This is a list of Power Stations in Pakistan. Pakistan had a total installed power generation capacity of almost 23 GW in 2013. However, dependable or de-rated capacity is in the range of 16 to 18 GW during the year, due to variety of factors, whereas demand for electricity is increasing at an average annual rate of eight per cent. And according to World Energy Statistics 2011, published by IEA, Pakistan’s per capita electricity consumption is one-sixth of the World Average. World average per capita electricity consumption is 2730 kWh compared to Pakistan’s per capita electricity consumption of 451 kWh. International Energy Agency has forecast that total electricity demand of the country will be 49,078 MW in 2025.[1]

Pakistan has an installed electricity generation capacity of 22,797 MW in 2013. The average demand is 17,000 MW and the shortfall is between 4,000 and 5,000 MW. Oil (35.2 per cent), hydel (29.9 per cent), gas (29 per cent), and nuclear, solar and imported (6 per cent) are the principal sources. In the next 10 years, peak electricity demand is expected to rise by four to five per cent, which is roughly 1,500 MW. This dismal forecast is due to a lopsided energy mix, diminishing indigenous fuel reserves, increasing circular debt and transmission hold-ups. Pakistan has almost exhausted its gas reserves. Imported oil’s price hikes affect the budget and its constant supply cannot be guaranteed. Pakistan has the potential to meet these energy challenges through hydel power but there are political and environmental issues in building dams. Rationality demands reducing reliance on oil and going for alternatives. The development of alternatives does not happen overnight. Pakistan will have to rely on imported fuels for the interim period at a huge cost. LNG is difficult to import, using coal has environmental issues, using shale gas also has environmental issues attached with it, and wind power has transmission network challenges.[2]With total estimated coal reserves of over 186bn tonnes, Pakistan ranks sixth among coal-rich countries. Yet, coal’s potential has not been exploited adequately. [3]

Thermal power station

In service

Station Location Coordinates Capacity (MW) Notes Refs
Kot Addu Power Company Limited Kot Addu, Muzaffar Garh, Punjab Lua error in package.lua at line 80: module 'strict' not found. 1,600 Multi fuel-fired thermal station [4][5][6][7]
Hubco Narowal Power Plant (HNPP) Narowal, Punjab 32.059067, 74.781222, 225 Furnace Oil Fired Plant [8]
Bin Qasim Power Plant I Karachi, Sindh 24.785546, 67.358929 1,260 Oil- and Natural Gas-fired thermal station [5]
Bin Qasim Power Plant II Karachi, Sindh 24.781873, 67.359767 560 Natural Gas-fired Combined Cycle Power Plant (CCPP) [5]
Jamshoro Power Station Jamshoro District, Sindh Lua error in package.lua at line 80: module 'strict' not found. 850 Oil- and Natural Gas-fired thermal stations [5][9]
Lalpir Power Limited Mehmood Kot, Muzaffargarh, Punjab 30.172472, 70.992945 362 Oil-fired thermal
Altern Energy Limited Fateh Jang, Punjab 29 Gas-fired Diesel Engine
Atlas Power Limited Sheikhupura, Punjab 225 Furnace Oil Fired Plant
Attock Gen Limited Rawalpindi, Punjab 165 Furnace Oil Fired Plant
Fauji Kabirwala Power Company Kabirwala, Punjab 30.524865, 71.954946 157 Combined cycled, Gas fired plant [5]
Gul Ahmad Energy Limited Karachi, Sindh 136 Furnace Oil, Gul Ahmed Wind Energy Proposed.
Nishat Power Limited Lahore, Punjab 31.122560, 73.905405 200 Furnace Oil Fired Plant
Nishat Chunian Limited Lahore, Punjab 200 Furnace Oil Fired Plant
Sapphire Electric Company Limited Muridke, Sheikhupura District, Punjab 234 Natural Gas-fired Combined Cycle Power Plant (CCPP)
Saba Power Company Limited Farooqabad, Sheikhupura, Punjab 31.733013, 73.873654 125 Furnace Oil Fired Unit [5]
Southern Electric Power Company Limited Raiwind, Lahore 31.291388, 74.249188 136 Furnace Oil Fired Thermal Plant
Tapal Energy Limited Karachi, Sindh 24.999713, 66.906860 126 Furnace Oil Fired Thermal Plant
Japan Power Generation (Pvt) Limited Raiwind, Punjab 31.325566, 74.262225 135 Furnace Oil Fired Plant
Kohinoor Energy Limited Lahore, Punjab 31.263200, 74.187321 131 Furnace Oil Fired Plant
Sitara Energy Limited Jaranwala, Faisalabad, Punjab 31.533111, 73.393330 85 Diesel and Natural Gas Fired Plant
Saif Power Limited Sahiwal, Punjab 30.696164, 73.260541 225 Diesel and Natural Gas Fired Plant

Under construction or proposed

Station Location Capacity (MW) Status


Thar Power Plant Tharparkar, Islamkot, Sindh 100 under construction, currently 1 MW is being produced by underground coal gasification process, generation will be enhanced to 100 MW by the end of 2016. Dr. Samar Mubarakmand was of the view that Pakistan has the "potential to generate 5,000 MW for at least 800 years."[10]
Grange Holdings Power Plant Arifwala, Punjab 163 Under construction, furnace oil combine cycle power plant, to be operational by October 2014.[11]
Jhang RLNG-based Power Project Haveli Bahadur Shah, Jhang District, Punjab 1230 Under construction; A consortium, comprising Power Construction Corporation of China and Al-Qavi, has been declared the lowest bidder for Rs82 billion power project in August 2015. The project is one of the five Regasified Liquefied Natural Gas (RLNG)-based projects, to begin commercial operations in 20 months as open cycle operation and shift to combined cycle in 30 months. [12]
Balloki-Kasur RLNG-based Power Project Balloki, Kasur, Punjab 1000-1200 Under construction; Combine Cycle Project. A consortium comprising Harbin Electric International and Habib Rafiq Ltd has been declared the lowest bidder for Rs82 billion power project in October 2015. The project is one of the five Regasified Liquefied Natural Gas (RLNG)-based projects, to begin commercial operations in 20 months as open cycle operation and shift to combined cycle in 30 months. [13][14]
Bhikhi RLNG-based Power Project Bhikhi, Sheikhupura, Punjab 1180 Under construction; Combine Cycle Project. PM Nawaz Sharif inaugurated the project October 10, 2015. The plant will be commissioned jointly by Harbin Electric International of China and American General Electric at a cost of 55 billion rupees to be completed by Dec 2017.[15][16]
Star Power Project Daharki, Ghotki District, Sindh 134 Proposed, UAE’s Al-Ghurair Group is setting up 134 MW Gas-Thermal power project, to be completed by July 2016 and expected to cost $100 million.[17]
American Ethane Gas power plants Sukkur, Sindh 6000 Proposed, 3 power plants of 2000 MW each.[18]
Kandra Power Company (KPC) Sukkur, Sindh 120 Proposed, LOI issued.[19]

