010 at the end of the STS-131 mission, the Leonardo MPLM was moved to the Space Station Processing Facility (SSPF) at the Kennedy Space Center in Florida to undergo modifications. To convert the Leonardo MPLM into the PMM, NASA made the following modifications: removal of +Y grapple fixture (Flight Releasable Grapple Fixture, or FRGF), removal of ROFU (Remotely Operated Fluid Umbilical) components, replacement of CBM seal, installation of new forward end cone MMOD shields, feed through seal replacement, and installation of visiting vehicle retro-reflectors.

In addition, the Multi-layer insulation (MLI) blankets from the never-flown Donatello MPLM were cannibalized for use on Leonardo. The blankets were removed and returned to Italy where they were reinforced with Nextel/Kevlar to provide better protection against micro-meteorites. The upgraded blankets were then installed on about two-thirds of Leonardo's surface area.[8]

The Leonardo PMM mass is 21,817 pounds (9,896 kg).[9]

As an MPLM

Leonardo
Leonardo being prepared for flight on STS-105
Leonardo being prepared for flight on STS-105
Operator NASA
Major contractors ASI
Bus MPLM
Mission type Logistics
Carrier rocket Space Shuttle
Launch site Kennedy LC-39
Mission duration ~2 weeks
Homepage NASA MPLM
Mass 4,082 kilograms (8,999 lb)[10]
Orbital elements
Regime Low Earth
10 March 2001 - The Leonardo Multi Purpose Logistics Module rests in Discovery's payload bay in this view taken from the ISS by a crew member using a digital still camera during STS-102.

The Leonardo MPLM, also known as MPLM-1, was one of three Multi-Purpose Logistics Modules which were operated by NASA to transfer supplies and equipment to and from the International Space Station. Leonardo was used for eight of the twelve MPLM flights to the space station, with Raffaello being used for the other four. It was the first MPLM to be launched, making its first flight in March 2001, aboard Space Shuttle Discovery on STS-102. Following its last flight as an MPLM, on STS-131 in April 2010, it underwent conversion to become the Permanent Multipurpose Module, and was launched aboard Discovery on STS-133 to become a permanent component of the station.

Like the other Multi-Purpose Logistics Modules, it was constructed by the Italian Space Agency, who chose to name it after Leonardo da Vinci.[10] Construction began in April 1996, and the module was delivered to NASA at the Kennedy Space Center in August 1998 by an Airbus Beluga aircraft.[11]

Flights

Mission Orbiter Launch (UTC)[12] Landing (UTC) Remarks
STS-102 Discovery 8 March 2001 21 March 2001
STS-105 Discovery 10 August 2001 22 August 2001
STS-111 Endeavour 5 June 2002 19 June 2002
STS-121 Discovery 4 July 2006 17 July 2006
STS-126 Endeavour 15 November 2008 30 November 2008
STS-128 Discovery 29 August 2009 11 September 2009
STS-131 Discovery 5 April 2010 20 April 2010
STS-133 Discovery 24 February 2011 N/A Leonardo was left on-station to become the PMM.

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. http://www.spaceflightnow.com/shuttle/sts133/101007payloads/
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. 10.0 10.1 Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.

External links