Manila Metro Rail Transit System

From Infogalactic: the planetary knowledge core
(Redirected from MRT-3)
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

 MRT3  MRT Line 3
MRT-3 Train North Avenue 3.jpg
North Avenue Station platform area and train Tatra RT8D5
Overview
Type Rapid transit/Light metro
System Manila Metro Rail Transit System
Locale Manila, Philippines
Stations 13[2]
Services 1[1]
Website MRTC, DOTC-MRT3
Operation
Opened December 15, 1999
Owner Metro Rail Transit Corporation
Operator(s) Department of Transportation
and Communications
Rolling stock ČKD Tatra RT8D5 1st Generation LRV[3]
CNR Dalian 2nd Generation LRV
(train length: 3 cars[3])
Technical
Track length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius Lua error in Module:Convert at line 272: attempt to index local 'cat' (a nil value). Mainline /
Lua error in Module:Convert at line 272: attempt to index local 'cat' (a nil value). Depot
Operating speed Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Route map
future
interchange
North Avenue  LRT1 
Depot
Quezon Avenue
GMA-Kamuning
Araneta Center–Cubao  LRT2 
Santolan-Annapolis
Ortigas
Shaw Boulevard
Boni
Pasig River
Guadalupe
Buendia
Ayala
Magallanes  PNR 
South Luzon Expressway
Taft Avenue  LRT1 

The Manila Metro Rail Transit System, also known as the MRT Line 3, MRT-3, or Metrostar Express, is a rapid transit system of Metro Manila, Philippines and is composed of a single line that runs in the general direction along the north and south lanes of Epifanio de los Santos Avenue (EDSA). Although it has the characteristics of light rail, such as the type of rolling stock used, it is more akin to a rapid transit system owing to its total grade separation and high passenger throughput. Envisioned in the 1970s as part of the Metropolitan Manila Strategic Mass Rail Transit Development Plan, the thirteen-station, 16.9-kilometer (10.5 mi) line was the second rapid transit line to be built in Metro Manila when it started full operations in 2000 under a 25-year concession agreement between the private owners and the DOTC. It is owned by the Metro Rail Transit Corporation (MRTC), a private company operating in partnership with the Department of Transportation and Communications (DOTC) under a Build-Lease-Transfer agreement. Serving close to 550,000 passengers on a daily basis when MRTC's maintenance provider, Sumitomo Corp of Japan, was handling the maintenance of the system, MRT-3 is the busiest among Metro Manila's three rapid transit lines, built with essential standards such as barrier-free access and the use of magnetic card tickets to better facilitate passenger access. Total ridership significantly exceeds its built maximum capacity of 350,000 passengers a day, with various solutions being proposed or implemented to alleviate chronic congestion in addition to the procurement of new rolling stock. The private owners had been offering various capacity expansion proposals to DOTC the past 10 years, but DOTC never acted on these proposals. In 2012, the DOTC unilaterally took over the train maintenance in Oct 2012 and removed Sumitomo Corp., putting instead unqualified maintenance providers which had led to a rapid deterioration of the MRT3 system. Experts from MTR HK were commissioned to review the system in 2014 after DOTC was handling the maintenance for 2 years amid questions on the line's current structural integrity owing to poor maintenance since 2012, despite DOTC pronouncements that the system in general is safe. MTR HK made the opinion that the rail system was compromised due to poor maintenance.

MRT-3 is integrated with the public transit system in Metro Manila, and passengers also take various forms of road-based public transport, such as buses, to and from a station to reach their intended destination. Although the line aimed to reduce traffic congestion and travel times along EDSA, the transportation system has only been partially successful due to inaction on the private sector's proposals to expand the capacity of the system to take up to 1.1 million passengers a day. Expanding the network's capacity to accommodate the rising number of passengers is set on tackling this problem.

The MRT-3 line

System map of the Manila LRT and MRT (current as of July 2015)
An MRT-3 train Tatra RT8D5M approaching Ayala Station.