Gas turbine plants

Station Location Coordinates Capacity (MW) Notes Refs
Kot Addu Power Company Limited Kot Addu, Muzaffargarh, Punjab Lua error in package.lua at line 80: module 'strict' not found. 1,600 Oil and Natural Gas fired thermal stations [20][21][22]
Guddu Thermal Station Guddu, Kashmore, Sindh Lua error in package.lua at line 80: module 'strict' not found. 2,402[23] Natural Gas-fired thermal station [5][24]
Bin Qasim Power Plant II Karachi, Sindh 560 Natural Gas-fired Combine Cycle Power station [20]
Foundation Power Company (Daharki) Limited Daharki, Sindh 27.985137, 69.673544 185 Combined Cycle Power Plant
Uch-I,II Power Plant Nasirabad District, Dera Murad Jamali, Balochistan 28.582798, 68.171539 1000 Natural Gas-fired thermal, Uch-II operational since April 2014[25]
Nandipur Power Project Gujranwala, Punjab 32.245294, 74.270007 425 Gas fired Plant, fully operational since July 2015 in cooperation with Dongfang Electric Corporation China.[26][27]
Pak Gen (Pvt) Limited Thermal Power Station Muzaffargarh, Punjab Lua error in package.lua at line 80: module 'strict' not found. 1350 500 MW capacity was currently restored with USAID help, work underway to restore rest of the capacity. [28][29] While on active Privatization list, four new electricity plants are being developed - Three of them will be powered by liquefied natural gas (LNG) while the fourth will run on coal.[30] Oil-fired thermal
Habibullah Coastal Power (Pvt) Company Quetta, Balochistan 140 Natural Gas Fired Plant [20][31]
WAPDA Quetta Thermal Power Station Quetta, Balochistan Lua error in package.lua at line 80: module 'strict' not found. 35 Natural Gas Fired Plant [32]
Liberty Power Project Daharki, Sindh 235 Natural Gas-fired thermal
Rousch (Pakistan) Power Plant Kabirwala, Punjab Lua error in package.lua at line 80: module 'strict' not found. 450 Natural Gas-fired thermal [20][33]
Engro Powergen Qadirpur Limited Ghotki, Sindh Lua error in package.lua at line 80: module 'strict' not found. 227 Combined Cycle Power plant [34]
Halmore Power Generation Company Limited Sheikhupura, Punjab 225 Gas Fired Combined Cycle
Liberty Power Tech Faisalabad, Punjab 200 Furnace Oil Combined Cycle
Orient Power Company Limited Balloki, Kasur District, Punjab 229 Gas Fired, Combined Cycle [20]
Saif Power Limited Sahiwal, Punjab 229 Gas fired, Combined Cycle.

Coal based power stations

In Service

Station Location Capacity (MW) Notes
Lakhra Coal Power Station Khanot, Jamshoro, Sindh 150 Power station of 150 MW (3x50 MW) installed capacity at Khanot/Jamshoro is the only coal-fired power plant in the country, which currently operates hardly at 20 MW capacity. It is also on the active privatisation list. With coal reserves of over 186bn tonns, Pakistan ranks 6th among coal-rich countries. Yet, coal’s potential has not been exploited adequately[35][36]

Under Construction and Proposed

Station Location Capacity (MW) Notes
Siddiqsons Energy Limited Port Qasim, Karachi, Sindh 350 Private coal-based power project, PPIB has issued a letter of support, estimated to cost $600 million and be completed by first quarter of 2016 [37]
Jamshoro Coal Power Project Jamshoro, Sindh 600 Under construction, a $1.5 billion joint venture of IDB, ADB and Government of Pakistan [38]
K-Electric Coal Power Plant Karachi, Sindh 660 Under construction by K-Electric and China's Harbin Electric International (HEI) [39]
Thar Power Plant Tharparkar, Sindh 660 Under construction; project involves development of mining at Thar Coal Block-II [40]
Thar Coal Power Plant Tharparkar, Sindh 1320 Letter of Interest issued. Shanghai Electric Group Company (SEGC) will set up two power plants of 660MW each in Thar and consume lignite coal, which will be supplied by Sino-Sindh Resources – the lease-holder of Thar block-I. The project, a CPEC priority program, is expected to start commercial production in 2018. [41]
Muzaffargarh Sugarcane Husk Power Project Muzaffargarh, Punjab 120 under construction. An energy unit is being executed with the Chinese assistance at a sugar mill, to produce 120 megawatt electricity from coal and sugarcane husk, to be completed by February 2016, at a cost of 27 billion rupees.[42][43] Sinawan city
Sahiwal Coal Power Project Sahiwal, Punjab 1320 Under construction since May 2014 with China's help, Punjab's first coal power plant will be completed by 2016.[44]
Port Qasim Coal Power Project Port Qasim, Karachi, Sindh 1320 Under construction since May 2014, a joint venture of China's Powerchina and Qatar's Al-Mirqab Group.[45]
Hub Coal Power Project Hub, Balochistan 1320 Under construction, In January 2015, HUBCO announced that it would set up 1,320MW coal-based power plants next to its thermal power station at Hub in Balochistan and gradually enhance coal based generation to 3,600MW [46]
Maple Leaf Power Limited Iskandarabad, Mianwali, Punjab 40 Under construction, In Dec 2015, Maple Leaf Cement announced that it would set up 40MW coal-based power plant, which will be functional by May 2017.[47]
Gadani Energy Park Gadani, Balochistan 6600 Proposed, China will install 10 coal power plants of 660MW each that will cost $1.4 billion.[48]

