N4 road (Ireland)
N4 road | |
---|---|
Lua error in Module:Infobox_road/map at line 16: attempt to index field 'wikibase' (a nil value). | |
Location | |
Primary destinations: |
(bypassed routes in italics) |
Road network | |
M4 motorway | |
---|---|
Lua error in Module:Infobox_road/map at line 16: attempt to index field 'wikibase' (a nil value). | |
Route information | |
Part of | |
Length: | 62 km (39 mi) |
Existed: | 1994 – present |
History: | Completed in 2005 |
Major junctions | |
From: | Lucan |
To: | Kinnegad |
Location | |
Primary destinations: |
Leixlip, Kilcock, Enfield |
Road network | |
The N4 road is a national primary road in Ireland, running from Dublin to the northwest of Ireland and Sligo town. The M6 to Galway diverges from this route after Kinnegad, while the N5 to Westport diverges at Longford town. The section of the N4 that is motorway standard is designated the M4 motorway.
Contents
Road standard
The N4 originates at an intersection with the M50 motorway at Junction 7. This is also Junction 1 of the N/M4. The Liffey Valley Shopping Centre is located at junction 2. The road has three lanes and a bus lane in each direction between the M50 and start of the M4 at Leixlip.
The N4 was the only one of the main inter-urban national routes whose dual-carriageway section continued into the city centre; however, the section inside the M50 was re-classified as the R148 in 2012.[1]
Heading west, the PPP motorway section (see below) ends west of Kinnegad, and the motorway terminates 5 km further west; it continues as HQDC and bypasses Mullingar. From the Mullingar bypass to Edgeworthstown, the road is wide single carriageway with hard shoulders. Between Edgeworthstown and Longford, there is a lower standard single carriageway road. Between Longford and Rooskey single carriageway continues at a higher standard. Dromod and Rooskey were bypassed in late 2007. This section of road consists of 3 roundabouts and Type 2 dual carriageway, i.e.: 2 lanes in each direction and no hard shoulder. The road resumes as a single carriageway with hard shoulders until it reaches Carrick on Shannon, where it becomes a local urban road through five roundabouts, and passing over the River Shannon into County Roscommon. The road becomes high quality single carriageway bypass 3 km outside of Boyle town with periodic alternating overtaking lanes passing Lough Key Forest Park and Ballinafad until it reaches Castlebaldwin. From Castlebaldwin to the Collooney dual carriageway the road is a single narrow carriageway with intermittent hard shoulders and several dangerous bends. The road becomes near-motorway standard dual carriageway again at Collooney, approaching Sligo town.
Map of route
M4 motorway
The section from Leixlip to west of Kinnegad is the M4 motorway. The first section of this motorway (Leixlip - Kilcock) was opened in 1994.
Tolled section of the M4 motorway
Under the Government announcement of the pilot projects on 1 June 1999 this project was to be assessed by the NRA for its suitability to be advanced as a Public-private partnership (PPP). Subsequently the project was included as one of the projects approved under Tranche II of the PPP Roads programme as announced by the NRA in June 2000. The project involved the construction of 39 km of motorway from Kinnegad to Kilcock and is an extension of the Kilcock-Maynooth-Leixlip motorway on the N4/N6 Sligo/Galway to Dublin route. The motorway by-passes the towns of Enfield and Kinnegad.
The PPP contract was awarded in March 2003 to the EuroLink Consortium (SIAC Construction Ltd and Cintra - Concesiones de Infraestructuras de Transporte S.A.) and allows for them to collect tolls for 30 years from that date.
This tolled section from (Kilcock - Kinnegad) opened on 12 December 2005, and is the second most expensive toll road in Ireland (after the Dublin Port Tunnel). A toll of €2.90 (as of 2013) for cars is charged at a toll plaza just west of Kilcock and at smaller toll plazas at on and off ramps at Enfield. Between Enfield and Kinnegad no further access to the M4 is possible.
Eurolink operate this toll scheme, the first in Ireland not operated by NTR plc. From 2005 to 2007, Eurolink started to accept several tags issued by other motorways such as M1, M8, eTrip and Dublin Port Tunnel tags. Finally on 14 June 2007 NTR plc joined the Nationwide Electronic Toll Payment System introducing their popular EazyPass tags on the system and allowing all other toll plazas in the country (different from those owned by NTR plc) to accept them,[2] meaning that each toll company's electronic tag will work on all toll roads in the State.
In the 1 July 2006 edition of the Meath Chronicle it was claimed that up to 10% of the €420 million road project had "to be ripped up and replaced" shortly after it opened due to rushed construction, however this cost would have had to be carried by the toll operators, not the state, as per the contract.