The line serves 13 stations on 16.9 kilometers (10.5 mi) of line,[2][1] spaced on average around 1,300 metres (4,300 ft) apart.[4] The rails are mostly elevated and erected either over or along the roads covered, with sections below ground before and after Buendia and Ayala stations, the only underground stations on the line. The southern terminus of the line is the Taft Avenue station at the intersection between Epifanio de los Santos Avenue and Taft Avenue, while the northern terminus is the North Avenue station along Epifanio de los Santos Avenue in Barangay Bagong Pag-asa, Quezon City. The rail line serves the cities that Circumferential Road 4 (Epifanio de los Santos Avenue) passes through: Pasay, Makati, Mandaluyong, San Juan and Quezon City.

Three stations currently serve as interchanges between the lines operated by the MRTC, LRTA and PNR. Magallanes Station is nearby to EDSA Station on the PNR, Araneta Center-Cubao is connected by a covered walkway to its namesake station of the LRT-2; and Taft Avenue Station is connected via covered walkway to the EDSA Station of the LRT-1.

The MRT-3 is open from 5:30 a.m. PST (UTC+8) until 11:00 p.m on weekdays, and 5:30 a.m. PST (UTC+8) until 10:00 pm during weekends and holidays. It operates almost every day of the year unless otherwise announced. Special schedules are announced via the PA system in every station and also in newspapers and other mass media. During Holy Week, a public holiday in the Philippines, the rail system is closed for annual maintenance, owing to fewer commuters and traffic around the metro. Normal operation resumes after Easter Sunday.[5]

The MRT-3 has experimented with extended opening hours in the last few years, the first of which included 24-hour operations beginning on June 1, 2009 (primarily aimed at serving call center agents and other workers in the business process outsourcing sector).[6] Citing low ridership figures and financial losses, this was suspended after two days, and operations were instead extended from 5:00 a.m. to 1:00 a.m.[7] MRT-3 operations subsequently returned to the former schedule by April 2010, but services were again extended starting March 10, 2014, with trains running on a trial basis from 4:30 am to 11:30 pm in anticipation of major traffic buildup in light of several major road projects beginning in 2014.[8]

History

A northbound MRT-3 train leaving Shaw Boulevard Station
Taft Avenue Station platform area

During the construction of the first line of the Manila Light Rail Transit System in the early 1980s, Electrowatt Engineering Services of Zürich designed a comprehensive plan for metro service in Metro Manila. The plan—still used as the basis for planning new metro lines—consisted of a 150-kilometer (93 mi) network of rapid transit lines spanning all major corridors within 20 years,[9] including a line on Epifanio de los Santos Avenue, the region's busiest road corridor.

The MRT-3 (originally LRT-3) project officially began in 1989, five years after the opening of the LRT Line 1, with the Hong Kong-based EDSA LRT Corporation winning the public bidding for the line's construction during the term of President Corazon Aquino.[4] However, construction could not commence, with the project stalled as the Philippine government conducted several investigations into alleged irregularities with the project's contract.[10] In 1995, the Supreme Court upheld the regularity of the project (G.R. No. 114222, April 6, 1995) which paved the way for construction to finally begin during the term of President Fidel V. Ramos. A consortium of local companies, led by Fil-Estate Management, Ayala Land, and 5 others, later formed the Metro Rail Transit Corporation (MRTC) in June 1995 and took over the EDSA LRT Corporation.[4]

The MRTC was subsequently awarded a Build-Lease-Transfer contract by the DOTC, which meant that the latter would possess ownership of the system after the 25-year concession period. Meanwhile the DOTC would assume all administrative functions, such as the regulation of fares and operations, leaving the MRTC responsibility over construction and maintenance of the system as well as the procurement of spare parts for trains. In exchange, the DOTC would pay the MRTC monthly fees for a certain number of years to reimburse any incurred costs.[11]

Construction began on the fifteenth of October 1996, with a BLT agreement signed between the Philippine government and the MRTC.[4] An amended turnkey agreement was later signed on September 16, 1997 with a consortium of companies (including Mitsubishi Heavy Industries and Sumitomo Corporation. A separate agreement was signed with CKD Dopravny Systemy (ČKD Tatra, now part of Siemens AG), the leading builder of trams and light rail vehicles for the Eastern Bloc, on rolling stock. MRTC also retained the services of ICF Kaiser Engineers and Constructors to provide program management and technical oversight of the services for the design, construction management and commissioning.[12]