Hydroelectric

In service

Station Community Location Capacity (MW) Status
Tarbela Dam Tarbela, Haripur District, Khyber Pakhtunkhwa (KPK), Indus River Lua error in package.lua at line 80: module 'strict' not found. 3,478 Operational since 1974, 1410 MW Tarbela-IV Extension is underway to be completed by June 2017 and increase the capacity to 4888 MW.[49] Feasibility study of Tarbela-V Extension has been completed that would generate additional 1,320 MW electricity and increase the capacity to 6,208 MW in almost four years.[50][51][52][53][54]
Ghazi-Barotha Hydropower Project Attock, Punjab, Indus River Lua error in package.lua at line 80: module 'strict' not found. 1,450 Operational since 2002; Run-of-the-river
Mangla Dam Mirpur, AJK, Jehlum River Lua error in package.lua at line 80: module 'strict' not found. 1,120 The Dam comprised four power units of 100MW each when it was constructed in 1967. In 1974, two units were added followed by another two in 1981. The capacity of 1,000 MW was realised in 1994 when two more units were installed. After undergoing refurbishment project is completed capacity will increase by another 310 MW. [55][56][57]
Warsak Dam Peshawar, Kabul River, KPK Lua error in package.lua at line 80: module 'strict' not found. 243 Operational since 1960. Dam completely silted up; Power generation by Run of the river. Extension and rehabilitation is being planned.[58] The total cost of the rehabilitation project €162 million is being co-financed with the KfW (€40 million), EIB (€4.5 million), AFD (€41.5 million) and Pakistan government contributions.[59][60]
Chashma Barrage Chashma, Indus River, Punjab 184 Operational since 2001. Construction completed in 1971 [61]
Allai Khwar Hydropower Project Mansehra, KPK, Indus River 121 Operational since 2013 [62]
New Bong Escape Hydropower Plant Mirpur, AJK, Jehlum River 84 Operational since March 2013. Privately owned hydropower plant.[63]
Khan Khwar Hydropower Project Shangla District, KPK, Indus River 72 Operational since April 2012 [64]
Duber Khwar hydropower project Kohistan District, KPK, Indus River 130 Operational since 2013 [65]
Jinnah hydropower project Jinnah Barrage, Punjab, Indus River 96 Operational since 2013 [66][67]
Jagran-I Dam Neelum Valley, AJK, Jagran River Lua error in package.lua at line 80: module 'strict' not found. 30.4 Operational since 2000[68][69]
Gomal Zam Dam South Waziristan, FATA, Gomal River 17.4 Operational since August 2013 [70]
Satpara Dam Skardu, Satpara River 17.3 Operational since Nov 2012;[71][72][73][74]
Rasul Barrage Hydropower Project Mandi Bahauddin, Jehlum River, Punjab Lua error in package.lua at line 80: module 'strict' not found. 22 Operational since 1952, upgradation to 35MW is planned.
Jabban Hydropower Plant (Malakand-I) Malakand District, Swat River 22 Operational since 1935.[68] Rehabilitated recently.[71] Cascade type power plant.
Dargai Hydropower Plant (Malakand-II) Malakand District, Dargai, Swat River 20 Operational since 1953.[68] Cascade type power plant.
Malakand-III Hydropower Project Dargai, Malakand District, Swat River, KPK 81 Operational since June 2008.[68]
Shadiwal Hydropower Plant Shadiwal Warriach, Gujrat District, Punjab, UJC Lua error in package.lua at line 80: module 'strict' not found. 13.5 Operational since 1961,[75]
Chichonki Malian Hydropower Plant Sheikhupura, Upper Chenab Canal [76] Lua error in package.lua at line 80: module 'strict' not found. 13.2 Operational since 1959.[68]
Nandipur Hydropower Plant Gujranwala, Upper Chenab Canal [76] 13.8 Operational since 1963.[68]
Naltar-I, Nalter-II HPPs Gilgit, Naltar River 2.28 Operational.[68][77]
Naltar-IV Hydropower Plant Gilgit, Naltar River 18 Operational since October 2007.[68][77]
Kurram Garhi Hydropower Plant Kurram Garhi, KPK, Kuchkot Canal 4.00 Operational since 1958 [68]
Reshun Chitral 4.5 Operational since 1991[68][69]
Renala Khurd Hydropower Plant Renala Khurd, Okara District, Lower BariDoab Canal Lua error in package.lua at line 80: module 'strict' not found. 1.1 Operational since 1925, Pakistan's first hydropower project.[68]
Darawat Dam Jamshoro District, Sindh, Nai Baran River 0.45 Operational since August 2014 [78][79][80]
Machai Dam Mardan District, KPK, Machai Canal 1 Operational.[68] An IPP BlueStar Energy (Pvt)Limited.[81]
PAEC Chashma Hydel Dam Chashma, Mianwali District, Punjab 1.2 Operational since 2000.[68]
Kathai Dam Muzaffarabad, AJK, Hattian Bala District, Kathai Nullah 3.2 Operational since 1995,[68][82] provides electricity to some 60 villages with a total population of 150,000.
Kundal Shahi HPP Neelam Valley, GB 2 Operational since 1992[54][68]
Kel HPP Muzaffarabad, AJK 0.45 Operational.[68]
Leepa Dam Leepa Valley, Muzaffarabad, AJK 2 Operational.[68]
Jari Dam Mirpur, Azad Kashmir 1 Operational.[68]
Chitral Hydel Power Station Lutkho River, Chitral 1.00 Operational since 1975, 2 units of 200 KW and 2 units of 300 KW each, Under preliminary studies to increase capacity to 5MW.[68][83]
Singul Dam Gilgit 1.20 Operational[68]
Pion Dam Gah 1 Operational[68]
Sermik Dam Skardu 1 Operational[68]
Basho-I Dam Skardu 1 Operational[68]
Tormik-I Dam Roundu Valley, GB 1 Operational[68]
Haramosh Dam Gilgit 1 Operational[68]
Bubind Dam Astore 0.64 Operational[68]
Gilgit Dam Gilgit 10.63 Operational[68]
Skardu-I Dam Skardu 6.96 Operational[68]
Skardu-II, III Dams Skardu 1.64 Operational[68]
Chilas-I Dam Chilas 5.62 Operational[68]
Hunza Dam Hunza Valley, GB 5.13 Operational[68]
Shyok Dam Shyok Valley, GB 4.85 Operational[68]
Astore Dam Astore 3.11 Operational[68]
Kachura-II Dam Skardu 3.00 Operational[68]
Ghizar Dam Ghizer District, GB 2.00 Operational[68]
Thak Dam Chilas 2.00 Operational[68]
Phandar Dam Ghizer District, GB 2.00 Operational[68]
Bordas Dam Ghanche 2.00 Operational[68]
Kharmang Dam Kharmang Valley, GB 1.89 Operational[68]
Yasin Dam Ghizer District, GB 1.61 Operational[68]
Bunnar Chilas Dam Diamer District, GB 1.5 Operational[68]
Roundu Dam Roundu Valley, GB 1.52 Operational[68]
Kar Gah-I, II, III, IV, V, VI, VII HPPs Gilgit 13.34 Operational[68]
Hisper-I Dam Hunza Valley 1.00 Operational[68]
Naz Bar Dam Yasin Valley 1.00 Operational[68]
Jaglot-I, II HPPs Jaglot 1.32 Operational[68]
Chalt Dam Nagar Valley 1.00 Operational[68]
Khyber-I, II Dams Gilgit 2.00 Operational[68]
Shigar Dam Skardu 1.00 Operational[68]
Shirting Dam Skardu 1.00 Operational[68]
Sher Qila Dam Gilgit 1.11 Operational[68]
Parishing/Louse Astore 1.00 Operational[68]
Darel-I,II Dams Ghanche 1.2 Operational[68]
Bunner Dam Chilas 1.00 Operational[68]
Tangir Dam Chilas 1.00 Operational[68]
Boladas-I Dam Hunza Valley, GB 0.64 Operational[68]
Khunjerab Dam Gujrab River 0.59 Operational[68]
Gol Dam Skardu 0.4 Operational[68]
Harpo-I, Harchu, Dainyor, Gurikot, Kayo, Dango Das HPPs Various Locations in GB 2.00 Operational[68]
Manthoka, Astore, Gulmit, Tolti-I, Khaplu-I, Kachura-I, Darel HPPs Various Locations in GB 1.50 Operational[68]
Khaibar-I, II, Mushki, Rattu, Misgar, Ghandus, Kiris-I, Thally-I, Mendi, Stak HPPs Various Locations in GB 1.85 Operational[68]
Tangir-I, Chillas-II, Hayul, Khaplu-I, Sumayar-I, Mehdabad, Nomal, Pari HPPs Various Locations in GB 1.5 Operational[68]
Jaglot Sai, Sermik-I, Olding-I, Thore, Minapin-I, Ahmadabad-I, II, Chalt-I, Sosat HPPs GB 1.00 Operational[68]
Jalalabad Dam Gilgit 1.00 Operational[68]
Hasanabad-I, II, III, IV, V Dams Hunza Valley 2.00 Operational[68]
Dumsum Dam Gah 1.5 Operational[68]
Balagond Dam Gah 1.5 Operational[68]
Ishkuman-I, II Dams Ishkuman 2.38 Operational[68]
Ashuran Dam 0.40 Operational[68]
Thall Dam 0.40 Operational[68]
Bumborat, Shishi, Karora, Kalam, Keyal, Kaghan, Duber, Jalkot, Gram Chashma, Damori, Keel, Pattika, Chinari, Serai HPPs Various Locations in KPK 2.1 Operational[68][84]

