Solar power in Minnesota

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
University of Minnesota solar car

Solar power in Minnesota has been increasing, as the cost of photovoltaics has decreased. In 1983 Minnesota adopted a net metering rule which allows customers generating up to 40 kW to use net metering, with the kilowatt hour surplus rolled over each month, or optionally credited at the retail rate.[1]

In May 2013, the Minnesota legislature adopted a mandate on investor-owned utilities in the state that requires them to produce 1.5% of their electricity from solar power by 2020 with the bill also raising the state's cap on net metering from 40 kW to 1 MW. This mandate is in addition to the state's renewable portfolio standard of 25% by 2025 and it's estimated that affected utilities will have to add 450 MW of solar by 2020 to comply with the 1.5% requirement.[2]

While Minnesota is currently developing several utility level projects, currently, Minnesota's largest solar array is a 2MW solar array in Slayton followed by a 1 MW array at an IKEA in Bloomington.[3] There is also a 600 kW array on the roof of the Minneapolis Convention Center,.[4] In January 2015, Ecolab announced it would be going 100% solar powered by purchasing power from community solar gardens to be built by SunEdison.[5] Ecolab's share of the power would be 16MW, more than the amount of solar power in the state at the time of the announcement. If completely subscribed the solar gardens could provide up to 200MW. The Aurora Solar Project is a similar distributed network of arrays planned to reach 100MW utilizing midsized 2MW-10MW installations throughout the southern half of the state.[6][7] The largest single site solar project currently planned is the 100MW North Star Solar Project in Chisago County, Minnesota.[8] A similar 62MW Marshall Solar Energy Project is proposed to be built on 500 acres near Marshall, Minnesota.[9] Minnesota is able to generate 38.5% of its electricity from rooftop solar, from 23,100 MW of solar panels. St. Paul can generate 27% of its electricity, using 800 MW, and Minneapolis 26% from 1,000 MW.[10]

A 2016 estimate suggests that a typical 5 kW system will pay for itself in about 10 years. With incentives, a $20,000 system can be installed for a net profit after the first year of $5,331, and will generate a profit of $11,833 over its 25-year life, using a loan. Purchasing it outright returns a 9.2% return on investment, saving $20,301 over 25 years, and increases the home value by $15,210.[11]

Statistics

Source: NREL[12]
Minnesota Grid-Connected PV Capacity (MW)[13][14][15][16][17][18][19][20]
Year Capacity Installed % Change
2007 0.5 0.3 150%
2008 1.0 0.3 100%
2009 1.9 0.9 90%
2010 3.6 1.7 89%
2011 4.8 1.2 33%
2012 11.3 6.5 135%
2013 15.8 3.8 32%
2014 20 4.2 27%
2015 33 13 65%

See also

References

  1. Minnesota - Net Metering
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Notable Solar Installations in Minnesota
  4. Minneapolis Convention Center Solar Panel Project Finished Ahead of Schedule
  5. Ecolab to go all-solar in Minnesota, DAVID SHAFFER, Star Tribune, January 13, 2015
  6. Regulators approve Aurora Solar Project
  7. Aurora Solar Project details
  8. Chisago County solar farm will be among largest in U.S
  9. Planned solar farm in southwest MN draws fire from residents, Mark Steil, Duluth News Tribune, January 21, 2015
  10. Rooftop Solar Photovoltaic Technical Potential in the United States: A Detailed Assessment
  11. Minnesota
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Minnesota Solar

External links