During construction, the MRTC oversaw the design, construction, equipping, testing, and commissioning, while the DOTC oversaw technical supervision of the project activities covered by the BLT contract between the DOTC and MRTC. The DOTC also sought the services of Systra, a French consultant firm, with regards to the technical competence, experience and track record in the construction and operations.[12]

On December 15, 1999, the initial section from North Avenue to Buendia was inaugurated by President Joseph Estrada,[13] with all remaining stations opening on July 20, 2000, a little over a month past the original deadline.[14] However, ridership was initially far below expectations when the line was only partially open, with passengers complaining of the stations' steep price and the general lack of connectivity with other modes of public transportation.[15] Passengers complained of high ticket prices with the maximum fare of ₱34 at the time being significantly higher than a comparable journey on those lines operated by the LRTA and PNR or a similar bus ride along EDSA. Although the MRTC projected 300,000-400,000 passengers riding the system daily, in the first month of operation the system saw a ridership of only 40,000 passengers daily, although the ridership improved quickly when passengers experienced significantly faster & convenient travel along EDSA.[16] The system was even criticized as a white elephant alongside the Manila Light Rail Transit System and the Metro Manila Skyway.[17] To alleviate passenger complaints, the MRTC later reduced passenger fares to P15, as requested by then President Joseph Estrada.

By 2004, the MRT-3 had the highest ridership of the three lines, with 400,000 passengers daily. By early 2015, the system was carrying around 550,000 commuters during weekdays and was often badly overcrowded during peak times of access during the day.

On August 13, 2014 the train at the Taft Avenue Station became derailed and overshot to the streets. First, the train had stopped after Magallanes Station (before the Taft Avenue Station) because of a technical problem. Then the train broke down so a following train was used to push the stalled train. However, during this process, the first train became detached and overshot at Taft Avenue, breaking the concrete barriers and falling to the street below. At least 38 people were injured.[18] The accident was blamed on poor maintenance of the DOTC-appointed provider.

Station facilities, amenities, and services

Buendia Station, one of the MRT-3 stations with an island platform.
The entrance to Ayala station as seen from the Ayala Center
Bridge linking the MRT-3 Taft Avenue Station to the nearby LRT-1 EDSA Station

With the exception of Buendia Avenue and Ayala Avenue stations, and the platform level of Taft Avenue and Boni Avenue stations, all stations are situated above ground, taking advantage of EDSA's topology.[19]

Station layout and accessibility

MRT-3 stations have a standard layout, with a concourse level and a platform level. The concourse is usually above the platform, with stairs, escalators and elevators leading down to the platform level. Station concourses contain ticket booths, which is separated from the platform level by fare gates.[4] Some stations, such as Araneta Center-Cubao, are connected at concourse level to nearby buildings, such as shopping malls, for easier accessibility. Most stations are also barrier-free inside and outside the station, and trains have spaces for passengers using wheelchairs.[4]

Stations either have island platforms, such as Taft Avenue and Shaw Boulevard, or side platforms, such as Ortigas and North Avenue. Due to the very high patronage of the MRT3 system, part of the platform corresponding to the front car of the train is cordoned off for the use of women, children, elderly and disabled passengers.

MRT-3 stations are also designed to occupy the entire span of EDSA, allowing passengers to safely cross between one end of the road and the other.[4]

Shops and services

Inside the concourse of all stations are stalls or shops where people can buy food or drinks. Stalls vary by station, and some have fast food stalls. The number of stalls also varies by station, and stations tend to have a wide variety, especially in stations such as Ayala and Shaw Boulevard.

Stations such as Taft Avenue and North Avenue are connected to or are near shopping malls and/or other large shopping areas, where commuters are offered more shopping varieties.

Since November 19, 2001, in cooperation with the Philippine Daily Inquirer, passengers are offered copies of the Inquirer Libre, a free, tabloid-size, Tagalog version of the Inquirer, which is available at all MRT-3 stations.[20] In 2014, Pilipino Mirror also started distributing free tabloid newspapers.