Under construction or proposed

Station Community Location Capacity (MW) Status
Neelum–Jhelum Hydropower Plant Muzaffarabad, Azad Kashmir, Neelum River Lua error in package.lua at line 80: module 'strict' not found. 969 Under construction, with 74% work completed as of September 2015, to be operational by Dec 2016.[66][85][86][87]
Tarbela Dam Extension-IV and V Tarbela, Haripur District, Khyber Pakhtunkhwa (KPK), Indus River Lua error in package.lua at line 80: module 'strict' not found. 3,478 (+1410+1320) Operational since 1974, 1410 MW Tarbela-IV Extension is underway to be completed by June 2017 and increase the capacity to 4888 MW.[88] 1320 MW Tarbela 5th Extension project, feasibility studies for which has been completed, is expected to be completed in four years and increase the capacity to 6208 MW.[89][90]
Golen Gol Hydropower Project Chitral, KPK, Mastuj River 106 Under Construction, 65% complete. To be completed by the end of 2015.[66][66] cost estimate $130 million [79]
Patrind Hydropower Plant Muzaffarabad, Abbottabad District, Azad Kashmir, Kunhar River 147 Under construction. To be completed in 2016; Privately owned hydropower plant.[63] Project is being financed by IFC, ADB and K-Exim Bank.[91]
Diamer-Bhasha Dam Chilas, Indus River, Gilgit-Baltistan Lua error in package.lua at line 80: module 'strict' not found. 4,500 Under construction. 17,000 acres of land has been acquired by WAPDA. Preliminary work i.e. construction of Wapda offices, residential facilities, roads and other infrastructure at Thor and Shatial bypass underway.[92] Estimated to cost around $14 billion and be completed in about 12 years i.e. 2025
Keyal Khwar Hydropower Project Kohistan District, KPK, Indus River 128 Under Construction. Cost estimate €240 million. EIB and KfW signed loan agreements to provide €100 million and €97 million respectively for the project. Expected to be completed by October 2016 and contract for civil work has already been awarded. The preliminary works i.e. construction of offices, colony and roads are already in progress[93][94]
Nai Gaj Dam Dadu District, Gaj River, Sindh 4.2 Under Construction, Progress 23% until Dec 2013. Estimated to cost $332 million and completed by June 2015 [79][95]
Chashma Hydel Power Project Chashma, Mianwali District, Indus River, Punjab 5.0 Under Construction. 2*2.5 units[96]
Naltar-V HPP Gilgit, Naltar River 14.4 Under Construction, expected to cost PKR 3.84 billion and would be completed in 2016 with Chinese cooperation.[97]
Naltar-III HPP Gilgit, Naltar River 16 Under Construction, expected to cost Rs1,372 million.[77]
Dasu Dam Kohistan District, KPK, Dassu, Indus River 4,320 Under construction.[98][99] Feasibility study and detailed engineering designs of the $7.5 billion project have been completed. WB will be the major source of finance for the project.[100][101][102]
Shagarthang Hydropower Project Skardu, Baltistan, Indus River 26 Under construction, estimated to cost up to Rs4,843.726 million. 80% of the cost is being provided by ADB and EIB, scheduled to be completed by March 2018.[103][104]
Taunsa Barrage Hydropower Plant Taunsa, Muzaffargarh District, Punjab, Indus River 120 Under construction, expected to cost Rs26 billion, to be completed in four years.[105]
Naulong Dam Jhal Magsi District, Mula River, Balochistan 4.4 Under construction. Feasibility study and detailed engineering design of the Project completed in 2009.[95] The $377 million[71][79] project is scheduled to be completed by June 2015.
Gulpur Hydropower Project Gulpur, Azad Kashmir, Poonch River 102 Under construction, PPIB has issued LOS for the $320 million project, which is sponsored by Korea South East Power Company (KOSEP)[79][91] Sambu, a Korean IPP, has been awarded the project on BOOT basis and execution of work is in progress.[106][107]
Karot Hydropower Project Jehlum River, Rawalpindi District, Punjab 720 Under Construction, Ground Breaking Ceremony held on 20-April-2015[108][109]IFC to invest $100 million in Karot HPP, whose construction is expected to take five years, will include a 95.5-metre-high dam, a surface powerhouse, four headrace tunnels, a spillway and a 5km-long, 500 kilovolts transmission interconnection to the national grid, expected cost $2 billion and generate 3,174 GWh annually. [110]
Hanzel Hydropower Project Hanzel, Gilgit 20 Ready to be constructed. CDWP approved a 20MW hydropower project to be located at Hanzel in Gilgit costing Rs6.248bn and will be completed in four years[111]
SK Hydropower Project Kaghan Valley, Mansehra District, KPK, Kunhar River 840 Ready to be constructed, Run-of-the-river project. Feasibility studies completed.[112]
Kurram Tangi Dam North Waziristan, FATA, Kurram River 83.4 Ready to be constructed. Engineering study completed. USAID allocated $81 million for phase-I of the project. Estimated cost is $260 million.
Bara Dam Tirah, Khyber Agency, FATA, Bara River 5.8 Ready to be constructed. Feasibility study completed in 2008.[66][71][71][72][73]
Kohala Hydropower Project Muzaffarabad District, Azad Kashmir, Jhehlum River 1100 Ready to be Constructed. Feasibility and engineering studies completed. Cost estimate $2.155 billion [63]
Kalabagh Dam Kalabagh, Punjab, Indus River 3600 Ready to be constructed. Engineering study completed but project is currently at pause due to lack of consensus between provinces.
Kotli Hydropower Project Kotli District, Poonch River, AJK 102 Ready to be constructed, Run-of-the-river[79] PPIB has received bids from foreign and local investors for the project on build, operate and transfer (BOT) basis. ADB will provide loan to Mira Power Limited, a South Korean Company, for construction. [113]It will be 4th private sector hydropower project in the country and will cost $170 million to construct.[114]
Bunji Hydropower Project Astore District, Gilgit-Baltistan Lua error in package.lua at line 80: module 'strict' not found. 7,100[115] Run-of-the-river, feasibility studies in progress,[66] cost estimate $6.8 billion[79]
Phandar Hydropower Project Ghizer District, Gilgit-Baltistan 81 Detailed engineering design or tender of documents under process,[66][73] cost estimate $4.4 billion [63]
Basho Hydropower Station Skardu, GB, Indus River 28 Detailed engineering design or tender of documents under process[66][71]

[72][73] Proposed, cost estimate $40 million [63] AFD of France will be the major source of funding for the project.[116]