The bypassed former N4 road has been reclassified as the R148.
Junctions
Westbound exit | Junction | Eastbound exit |
M50 motorway : Dublin Port, Bray and all other routes (M50) | M50 motorway : Dublin Port, Bray and ALL OTHER ROUTES (M50) | |
Liffey Valley Interchange: Clondalkin, Liffey Valley Shopping Centre (R113) | Liffey Valley Interchange: Clondalkin, Liffey Valley Shopping Centre (R113) | |
Ballydowd Interchange: Lucan, Baldonnel (R136), | Ballydowd Interchange: Lucan, Baldonnel (R136), | |
Newcastle Road Interchange: Lucan, Newcastle (R120), | Newcastle Road Interchange: Lucan, Newcastle (R120), | |
Dodsboro | 30px | Lucan, Dodsboro, R835 |
Leixlip Interchange: Leixlip (R148) Celbridge (R403) | Leixlip Interchange: Leixlip (R148) Celbridge (R403) | |
Westbound exit | Junction | Eastbound exit |
Leixlip West, Celbridge West R449 | Leixlip West, Celbridge West R449 | |
Maynooth, Clane, Naas | Maynooth, Naas | |
Kilcock, Clane R407 | Kilcock, Clane R407 | |
Enfield, Edenderry R402 | Enfield, Edenderry R402 | |
Enfield services | Enfield services | |
Kinnegad R401 | Kinnegad R401 | |
Galway, Athlone (M6 ) | No access | |
Kinnegad | Kinnegad | |
McNead's Bridge | McNead's Bridge | |
Westbound exit | Junction | Eastbound exit |
The Downs R156 | The Downs R156 | |
Mullingar South, Tullamore N52 | Mullingar South, Tullamore N52 | |
Mullingar, Delvin N52 | Mullingar, Delvin N52 | |
Mullingar North, Castlepollard N52 | Mullingar North, Castlepollard N52 | |
Road continues as N4 for Mullingar, Longford, (N5), Sligo |
Motorway reclassification
On 28 August 2009 the Department of Transport implemented the second round of proposed reclassifications of dual carriageways as motorways under the Roads Act 2007. A short section of the N4, between Kinnegad (J12) and McNead's Bridge (J13) was affected by this. This extended the M4 westward by 6.8 km.
Bypasses
- Palmerstown – 1987[citation needed]
- Lucan – 1988
- Chapelizod - 1990
- Leixlip, Maynooth, Kilcock – 1994
- Mullingar – 1994
- Longford – June
- Drumsna, Jamestown – 1997
- Collooney, Ballisodare – January 1998
- Boyle, Ballinafad – 1998-1999
- Sligo (Partially) – September 2005
- Enfield, Kinnegad – December 2005
- Edgeworthstown – June 2006
- Dromod, Roosky – December 2007
Upgrades
In July 2009 an upgrade of the section between the M50 junction and the Leixlip interchange was completed. On this section the road is three lanes in each direction, the median crossings have been removed and the junction with the R120 is now a fully grade-separated junction. Private accesses and some left turns remain preventing the section from being designated a motorway. The speed limit is 80 km/h. [2] There are now no signal controlled junctions on the N/M4 between Palmerstown and the Sligo throughpass.
In 2013 a 5-km stretch of dual carriageway with at-grade crossover junctions between the M4 and the Mullingar bypass was upgraded to HQDC.
Planned improvements to the route
- Mullingar bypass to Longford; 40 km dual carriageway ; at constraints study stage[3]
- Dromod to Carrick on Shannon; 11 km; at feasibility study stage[4]
- Carrick on Shannon Bypass; 10 km; preliminary design stage[5]
- Cortober to Castlebaldwin; 28 km retro upgrade of standard single carriageway road to 2+1 road; at constraints study stage[6]
- Collooney to Castlebaldwin; 15 km greenfield 2+2 road; at preliminary design stage[7]
- Sligo Western Relief Road; 8 km; at feasibility study stage[8]
- The motorway-style dual carriageway of the N4, running from Collooney - 15 km outside Sligo - to Summerhill in Sligo town is expected to be re-classified as Motorway in the near future.[citation needed]
See also
References
- Pages with broken file links
- Articles with unsourced statements from July 2009
- Articles with unsourced statements from April 2009
- National primary roads in the Republic of Ireland
- Roads in County Dublin
- Roads in County Kildare
- Roads in County Meath
- Roads in County Westmeath
- Roads in County Longford
- Roads in County Leitrim
- Roads in County Roscommon
- Roads in County Sligo