Safety and security

The MRT-3 has always presented itself as a safe system to travel in, which was affirmed in a 2004 World Bank paper prepared by Halcrow describing the overall state of metro rail transit operations in Manila as being "good".[21] However, in recent years after the DOTC took over maintenance of the train system in 2012, the safety and reliability of the system has been put into question, with experts calling it "an accident waiting to happen", and while several incidents and accidents were reported between 2012 and 2014, that has not deterred commuters from continuing to patronize the system.[22] The Philippine government, meanwhile, continues to assert that the system is safe overall despite those incidents and accidents.[23]

With a current daily ridership of around 560,000 passengers, the MRT-3 operates significantly above its designed capacity of between 360,000 and 380,000 passengers per day.[24] Operating over capacity since 2004,[25] government officials have admitted that capacity and system upgrades are overdue,[26] although the DOTC never acted on the numerous capacity expansion proposals of the private owners. In the absence of major investment in improving system safety and reliability, DOTC management of the MRT-3 has resorted to experimenting with and/or implementing other solutions to reduce strain on the system, including crowd management on station platforms,[27] the proposed implementation of peak-hour express train service.[28] However, some of these solutions, such as platform crowd management, are unpopular with passengers.[29]

For safety and security reasons, persons who are visibly intoxicated, insane and/or under the influence of controlled substances, persons carrying flammable materials and/or explosives, persons carrying bulky objects or items over 1.5 metres (5 ft) tall and/or wide, and persons bringing pets and/or other animals are prohibited from entering the MRT-3.[30] Products in tin cans are also prohibited on board the MRT-3, citing the possibility of home-made bombs being concealed inside the cans.[31]

In 2000 and 2001, in response to the Rizal Day bombings and the September 11th attacks, security was stepped up on the MRT-3. The Philippine National Police has a special police force on the MRT-3,[32] and security police provided by private companies can be found in all MRT-3 stations. All MRT-3 stations have a head guard. Some stations may also have a deployed K9 bomb-sniffing dog. The MRT-3 also employs the use of closed-circuit television inside all stations to monitor suspicious activities and to assure safety and security aboard the line. Passengers are also advised to look out for thieves, who can take advantage of the crowding aboard MRT-3 trains. Wanted posters are posted at all MRT-3 stations to help commuters identify known thieves.

Fares and ticketing

File:Mrtpass.jpg
A sample MRT-3 stored value ticket bearing the face of then-President Joseph Estrada released in 2000.
The design of the single journey ticket with neutral design as of 2015.
The design of the P100 stored value ticket as of 2015.

The MRT-3, like the LRT-1 and LRT-2, uses a distance-based fare structure, with fares ranging from thirteen to twenty-eight pesos (29 to 63 U.S. cents), depending on the destination. Commuters who ride the MRT-3 are charged ₱13 for the first two stations, ₱16 for 3–4 stations, ₱20 for 5–7 stations, ₱24 for 8–10 stations and ₱28 for 11 stations or the entire line. Children below 1.02 metres (3 ft 4.4 in) (the height of a fare gate) may ride for free on the MRT-3.

Types of tickets

Magnetic tickets (1999-2015)

Two types of MRT-3 tickets exist: a single-journey (one-way) ticket whose cost is dependent on the destination, and a stored-value (multiple-use) ticket for 100 pesos. The 200-peso & 500-peso stored-value tickets were issued in the past, but have since been phased out. The single-journey ticket is valid only on the date of purchase. Meanwhile, the stored-value ticket is valid for three months from date of first use.[30]

MRT-3 tickets come in several incarnations: these include tickets bearing the portraits of former presidents Joseph Estrada and Gloria Macapagal-Arroyo,[33] which have since been phased out, and one bearing the logos of the DOTC and the MRTC. Ticket shortages are common: in 2005, the MRTC was forced to recycle tickets bearing Estrada's portrait to address critical ticket shortages, even resorting to borrowing stored-value tickets from the LRTA[34] and even cutting unusable tickets in half for use as manual passes. Shortages were also reported in 2012,[35] and the DOTC was working on procuring additional tickets in 2014.[36] Because of the ticket shortages, it had become common practice for regular passengers to purchase several stored-value tickets at a time, though ticket shortages still persist.[37]