Lawi Hydropower Project Chitral, Shishi River 69 Detailed engineering design or tender of documents under process,[66][71][72][73] cost estimate $120 million [63]
Harpo Hydropower Project Skardu, Indus River 34.5 Detailed engineering design or tender of documents under process,[66][71][72][73] cost estimate $46 million [63] The French development agency, AFD will provide 50m euros for the project.[117]
Munda Dam Mohmand Agency, FATA, Swat River Lua error in package.lua at line 80: module 'strict' not found. 740 Under engineering study,[66][71][72][73] cost estimate $1.149 billion[79]
Akhori Dam Akhori, Punjab, Haro River 600 Feasibility study stage, cost estimate $1.6 billion [63]
Skardu-Katzarah Dam Katzarah, Gilgit-Baltistan 15,000 Proposed, WAPDA decided to shelve the project on the basis of over a dozen negative impacts which it said made the multi-purpose dam site unfeasible in the present circumstances.[118]
Lower Spat Gah hydropower project Kohistan District, KPK, Indus River 665 Feasibility studies completed,[71][72][73] cost estimate $697 million[79]
Middle Palas hydropower project Kohistan, KPK 373 Feasibility studies ongoing,[71][72][73] cost estimate $763 million[79]
Upper Palas hydropower project Kohistan, KPK 160 Feasibility studies ongoing,[71][72][73] cost estimate $763 million[79]
Thakot Hydropower Project Battagram District, KPK Lua error in package.lua at line 80: module 'strict' not found. 2,800 Feasibility studies ongoing,[71][72][73] cost estimate $6 billion [63]
Patan hydropower Project Patan Village, Indus River 2,200 Feasibility studies ongoing,[71][72][73][95] cost estimate $6 billion [63]
Tank Zam Dam Hinis Tangi, KPK, Tank Zam River 25.5 Proposed, Feasibility studies completed in 1988,[71] cost estimate $234 million[79]
Athmuqam Dam Athmuqam, Azad Kashmir, Neelum River 350 Proposed, PPIB gave the green signal for inviting proposals [119]
Rajhdani Dam Kotli District, AJK Poonch River 132 Proposed Roller Compacted Concrete (RCC) dam,[120] EOI invited.[119]
Nekherdim-Paur Dam Chitral, KPK 80 Proposed, EOI invited.[119]
Turtonus-Uzghor Dam Chitral, KPK 58 Proposed, EOI invited.[119]
Mahl Hydropower Project Azad Kashmir, Jehlum River Lua error in package.lua at line 80: module 'strict' not found. 590 Proposed, Run-of-the-river [79] PPIB has issued LOI to the consortium of CWE of China and Trans Tech of Pakistan for the project.[119]
Thack HPP Chilas 4 Proposed
Bhadi Dhoba HPP Haveli District 1 Proposed
Galeter HPP Kotli District 1 Proposed [121]
Saridoa Cross HPP Bhimber District 1.7 Proposed
Chamfall HPP Hattian District 6.4 Proposed [121]
Guddu Hydropower Station Kashmore, Sindh 33 Proposed
Azad Pattan Hydropower Project Azad Pattan, Sudhnoti, Jehlum River, Azad Kashmir 650 Proposed
Harighel Hydropower Project 53 Proposed
Sehra Hydropower Project Azad Kashmir, Poonch River 130 Proposed
Chakothi-Hattian HPP Muzaffarabad, AJK, 500 Proposed
Jagran-II Hydropower Project Neelum, AJK, Jagran River 48 Proposed; Run-of-the-river;[122] France has promised to fund part the construction. Construction expected to start in 2015 and cost about 68 million Euros.[122][123]
Sharmai Hydropower Project 115 Proposed
Madian Hydropower Project Swat, KPK, Swat River 157 Under Feasibility studies.[124]
Asrit-Kedam HPP Kalam, KPK, Swat River 215 Proposed
Kalam Asrit 197 Proposed
Gabral Kalam 101 Proposed
Karang Hydropower Project 458 Proposed
Kaigah Hydropower Project Kaigah, KPK, Indus River 548 Feasibility Studies completed.[124]
Shogo-Sin Hydel Dam 132 Proposed
Shushgai Zhendoll 144 Proposed
Yogo, Pakistan 500 Proposed
Thor Hydropower Project 3.6 Proposed [79]
Yulbo Hydropower Project 3000 Proposed [63]
Shyok Hydropower Project 520 Proposed [63]
Tungus Hydropower Project 2200 Proposed [63]
Skardu Dam Skardu 1600 Proposed [63]
Dudhnial Hydropower Project 960 Proposed [63]
Kundal Shahi Hydropower Project 960 Proposed [63]
Trappi Hydropower Project 32 Proposed [63]
Tangir Hydropower Project Tangir Valley, Chilas, GB 15 Proposed, cost estimate $30.967 million [79]
Matiltan Hydropower Project 84 Proposed [63]
Winder Dam Lasbela District, Winder River, Balochistan 0.3 Proposed, cost estimate $148 mill [79]
Hingol Dam Lasbela District, Hingol River, Balochistan 3.5 Proposed; Feasibility study, detailed engineering designs studies and tender document completed in 2009. Cost estimate $311 million [79]
Garuk Dam Kharan District, Garuk River, Balochistan 0.72 Proposed, cost estimate $21 million [71][79]
Pelar Dam Awaran District, Pelar River, Balochistan 0.3 Proposed, cost estimate $20 million[79][125]
Daraban Zam Dam Dera Ismail Khan, KPK, Khora River 0.75 Proposed, cost estimate $69 million[79]
Ghabir Dam Ghabir River 0.15 Proposed, cost estimate $121 million [79]
Papin Dam Rawalpindi District, Wadala Kas 0.3 Proposed, cost estimate $101 million [79]
Latambar Dam Karak District, Khyber Pukhtunkhwa  ? The preliminary feasibility study of the project has been completed and process of site selection completed.[126]
Mairoobi Dam Nowshera District, Khyber Pukhtunkhwa  ? The preliminary feasibility study of the project has been completed and process of site selection completed.[127]
Jaroba Dam Nowshera District, Khyber Pukhtunkhwa  ? The preliminary feasibility study of the project has been completed and process of site selection completed.[128]
Naran Dam Mansehra District, Khyber Pukhtunkhwa 188 The preliminary feasibility study of the project has been completed and process of site selection completed.[129]
Gorband Dam Shangla District, Khyber Pukhtunkhwa 50 The preliminary feasibility study of the project has been completed and process of site selection completed.[130]
Nand Bahar Dam Battagram District, Khyber Pukhtunkhwa 50 The preliminary feasibility study of the project has been completed and process of site selection completed.[131]
Mojigram Shagoor Dam Chitral District, Khyber Pukhtunkhwa 50 The preliminary feasibility study of the project has been completed and process of site selection completed.[132]
Astar Rabooni Dam Chitral District, Khyber Pukhtunkhwa 50 The preliminary feasibility study of the project has been completed and process of site selection completed.[133]
Arkari Gol Dam Chitral District, Khyber Pukhtunkhwa 50 The preliminary feasibility study of the project has been completed and process of site selection completed.[134]


Ranolia Dam Kohistan District, Khyber Pukhtunkhwa 17 The work has been completed and are ready for execution. [135]
Machi Dam Mardan District, Khyber Pukhtunkhwa 2.6 The work has been completed and are ready for execution. [136]
Dararkhwar Dam Swat District, Khyber Pukhtunkhwa 36 It will start production by December 2015. [137]
Shringal Dam Upper Dir District, Khyber Pukhtunkhwa 50 The preliminary feasibility study of the project has been completed and process of site selection completed.[138]
Patrak Barikot Dam Swat District, Khyber Pukhtunkhwa 60 The preliminary feasibility study of the project has been completed and process of site selection completed.[139]
Segokatch Dam Chitral District, Khyber Pukhtunkhwa 60 The preliminary feasibility study of the project has been completed and process of site selection completed.[140]

Nuclear

Location of Nuclear Power Plants in Pakistan

In service

Station Community Location Capacity (MW) Status
Chashma Nuclear Power Complex Chashma, Mianwali District Lua error in package.lua at line 80: module 'strict' not found. 650 Chashnupp-1 became operational in June 2000, and Chashnupp-2 in March 2011[141][142]
Karachi Nuclear Power Complex Karachi, Sindh Lua error in package.lua at line 80: module 'strict' not found. 125 Operational since 1972.[142]

While not an electricity generating facility, the Khushab Nuclear Complex near Khushab, Punjab has been operational since 1998, producing plutonium and tritium for use in compact nuclear warheads.

