Severn Beach railway station
Severn Beach | |
---|---|
Location | |
Place | Severn Beach |
Local authority | South Gloucestershire |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Grid reference | ST540847 |
Operations | |
Station code | SVB |
Managed by | Great Western Railway |
Number of platforms | 1 |
DfT category | F1 |
Live arrivals/departures, station information and onward connections from National Rail Enquiries |
|
Annual rail passenger usage* | |
2002/03 | 36,074 |
2004/05 | 29,295 |
2005/06 | 37,088 |
2006/07 | 38,202 |
2007/08 | 54,034 |
2008/09 | 74,712 |
2009/10 | 88,504 |
2010/11 | 0.113 million |
2011/12 | 0.142 million |
2012/13 | 0.167 million |
2013/14 | 0.196 million |
History | |
Original company | Great Western Railway |
5 June 1922 | Opened (as excursion platform)[1] |
26 May 1924 | Fully opened[1] |
9 July 1928 | Passenger services extended to Pilning[1] |
10 September 1963 | Closed to goods traffic[1] |
November 1964 | Line to Pilning closed to passengers[1][2] |
July 1968 | Line to Pilning closed completely[1] |
National Rail – UK railway stations | |
|
|
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Severn Beach from Office of Rail and Road statistics. Methodology may vary year on year. | |
UK Railways portal |
Severn Beach railway station serves the village of Severn Beach, England. This is the terminus of the Severn Beach Line.
This station is 13.5 miles (21.7 km) north west from Bristol Temple Meads on the Severn Beach Line. The station is managed by Great Western Railway, who are also the sole provider of trains serving the station.
Contents
History
The railway reached Severn Beach in 1900, but was at first used only for goods traffic to Pilning. A platform was built beside the line at Severn Beach by the Great Western Railway in 1922, and a bay platform added to the west for excursion traffic, with terminating passenger services from Bristol starting on 26 May 1924, subsequently extended to Pilning in a loop back to Bristol via Patchway from 9 July 1928.[1] By 1924 a brick concourse had been built perpendicular to the bay platform, providing a ticket office, the station master's office, toilets and a ladies' waiting room. The station master and keeper of the level crossing were also provided with houses, while to the east of the platform were sidings, primarily for stabling of excursion trains.
In November 1964 through services to Pilning ceased,[2] with the line north closed completely in July 1968, although goods traffic at Severn Beach had already ended in 1963.[1]
More recently, services to Severn Beach have been cut back further, with only one in three trains to Avonmouth now continuing on to Severn Beach. The concourse and other station buildings have been demolished, replaced with a small metal and glass shelter, while the eastern rails have been pulled up, leaving just the bay platform remaining. Half of the 240 yards (220 m) is cordoned off, and that which remains dwarfs the two-car diesel multiple units which use it. To the east, the land once used for sidings has become overgrown and a dumping ground for litter and general detritus.
Service
Services at Severn Beach are all terminating services from Bristol Temple Meads, operated by Great Western Railway using mainly Class 150 Sprinter units. Monday to Friday, three trains every two hours run from Temple Meads to Avonmouth, with one extended to St Andrew's Road and Severn Beach, giving a service roughly every two hours, the first arriving around 6am and the last departing Severn Beach about 11pm. On Saturdays more trains continue, with either a replacement bus service or train each hour, with more trains in the evening.
Sunday sees an hourly service in the summer months (May to mid-September), but just two departures in the winter (most services terminating at Avonmouth)[3]
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Terminus | Great Western Railway Severn Beach Line |
St Andrews Road | ||
Disused railways | ||||
New Passage Halt | Great Western Railway Severn Beach Line |
St Andrews Road |
Future
Great Western Railway declined a contractual option to continue the Greater Western passenger franchise (of which services at Severn Beach are a part) beyond 2013, citing a desire for a longer-term contract due to the impending upgrade to the Great Western Main Line.[4] The franchise was put out to tender,[5][6][7] but the process was halted and later scrapped due to the fallout from the collapse of the InterCity West Coast franchise competition.[8] A two-year franchise extension until September 2015 was agreed in October 2013,[9][10] and subsequently extended until March 2019.[11][12][13]
With the coming upgrade to the Great Western Main Line, the main line from London to Bristol is due to be electrified by 2016.[14] However, the electrification will not extend beyond the main lines, so Severn Beach will continue to be served by diesel trains.[15] Stephen Williams, MP for Bristol West, questioned whether electrification could continue to Clifton Down. Then-Secretary of State for Transport Philip Hammond replied that it would have to be looked at in the future.[16] The group Friends of Suburban Bristol Railways supports the electrification of the entire Severn Beach Line.[17]
Improved services at Severn Beach are called for as part of the Greater Bristol Metro scheme, a rail transport plan which aims to enhance transport capacity in the Bristol area.[18][19] There is an aspiration for half-hourly services, however due to the large sections of the Severn Beach Line which are single-track and to the congested main line from Temple Meads, such frequency is not currently feasible.[20][21] The scheme was given the go-ahead in July 2012 as part of the City Deal, whereby local councils would be given greater control over money by the government.[22]
References
Wikimedia Commons has media related to Severn Beach railway station. |
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 History of the Severn Beach Line
- ↑ GB National Rail Timetable 2013, Table 133 - 20 May to 6 December 2013Network Rail; retrieved 2013-09-27
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- Articles with OS grid coordinates
- DfT Category F1 stations
- Pages with broken file links
- Commons category link is defined as the pagename
- Railway stations in Bristol, Bath and South Gloucestershire
- Former Great Western Railway stations
- Railway stations opened in 1922
- Railway stations served by Great Western Railway
- Severn Beach Line