Although the MRT-3 has partnered with private telecommunications companies in experimenting with RFID technology as an alternative ticketing system in the past,[38][39] these were phased out in 2009.[40]

Beep cards (2015-present)

Lua error in Module:Details at line 30: attempt to call field '_formatLink' (a nil value). Currently, inter-operable beep cards with similar-to-the-previous single-journey and stored-value ticket types are now issued, along with the deployment of brand-new ticketing machines that replaced the barely-used ticketing machines that has been in place since the line's inauguration. The beep, tap-and-go tickets, loadable up to ₱10,000 can be used in all three rail lines since December 2015.

Fare adjustment

Adjusting passenger fares was ordered by President Joseph Estrada as a means to boost flagging ridership figures,[41] and the issue of MRT-3 fares both historically and in the present day continues to be a contentious political issue involving officials at even the highest levels of government.

Current MRT-3 fare levels were set on January 4, 2015 as a consequence of DOTC having to increase fares for the LRT-1 as per their concession agreement with MPIC-Ayala, with fare hikes delayed for several years despite inflation and rising operating costs.[42] Prior to the current fares levels, MRT-3 fares were set on July 15, 2000 under the orders of then President Estrada; this was intended to have the MRT-3 become competitive against other modes of transport,[43] but had the effect of causing revenue shortfalls which the government shouldered. While originally set to last only until January 2001,[43] the new fare structure persisted due to strong public opposition against increasing fares,[44] especially as MRT-3 ridership increased significantly after lower fares were implemented.[41] These lower fares—which are only slightly more expensive than jeepney fares—ended up being financed through large government subsidies amounting to around ₱45 per passenger,[44][45] and which for both the MRT and LRT reached ₱75 billion for the 10-year period between 2004 and 2014.[46] Without subsidies, the cost of a single MRT-3 trip is estimated at around ₱60,[45] and a ₱10 increase in fares would yield additional monthly revenues of ₱2-3 billion a month.[47]

Passenger fare subsidies are unpopular outside Metro Manila, with subsidy opponents claiming that their taxes are being used to subsidize Metro Manila commuters without any benefit to the countryside, and that the fare subsidies should be used for infrastructure improvements in the rest of the country.[48] In the 2013 State of the Nation Address, President Benigno Aquino III claimed that it would be unfair for non-Metro Manila residents to use their taxes to subsidize the LRT and MRT.[49] However, supporters of the subsidies claim that the rest of the country benefits economically from efficient transportation in Metro Manila.[50]

Rolling stock

Inside an MRT-3 train in 2006.
Model Tatra RT8D5M (1st Generation)[51] CNR Dalian (2nd Generation)
Number Built 73 (69 cars in service) 48 cars ordered (4 cars delivered)
Country of Origin Czech- CKD Transportation Systems China - CNR Dalian
Length per Car 33,000 mm (31,720 mm w/couplers) ~33,000 mm (31,720 mm w/couplers)
Width 2500 mm ~2500 mm
Height (pantograph lowered) 3724 mm ~3724 mm
Door Height 1900 mm ~1900 mm
Door Width Middle-End 1255 mm-861 mm ~1255 mm-861 mm
Floor Height 925 mm Unknown
Minimum Turning Radius Mainline-Depot 20 m-20 m ~Max. 300 m Mainline - 25 m Depot
Empty Weight 46800 Kg Unknown
Body shell material Low alloy high tensile steel (aluminum for ceiling) Unknown
Electrification 750 V DC Overhead Line 750 V DC Overhead Line
Traction Power 8*64 KW IGBT Thyristor type with Regeneration (2 per Bogie) Unknown
Seating Capacity 74 Unknown
Standing Capacity @ 8 passengers per m^2 320 Unknown
Speed 65 Kph 65 Kph
Acceleration 1.03 m/s^2 at least 1.03 m/s^2
Deceleration Service Brake-Emergency Braking 1.01 m/s^2-1.58 m/s^2 at least 1.01 m/s^2-1.58 m/s^2
Max Gradient 5% at least 5%
Configuration 3 car (4 car Planned) 3 car / 4 car
Combined Passenger Capacity 1384 Passengers Unknown
Wheelbase 1900 mm ~1900 mm