Under construction or proposed

Station Community Location Capacity (MW) Status
Chashma Nuclear Power Complex Kundian, Mianwali District Lua error in package.lua at line 80: module 'strict' not found. 680 Chashnupp-3 will be completed by 2016, and Chashnupp-4 by 2017.[143] PAEC has recently completed the Dom Placement at Chashma-3 and Chashma-4[144] completion of both to cost $1.9 billion.[142][145]
Karachi Nuclear Power Complex Karachi 2200 Kanupp-II & III, 1100 MW each, are under-construction since 26 November 2013, to be completed by 2020. Project to cost $9.59 billion.[146][142][147]
Coastal Nuclear Power Project Hub, Balochistan 2200 Proposed [142]
Chashma Nuclear Power Plant V (CHASNUPP-5) Mianwali, Punjab 1000 Proposed[142]

Renewables

Wind Power

According to a USAID report, Pakistan has the potential of producing 150,000 megawatts of wind energy, of which only the Sindh corridor can produce 40,000 megawatts.

Station Community Location Capacity (MW) Status
Jhimpir Wind Power Plant Jhimpir, Sindh 56.4 6 MW Operational since 2009; 50.4 MW added in March 2013. Pakistan's first wind power station[148]
Jhimpir Wind Energy Project (FFCEL) Jhimpir, Sindh 49.6 Operational since Dec 2012 [149]
Three Gorges First Wind Farm Pakistan Ltd Jhimpir, Sindh 49.5 Operational since Dec 2014, 33 wind turbines of 1.5 MW each [150]
Foundation Wind Energy–I & II Pvt. Ltd Khutti Kun, Gharo, Sindh 100 Operational since Jan 2015 [150]
Dawood Power (Pvt) Limited Bhambore, Gharo, Sindh 50 Under construction wind energy project.[151]
Bhambore Wind Project Gharo, Sindh 50 Under construction.[151]
Yunus Energy Limited Jhimpir, Sindh 50 Under construction wind energy project.[151]
Gharo Wind Power Plant Gharo, Sindh 50 Under construction.
Tenaga Generai Limited Khutti Kun, Mirpur Sakro, Thatta District, Sindh 49.5 Under construction to be completed by September 2016.[151]
Sapphire Wind Power (Pvt) Limited Sindh 49.5 Under construction[151]
Metro Wind Power Co Limited Jhimpir, Sindh 50 Under construction.[151][152]
Gul Ahmed Wind Power Limited Jhimpir, Sindh 50 Under construction, to be completed by Dec 2016[151]
Master Wind Energy Limited Jhimpir, Sindh 49.5 Under construction, to be completed by Dec 2016[151]
Sachal Engineering Works (Pvt) Limited Jhimpir, Sindh 50 Under construction wind power project.[151]
Wind Eagle (Pvt) Limited Jhimpir, Sindh 50 Under construction.[151]
UEPL Wind Power Pakistan (Pvt) Ltd Jhimpir 100 Under construction.[153]
Hawa Energy Ltd Jhimpir 50 Under construction [153]
Dewan Energy (Pvt) Ltd Jhimpir 50 Under construction [153]
Tapal Wind Energy Ltd Jhimpir,Thatta, Sindh 30 Under construction, to be completed by Dec. 2016 [153]
Titan Energy Pakistan (Pvt) Ltd Jhimpir 50 Under construction [153]
Hartford Alternate Energy Jhimpir 50 Under construction [153]
Finerji (Pvt) Ltd Jhimpir 50 Under construction [153]
China Sunec Energy (Pvt) Ltd Jhimpir 50 Under construction [153]
Tricon Boston Corporation Jhimpir 50 Under construction [153]
Trident Energy (Pvt) Ltd Jhimpir 50 Under construction [153]
Zephyr Power Ltd Bhambore 50 Under construction [153]
HydroChina Dawood Power Ltd Bhambore 50 Under construction [153]
Thatta Power Plant Sindh 150 Proposed, Iran-Pakistan wind power station[149]
AM Pak Energy Punjab 50 LOI issued [154]
MBM ENGINEERING COMPANY KARACHI 1 Under construction[155]

Solar Power

Pakistan is an exceptionally sunny country. If 0.25% of Balochistan (about 0.1% of Pakistan) is covered with solar panels with an efficiency of just 20%, enough electricity would be generated to cover all of Pakistani demand.[156]

Station Community Location Capacity (MW) Status
Quaid-e-Azam Solar Park Lal Suhanra National Park, Cholistan, Bahawalpur, Punjab 1000 100 MW Operational, to be fully operational (i.e. 1000MW) by 2016 [157]
Pakistan Parliament Islamabad, Pakistan 1.2 First Parliament in the world that goes Solar in April 2015. A gift from China.[158]
Conergy Solar Project Bahawalpur, Punjab 50 German Conergy plans to install 50MW solar power. [159]
Scatec Solar Project Sindh 150 Norwegian firm to set up three 50MW solar power plants in Pakistan.[160]
Roshan Power Solar Kasur 10 LOI issued[154]
Bakhsh Energy Solar Lodhran 20 LOI issued [154]
SSJD Bagasse Energy Jhimpir, Sindh 50 Under construction. Pakistan's first Bagasse based energy project.[151]
DACC LLC Solar Sindh 50 LOI issued [154][161]
Wah Industries Limited Solar Taxila, Punjab 1 LOI issued[154]
Tech Access Solar Punjab 10 LOI issued[154]
Solar Energy Pakistan Ltd Thatta, Sindh 35 LOI issued [154]
First Solar Punjab 2 LOI issued [154]
CWE Solar Cholistan 50 LOI issued [154]

