Twyford railway station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

Twyford National Rail
2013 at Twyford station - view from the east (FGW 165109).JPG
The station looking west, showing platforms 1 to 4 from left to right. Platform 5 is hidden behind the station buildings on right.
Location
Place Twyford
Local authority Borough of Wokingham
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Grid reference SU790757
Operations
Station code TWY
Managed by Great Western Railway
Number of platforms 5
DfT category D
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2002/03 Decrease 1.054 million
2004/05 Increase 1.083 million
2005/06 Increase 1.127 million
2006/07 Increase 1.209 million
2007/08 Increase 1.222 million
2008/09 Increase 1.249 million
2009/10 Decrease 1.206 million
2010/11 Increase 1.233 million
2011/12 Increase 1.299 million
2012/13 Increase 1.347 million
2013/14 Increase 1.362 million
History
Key dates Opened 1 July 1839 (1 July 1839)
Original company Great Western Railway
Pre-grouping GWR
Post-grouping GWR
National RailUK railway stations

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Twyford from Office of Rail and Road statistics. Methodology may vary year on year.
UK Railways portal

Twyford railway station is a railway station in the village of Twyford in Berkshire, England.

It is served by local services operated by Great Western Railway from London Paddington, 31 mi (50 km) east, to Reading. Twyford is also the junction for the Henley-on-Thames branch.

Description

The station is on the Great Western Main Line, the original line of the Great Western Railway (GWR), which opened as far as Twyford in 1839 and was extended to Reading in 1840. It has 5 platforms. Platform 1 and 2 are on the "fast" Reading – London lines, with Platform 1 being the "down" line (from London). Platforms 3 and 4 are the "relief line" platforms, with platform 3 being the "down" line. Platform 5 is a west-facing bay platform with access only to the Henley Branch Line. Platform 4 also allows access to the Henley Branch via two crossovers: one just east of Platform 4 and one just west of it between it and Platform 5. Throughout the day trains mainly call at platforms 3, 4 and 5. However, during peak times fast services to and from London Paddington use platforms 1 and 2. The platform are of differing lengths. Platform 1 is long enough to accommodate an eight coach train; platforms 2 and 4 can each hold a nine coach train; platform 3 is long enough for twelve coaches; whilst platform 5 can hold just five.[1]

At Twyford, the running speed is 125 mph on the fast lines, and 60 mph (90 mph for the Class 165s and Class 166s) on the relief lines. The up relief line is also signalled for wrong direction running at a speed of 40 mph, or 10 mph for the crossover onto the Henley branch.

The main entrance to the station, and main station building, are on platform 4 and serve the village centre. There is a second entrance on platform 1. There is a large car park between the main line and Henley branch and it is often full with morning commuters' cars.

Services

A London to Oxford service calls

Monday to Saturdays there are four trains per hour to London Paddington eastbound and two Reading westbound and two to Oxford. On Sundays there is a half-hourly service in each direction. Trains to Henley-on-Thames run at about 50 minute intervals Mondays to Fridays and hourly at weekends.

Typical train times are 50 minutes to London (Paddington), 7 minutes to Reading and 12 minutes to Henley. In the peak periods there are a few through trains to and from London taking between 20 and 30 minutes.

Services are summarised as follows:

Preceding station National Rail National Rail Following station
Maidenhead   Great Western Railway
Great Western Main Line
  Reading
London Paddington   Great Western Railway
Paddington-Bedwyn/Westbury/Exeter St Davids/Taunton/Frome/Penzance (fast)
  Reading
Terminus or Maidenhead or Slough or London Paddington   Great Western Railway
Henley Branch Line
  Wargrave
  Future Development  
Preceding station   Elizabeth line roundel.svg National Rail logo.svg Crossrail   Following station
Terminus
Crossrail
Elizabeth Line
towards Abbey Wood or Shenfield

History

The 1892 buildings seen from the east end

The first Twyford station opened on 1 July 1839 and was the terminus of the GWR until 30 March 1840, pending the completion of Sonning Cutting. It was a timber building to the north of the line at right angles to the track. The actual platform was on a loop off the running line and served trains running in either direction, of which there were nine per week day. Just to the west was a temporary engine shed, moved here from Maidenhead, the first terminus. After the opening to Reading the shed was removed and a platform was provided on the south side offset to the west. The line was crossed by a footpath between the platform ends.

In 1846 the buildings were replaced in brick and stone to a standard design with an all-round canopy. This was similar to a building which survives at Culham. The platforms were altered to serve the running lines directly. The construction of the Henley Branch Line in 1857 led to the extension of the up platform in a curve to match the new branch and the creation of a north face for branch trains. The repositioning of the goods shed was also necessary, as the new line cut through the old goods yard. As the extended platform blocked the footpath across the main line a footbridge was provided.

The demise of broad gauge in 1892 gave the Great Western the opportunity to quadruple the main line as far as Didcot. At Twyford the new lines meant building a second arch onto the Waltham Road bridge and moving Hurst Road further south. The station was completely reconstructed into the form largely visible today, with new platforms (1 and 2) to serve the fast lines and a new footbridge. A cattle dock and coal yard were built opposite the Henley bay (platform 5) and a weighbridge provided which can still be seen. The goods yard was extended and a new goods shed built. The new track layout was much more complex and required the construction of two signal boxes, East and West, to replace the original one which stood on the up platform by the footbridge steps.

The Station Master's house was built in 1900, after which there were no significant changes until the 1960s. The GWR was nationalised on 1 January 1948, becoming part of the Western Region of British Railways, but apart from new signs this had little effect at Twyford until the 1960s. In 1961 the trackwork was simplified and the two signal boxes were decommissioned and replaced by a single one in the vee between the up relief and branch lines. This lasted only until 1972, when all signalling control was transferred to Reading. The goods yard and cattle dock closed in 1965 and were cleared to provide the present car parks. In 1975 the road bridge was reconstructed and platforms 1 and 2 altered to reduce the curve through the station and make the main lines suitable for 125 miles per hour (201 km/h) High Speed Trains.

In 1989 the main buildings on platform 4 were gutted and rebuilt internally to provide a new booking office and waiting room. The building lost its chimneys in the process, but the chimneys on the island platform building remain. The GWR "pagoda" cycle shed was removed from platform 4 at this time and moved to the garden of the former Station Master's house, where it can still be seen.

In 2005 Norman Topson, the station master for 16 years and local rail worker for 43 years, was awarded an MBE for services to the railway industry and community.[2]

In the summer of 2009 the station footbridge was replaced with a new one incorporating three lifts. The new bridge is on the site of the old one, but with only one staircase to platforms 4 and 5 and built a few feet higher to accommodate future electrification.

Media

Twyford Railway station has been used as a television film location in Midsomer Murders and in the BBC comedy series Mutual Friends where it is the scene of a suicide.[citation needed]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.