The MRT-3 owns 73 light rail vehicles (LRV) made in the Czech Republic by ČKD (now part of Siemens AG) in a three-car configuration, majority of which are now broken due to poor maintenance since 2012 by DOTC.[3] The LRV's were purchased with export financing from the Czech government.[52] Trains have a capacity of 1,182 passengers,[3] which is smaller than the normal capacity of LRT Line 1 first generation rolling stock, although MRT-3 trains came with air conditioning. Despite this, the MRT-3 is designed to carry in excess of 23,000 passengers per hour per direction (PPHPD), and is expandable to accommodate 48,000 passengers per hour per direction.[1] However, due to DOTC's poor maintenance, the line currently operates with 4–15 minute headways,[53] and the system's passenger volume is presently closer to 14,000–18,000 passengers per hour per direction.

Depot

The MRT-3 maintains an underground depot in Quezon City, near North Avenue station. On top of the depot is TriNoma, a shopping mall owned by the Ayala Corporation. The depot occupies 84,444 square meters (908,948 sq ft) of space and serves as the headquarters for light and heavy maintenance of the MRT-3, as well as the operations of the system in general. It is connected to the main MRT-3 network by a spur line. The depot is capable of storing 81 light rail vehicles, with the option to expand to include 40 more vehicles as demand arises. They are parked on nine sets of tracks, which converge onto the spur route and later on to the main network. However, a lot of rail tracks for storage inside the depot were taken by DOTC to repair broken rails, as DOTC's appointed maintenance provider did not purchase spare rails.

Plans

Capacity Expansion Project

Due to the high ridership of the line, a proposal under study by the DOTC and NEDA proposed to double the current capacity by acquiring additional light rail vehicles to accommodate the 520,000 passenger a day requirement.[54]

In line with this need, the DOTC secured the procurement of a total of 48 LRVs (Light Rail Vehicles) or 16 trains from Chinese firm Dalian Locomotive. Delivery had already commenced last January 2016 and will continue until January of the following year. The introduction of the new LRVs will allow the MRT to now handle over 800,000 passengers.[55]

The first train was scheduled to be in revenue service before April 2016[56][57] but delays in its 5,000 km run test had delayed its deployment for Revenue service.[58][59]

Automatic Fare Collection System

Automatic Fare Collection System involves the decommissioning of the old-magnetic-based ticketing system and replacing it with contactless-based smart card technology on LRT Line 1, LRT Line 2 and MRT Line 3, with the introduction of a centralized back office that will perform apportionment of revenues. The private sector will operate and maintain the fare collection system. MRTC approved the use of smart card systems, and on January 31, 2014, DOTC awarded the right to build and operate the smart-card system to AF Consortium.[60] The group comprises Ayala Corporation’s BPI and Globe Telecom, Metro Pacific's Smart Communications and Meralco FinServe, MSI Global, which developed automated fare collection systems’ software in Singapore and Bangkok, and SMRT, which operates Singapore’s mass transit system.[61] It posted a negative bid of ₱1,088,103,900.00, which edged out the SM Group’s bid of ₱1,088,000,000.00. Under the terms of the AF Consortium bid, there will be an upfront payment of ₱279 million and the balance of ₱800 million will then be paid in transaction fees when ridership volume reaches 750 million transactions per quarter. 72% of the total amount will only be paid to the government in 2024 or 2025, and only if the conditional volume is met.[62] MRT Line 3 started using the new ticketing system on October 3, 2015.[63]

North Extension

Although Phase 1 of the MRT-3 (Taft Ave. to North Ave.) has already been built, the route envisioned by the DOTC and the government in general was for the MRT-3 to traverse the entire length of EDSA (from Monumento to Taft Avenue), eventually connecting to Line 1 at Monumento in Caloocan (MRT-3 Phase 2) to create a seamless rail loop around Metro Manila. The expansion has been shelved by then President Gloria Arroyo in favor of the LRT-1's extension from Monumento to a new common station that it will share with the MRT-3 at North Avenue, thus closing the loop. However, this move of President Arroyo to take away Phase 2 of the MRT-3 had proven to be ill-advised as the ridership is very low at only about 30,000 passenger a day. It is also planned that the southern terminus of the proposed MRT-7 (originally LRT-4 along Quezon Blvd., but had since changed route several times), which will link Quezon City, Caloocan (north), and San Jose del Monte City, Bulacan will be sharing the same station.