See also

References

  1. http://tribune.com.pk/story/208495/dark-days-ahead-electricity-woes-to-worsen-in-future/
  2. http://tribune.com.pk/story/655573/pakistans-energy-security/
  3. http://www.dawn.com/news/1172656
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 Lua error in package.lua at line 80: module 'strict' not found.
  6. http://www.brecorder.com/brief-recordings/0/1234108/
  7. http://www.dawn.com/news/905704/saudi-group-to-expand-hubco-plant-s-capacity
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. http://tribune.com.pk/story/894450/energetic-thar-coal-plant-begins-power-generation/
  11. http://www.grangepower.co.uk/our-profile.php
  12. http://www.dawn.com/news/1203300/consortium-wins-rs82-billion-1000mw-project
  13. http://www.dawn.com/news/1203300/consortium-wins-rs82-billion-1000mw-project
  14. http://www.dawn.com/news/1210939/chinese-led-consortium-termed-lowest-bidder-for-power-project
  15. http://en.dailypakistan.com.pk/pakistan/pm-nawaz-inaugurates-1180mw-bhikki-power-plant-in-sheikhupura/
  16. http://www.dawn.com/news/1211897
  17. http://www.dawn.com/news/268525/accord-for-134mw-power-project
  18. http://www.geo.tv/article-188225-US-firm-to-set-up-6000MW-gas-based-power-plants
  19. http://www.ppib.gov.pk/N_oilgas_with_loi.htm
  20. 20.0 20.1 20.2 20.3 20.4 Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. http://tribune.com.pk/story/698409/pak-china-friendship-is-sweeter-than-the-sweetest-honey-nawaz/
  24. http://globalenergyobservatory.org/form.php?pid=3425
  25. http://www.dawn.com/news/1102238/nawaz-launches-uch-ii-power-project
  26. http://www.dawn.com/news/1109742/pm-inaugurates-nandipur-power-project
  27. http://en.dailypakistan.com.pk/business/nandipur-power-project-soon-to-be-fully-operational-456/
  28. https://www.usaid.gov/news-information/fact-sheets/muzaffargarh-power-station-project
  29. https://www.usaid.gov/sites/default/files/documents/1871/Muzzargarh%20Power%20Station.pdf
  30. http://tribune.com.pk/story/958202/muzaffargarh-power-station-to-be-up-for-sale-with-clean-balance-sheet/
  31. Lua error in package.lua at line 80: module 'strict' not found.
  32. http://globalenergyobservatory.org/list.php?db=PowerPlants&type=Gas
  33. Lua error in package.lua at line 80: module 'strict' not found.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. http://globalenergyobservatory.org/list.php?db=PowerPlants&type=Coal
  36. http://www.dawn.com/news/1172656
  37. http://tribune.com.pk/story/949102/coal-based-power-letter-of-support-issued-for-350mw-project/
  38. http://www.dawn.com/news/1096488/idb-approves-220m-for-jamshoro-power-project
  39. http://www.dawn.com/news/1092990/ke-to-set-up-coal-power-plant
  40. http://www.dawn.com/news/1188606/setting-up-of-1400mw-coal-based-power-project-in-thar-approved
  41. http://tribune.com.pk/story/942529/letter-of-interest-chinese-firm-to-develop-coal-based-power-projects/
  42. http://nation.com.pk/national/11-Jul-2015/pak-china-working-on-120-mw-power-plant-in-muzaffargarh
  43. http://tribune.com.pk/story/919232/international-cooperation-china-to-help-set-up-bio-tech-lab-in-multan/
  44. http://www.dawn.com/news/1109535/pm-performs-ground-breaking-of-punjabs-first-coal-power-plant
  45. http://www.dawn.com/news/1104610/govt-committed-to-resolve-power-shortage-says-nawaz
  46. http://www.dawn.com/news/1188606/setting-up-of-1400mw-coal-based-power-project-in-thar-approved
  47. http://www.dawn.com/news/1227902/mlcf-to-set-up-power-plant
  48. http://tribune.com.pk/story/676128/helping-hand-china-signs-agreements-worth-30b/
  49. http://www.dawn.com/news/1167908/another-51m-to-expedite-tarbela-project-completion
  50. http://tribune.com.pk/story/965932/tarbela-fifth-extension-project-gets-cdwps-nod/
  51. http://www.dawn.com/news/1167908
  52. http://tribune.com.pk/story/671783/wapda-awards-312-million-contract-for-tarbela-4th-extension-hydropower-project/
  53. http://tribune.com.pk/story/676559/tackling-energy-crisis-nawaz-inaugurates-tarbela-iv-project/
  54. 54.0 54.1 Lua error in package.lua at line 80: module 'strict' not found.
  55. http://tribune.com.pk/story/934253/mangla-power-project-to-increase-generation/
  56. http://www.wapda.gov.pk/pdf/ManglaR1010.pdf
  57. http://www.dawn.com/news/1224280/fresh-bids-for-six-mangla-turbines-received-saving-of-rs4bn-expected
  58. http://www.pepco.gov.pk/warsak.php
  59. http://www.dawn.com/news/1207464/germany-to-lend-40m-euros-for-warsak-power-station
  60. http://www.dawn.com/news/1208766/france-announces-rs505bn-credit-for-warsak-project
  61. http://www.wapda.gov.pk/htmls/chashmabarrage.htm
  62. http://paktribune.com/business/news/Chinese-company-hands-over-Allai-Khwar-power-project-to-WAPDA-11655.html/
  63. 63.00 63.01 63.02 63.03 63.04 63.05 63.06 63.07 63.08 63.09 63.10 63.11 63.12 63.13 63.14 63.15 63.16 63.17 http://www.wapda.gov.pk/pdf/BroHydpwrPotialApril2011.pdf
  64. http://dawn.com/2012/07/14/hydropower-project-opening-today/
  65. http://www.nation.com.pk/business/04-Jan-2014/30mw-duber-khwar-hydropower-project-starts-test-production
  66. 66.00 66.01 66.02 66.03 66.04 66.05 66.06 66.07 66.08 66.09 66.10 http://www.nation.com.pk/pakistan-news-newspaper-daily-english-online/Business/10-Mar-2010/32-dams-to-be-constructed
  67. http://www.nation.com.pk/business/11-Jan-2012/wapda-puts-96mw-jinnah-hydropower-project-on-test-trial
  68. 68.00 68.01 68.02 68.03 68.04 68.05 68.06 68.07 68.08 68.09 68.10 68.11 68.12 68.13 68.14 68.15 68.16 68.17 68.18 68.19 68.20 68.21 68.22 68.23 68.24 68.25 68.26 68.27 68.28 68.29 68.30 68.31 68.32 68.33 68.34 68.35 68.36 68.37 68.38 68.39 68.40 68.41 68.42 68.43 68.44 68.45 68.46 68.47 68.48 68.49 68.50 68.51 68.52 68.53 68.54 68.55 68.56 68.57 68.58 68.59 68.60 68.61 68.62 68.63 68.64 68.65 68.66 68.67 68.68 68.69 68.70 http://www.ppib.gov.pk/HYDRO.pdf
  69. 69.0 69.1 http://www.industcards.com/hydro-pakistan.htm
  70. Lua error in package.lua at line 80: module 'strict' not found.
  71. 71.00 71.01 71.02 71.03 71.04 71.05 71.06 71.07 71.08 71.09 71.10 71.11 71.12 71.13 71.14 71.15 http://www.wapda.gov.pk/htmls/ongoing-index.html
  72. 72.00 72.01 72.02 72.03 72.04 72.05 72.06 72.07 72.08 72.09 72.10 http://www.wapda.gov.pk/htmls/future-index.html
  73. 73.00 73.01 73.02 73.03 73.04 73.05 73.06 73.07 73.08 73.09 73.10 73.11 http://www.pakmission-uk.gov.pk/commsection/london/hydro_potential_may09.pdf
  74. http://www.wapda.gov.pk/htmls/sataparapj.html
  75. http://www.dawn.com/news/1032570/upgrading-small-hydropower-plants
  76. 76.0 76.1 http://pecongress.org.pk/images/upload/books/12-Mazhar%20Hussain.pdf
  77. 77.0 77.1 77.2 http://www.dawn.com/news/597545/naltar-hydropower-projects-delayed-2
  78. http://www.brecorder.com/top-news/1-front-top-news/109769-president-inaugurates-darawat-dam-project.html
  79. 79.00 79.01 79.02 79.03 79.04 79.05 79.06 79.07 79.08 79.09 79.10 79.11 79.12 79.13 79.14 79.15 79.16 79.17 79.18 79.19 79.20 79.21 http://www.wapda.gov.pk/pdf/BrochureFODPMarch2011.pdf