The National Economic and Development Authority as well as then President Arroyo herself have said that the MRT3-LRT1 link at North Avenue is a national priority, since it would not only provide seamless service between the LRT-1 and the MRT-3, but would also help decongest Metro Manila.[64] It is estimated that by 2010, when the extension is completed, some 684,000 commuters would use the MRT-3 everyday from the present 400,000, and traffic congestion on EDSA would be cut by as much as fifty percent.[65] However, this LRT-1 extension was shown as as a poor decision as the LRT-1 extension carries a negligible load and traffic in Metro Manila has gotten worse.

On November 21, 2013, the NEDA board, chaired by President Benigno Aquino III, approved the construction of a common station within North Avenue between SM North EDSA and TriNoma Mall. It is estimated to cost 1.4 billion pesos. It will feature head-to-head platforms for LRT-1 and MRT-3 trains with a 147.4-meter elevated walkalator to MRT-7.[66] SM Investments Corporation posted 200 million pesos for the naming rights of the common station.[67] This is inconsistent with the original plan of having seamless connectivity to Monumento and is also an unusual arrangement of having two train stations beside each other.

Proposals to fully unite MRT-3 and LRT-1 operations, trains and systems have been pitched but has not been pursued so far. Feasibility tests for this proposition included LRT-1 trains visiting MRT-3 depot facilities in North EDSA. It has since been shelved for undisclosed reasons.

Transfer of operations from MRTC to LRTA

Recently, a new study for the Metro Manila Rail Network has been unveiled by DOTC Undersecretary for Public Information Dante Velasco that LRT 1, LRT 2, and MRT 3 will be under one management, the Light Rail Transit Authority. This is due to maintenance cost issues for Line 1's maintenance cost, which is approximately ₱35 million, along with Line 2's ₱25 million and Line 3's ₱54 million maintenance costs. Another reason for this study is for the unification of the LRT 1 and the MRT 3 lines. According to DOTC Undersecretary for Rails Glicerio Sicat, the transfer was set by the government in June 2011.[68] However, it is unlikely that the private owners, MRTC, will approve this plan.

On January 13, 2011, Light Rail Transit Authority Chief Rafael S. Rodriguez took over as officer-in-charge of MRT-3 in preparation for the integration of operations of the Yellow, Purple, and Blue Lines.[69] But with the entry of a new leadership into the MRTC that year and in 2012, the transfer was deemed not likely to happen; however, on April 2012, a LRT-1 trainset made the first trial journey to the MRT-3 depot.

On May 26, 2014, MRT's general manager Al Vitangcol was sacked by Transportation and Communication Secretary Joseph Emilio Abaya, and was replaced by LRTA Administrator Honorito Chaneco as officer-in-charge. The move came after Vitangcol was accused by the ambassador of the Czech Republic of extortion and for awarding an anomalous deal, the maintenance contract, to an uncle-in-law.[70] However, DOTC continues to use unqualified maintenance providers and has not resorted to engaging world class companies for this important facility.

Controversy

By 2014 the MRT-3 was seen to have significantly deteriorated due to the DOTC's removal of tested maintenance provider Sumitomo Corp in 2012 and persistence in using unqualified maintenance providers. The government of Benigno Aquino III had been planning to buy the MRT-3 from the MRT Corporation (MRTC), which built the MRT-3, and then bid it out to private bidders. The Aquino government accused the MRTC of neglecting and not improving the services of the MRT-3 under its watch,[71] but records have shown that there were no incidents prior to 2012 when MRTC was handling the maintenance.