  80. http://www.wapda.gov.pk/index.php/projects/water-sector/operational/darawat-dam-project
  81. http://www.slideshare.net/accelerate786/hydro-resources-of-pakistan
  82. http://www.trust.org/item/20130515095151-n5g3m/?source=spotlight
  83. http://www.wapda.gov.pk/index.php/projects/hydro-power/future/chitral-power-enhancement
  84. http://www.slideshare.net/accelerate786/hydro-resources-of-pakistan
  85. http://www.wapda.gov.pk/vision2025/htmls_vision2025/njhp.html
  86. http://www.dailytimes.com.pk/business/24-Feb-2014/63-work-completed-on-neelum-jhelum-hydropower-project
  87. http://www.dailytimes.com.pk/default.asp?page=2010\07\12\story_12-7-2010_pg7_1
  88. http://www.dawn.com/news/1167908/another-51m-to-expedite-tarbela-project-completion
  89. http://www.dawn.com/news/1167908
  90. http://tribune.com.pk/story/965932/tarbela-fifth-extension-project-gets-cdwps-nod/
  91. 91.0 91.1 http://www.pcq.com.pk/2630mw-projects-approved-by-ppib/
  92. http://tribune.com.pk/story/628163/new-beginnings-progress-made-on-diamer-bhasha-project/
  93. http://tribune.com.pk/story/672982/energy-projects-eib-signs-e100-million-agreement-with-pakistan/
  94. http://www.dailytimes.com.pk/business/17-Feb-2014/eu-investment-bank-delegation-visits-keyal-khwar-hydropower-project
  95. 95.0 95.1 95.2 http://www.nation.com.pk/business/02-Dec-2013/32-701mw-power-projects-to-be-completed-in-7-years
  96. http://defence.pk/threads/infrastructure-development-in-pakistan.28647/page-387
  97. http://www.radio.gov.pk/newsdetail-59277
  98. http://wapda.gov.pk/vision2025/htmls_vision2025/dhp.html
  99. http://www.dawn.com/news/1082687/construction-of-7bn-dasu-dam-to-begin-this-year
  100. http://tribune.com.pk/story/678262/hydropower-project-afghanistan-raises-objections-over-dasu-project/
  101. http://www.dawn.com/news/1111967/world-bank-unanimously-approves-dasu-project
  102. https://www.facebook.com/dasuhpp
  103. http://pamirtimes.net/2011/11/12/shagarthang-hydropower-project-approved/
  104. http://resultdon.blogspot.com/2011/11/ecnec-friday-approved-26-mw-shagarthang.html
  105. http://tribune.com.pk/story/155524/hydro-power-electricity-project-on-taunsa-barrage/
  106. http://www.brecorder.com/agriculture-a-allied/183/1237094/?tmpl=component&print=1&layout=default&page=
  107. http://tribune.com.pk/story/955302/gulpur-power-project-to-get-320m-financing/
  108. http://www.ppib.gov.pk/
  109. http://www.hydroworld.com/articles/2015/03/pakistan-awards-us-1-4-billion-contract-for-720-mw-karot-hydroelectric-project-on-jhelum-river.html
  110. http://www.dawn.com/news/1207652/ifc-to-invest-100m-in-karot-power-project
  111. http://www.dawn.com/news/1210324/ecnec-approves-rs102bn-projects
  112. http://tribune.com.pk/story/684388/coal-based-ventures-chinese-firm-eyes-up-to-four-plants-at-gadani-power-park/
  113. http://tribune.com.pk/story/888499/addressing-shortages-adb-promises-65m-for-hydroelectric-power-project/
  114. http://tribune.com.pk/story/679046/power-sector-govt-opens-bids-for-kotli-hydropower-project/
  115. http://www.dailytimes.com.pk/default.asp?page=2010\04\10\story_10-4-2010_pg5_15
  116. http://www.wapda.gov.pk/vision2025/htmls_vision2025/basho.html
  117. http://www.dawn.com/news/1083152/accord-for-35mw-hydropower-project
  118. http://www.dawn.com/news/660997/15000mw-dam-project-shelved-by-wapda
  119. 119.0 119.1 119.2 119.3 119.4 http://tribune.com.pk/story/679362/power-board-approves-projects-of-2630mw-capacity/
  120. http://www.aecom.com/Where+We+Are/Asia/Energy/_carousel/Rajdhani+Hydropower+Project,+Pakistan
  121. 121.0 121.1 http://ppinewsagency.com/116430/ajkcdc-approves-39-development-projects/
  122. 122.0 122.1 http://dawn.com/2012/07/07/france-agrees-to-finance-hydropower-project/
  123. http://www.dailytimes.com.pk/national/03-Apr-2014/france-gives-rs-8-5bn-for-two-hydropower-projects
  124. 124.0 124.1 http://www.ppib.gov.pk/N_upcoming_hydel.htm
  125. index.html
  126. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  127. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  128. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  129. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  130. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  131. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  132. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  133. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  134. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  135. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  136. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  137. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  138. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  139. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  140. http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
  141. Lua error in package.lua at line 80: module 'strict' not found.
  142. 142.0 142.1 142.2 142.3 142.4 142.5 http://www.world-nuclear.org/info/Country-Profiles/Countries-O-S/Pakistan/
  143. http://www.dawn.com/wps/wcm/connect/dawn-content-library/dawn/news/pakistan/china-firm-aims-to-build-big-nuclear-plant-for-pakistan-jd-04
  144. http://www.dailytimes.com.pk/business/23-Jan-2014/meeting-of-na-body-500m-required-for-early-completion-of-960-mw-njhp
  145. Lua error in package.lua at line 80: module 'strict' not found.
  146. http://www.nytimes.com/2013/11/27/world/asia/pakistan-breaks-ground-on-nuclear-power-plant-project-with-china.html?_r=0
  147. http://www.dawn.com/news/1201662/pm-nawaz-inaugurates-k-2-power-plant-at-kanupp
  148. http://www.renewableenergyworld.com/articles/2015/01/pakistans-winds-blow-slow.html
  149. 149.0 149.1 Lua error in package.lua at line 80: module 'strict' not found. Cite error: Invalid <ref> tag; name "Iran_Pakistan_Joint_Venture" defined multiple times with different content
  150. 150.0 150.1 http://www.renewableenergyworld.com/rea/news/article/2015/01/pakistans-winds-blow-slow
  151. 151.00 151.01 151.02 151.03 151.04 151.05 151.06 151.07 151.08 151.09 151.10 http://www.thenews.com.pk/Todays-News-4-167078-Two-wind-power-projects-approved
  152. http://www.upm-cdm.eu/upms-pakistani-metro-power-and-gul-ahmed-wind-energy-projects-registered-with-the-cdm-2/
  153. 153.00 153.01 153.02 153.03 153.04 153.05 153.06 153.07 153.08 153.09 153.10 153.11 http://www.aedb.org/currstatus.htm
  154. 154.0 154.1 154.2 154.3 154.4 154.5 154.6 154.7 154.8 Lua error in package.lua at line 80: module 'strict' not found.
  155. http://www.MBM-ENGG.COM
  156. http://www.tbl.com.pk/the-feasibility-of-renewable-energy-in-pakistan/
  157. http://www.dawn.com/news/1180113/pm-nawaz-inaugurates-countrys-first-solar-park
  158. http://www.energymatters.com.au/renewable-news/pakistan-parliament-solar-em4786/
  159. http://www.pv-tech.org/news/largest_pv_project_in_pakistan_to_be_built_by_conergy
  160. http://tribune.com.pk/story/916741/mou-signed-norwegian-firm-to-set-up-three-solar-power-plants-in-pakistan
  161. Lua error in package.lua at line 80: module 'strict' not found.

External links