However, in February 2016 the Philippine Senate released a report saying that DOTC Secretary Jun Abaya and other DOTC officials "may have violated" the Anti-Graft and Corrupt Practices Act in relation to questionable contracts with MRT-3's maintenance provider.[72] In a Senate report where the MRT's condition was found to be in "poor maintenance" as per studies made by MTR HK,[73] DOTC officials were reported to be involved in graft in relation to questionable contracts, especially those for the maintenance of the MRT-3.[74] The government has not done anything to address the poor performance of DOTC since 2011.

See also

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 3.2 3.3 Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Background, Metro Rail Transit Corporation History, retrieved July 7, 2006 Archived June 26, 2006 at the Wayback Machine
  12. 12.0 12.1 Construction, Metro Rail Transit Corporation History, retrieved July 7, 2006 Archived June 26, 2006 at the Wayback Machine
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found. (Prepared by Halcrow Group Limited).
  22. Lua error in package.lua at line 80: module 'strict' not found.
    • Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. Lua error in package.lua at line 80: module 'strict' not found.
  27. Lua error in package.lua at line 80: module 'strict' not found.
  28. Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. 30.0 30.1 Lua error in package.lua at line 80: module 'strict' not found.
  31. Lua error in package.lua at line 80: module 'strict' not found.
  32. Lua error in package.lua at line 80: module 'strict' not found.
  33. Lua error in package.lua at line 80: module 'strict' not found.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. Lua error in package.lua at line 80: module 'strict' not found.
  36. Lua error in package.lua at line 80: module 'strict' not found.
  37. Lua error in package.lua at line 80: module 'strict' not found.
  38. Lua error in package.lua at line 80: module 'strict' not found.
  39. Lua error in package.lua at line 80: module 'strict' not found.
  40. Lua error in package.lua at line 80: module 'strict' not found.
  41. 41.0 41.1 Lua error in package.lua at line 80: module 'strict' not found.
  42. Lua error in package.lua at line 80: module 'strict' not found.
  43. 43.0 43.1 Lua error in package.lua at line 80: module 'strict' not found.
  44. 44.0 44.1 Lua error in package.lua at line 80: module 'strict' not found.
  45. 45.0 45.1 Lua error in package.lua at line 80: module 'strict' not found.
  46. Lua error in package.lua at line 80: module 'strict' not found.
  47. Lua error in package.lua at line 80: module 'strict' not found.
  48. Lua error in package.lua at line 80: module 'strict' not found.
  49. Lua error in package.lua at line 80: module 'strict' not found.
  50. Lua error in package.lua at line 80: module 'strict' not found.
  51. http://www.dotc.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2_AncillarrySystem/1_FINAL_BidDocsTORDrawingBOQ-021116.pdf
  52. Lua error in package.lua at line 80: module 'strict' not found.
  53. Lua error in package.lua at line 80: module 'strict' not found.
  54. Lua error in package.lua at line 80: module 'strict' not found.
  55. Lua error in package.lua at line 80: module 'strict' not found.
  56. Lua error in package.lua at line 80: module 'strict' not found.
  57. Lua error in package.lua at line 80: module 'strict' not found.
  58. Lua error in package.lua at line 80: module 'strict' not found.
  59. Lua error in package.lua at line 80: module 'strict' not found.
  60. Lua error in package.lua at line 80: module 'strict' not found.
  61. Lua error in package.lua at line 80: module 'strict' not found.
  62. Lua error in package.lua at line 80: module 'strict' not found.
  63. Lua error in package.lua at line 80: module 'strict' not found.
  64. Lua error in package.lua at line 80: module 'strict' not found.
  65. Lua error in package.lua at line 80: module 'strict' not found.
  66. Lua error in package.lua at line 80: module 'strict' not found.
  67. Lua error in package.lua at line 80: module 'strict' not found.
  68. Lua error in package.lua at line 80: module 'strict' not found.
  69. Lua error in package.lua at line 80: module 'strict' not found.
  70. Lua error in package.lua at line 80: module 'strict' not found.
  71. Lua error in package.lua at line 80: module 'strict' not found.
  72. Lua error in package.lua at line 80: module 'strict' not found.
  73. Lua error in package.lua at line 80: module 'strict' not found.
  74. Lua error in package.lua at line 80: module 'strict' not found.

External links